After the troubles of the Liz Line, and the mess that is the Crossrail 2 plan that is now most likely never going to get the light of day, I have to ask-is there any other ways we can boost transport capacity in London without Crossrails?
Crossrails have a major flaw in that, while one line on one side of London may be ripe for a metro service, the line on the other side probably would not. SW/NE, E/W and SE/NW allignments all run from areas with high frequency metro services, to lines where there is little in terms of inner suburban services. Furthermore, Crossrail's run into the problem of fitting into the complexity of rail routes in South London, and being able to serve either the City or West End, detrimental to passengers on routes such as the Eastern division, which has a terminus for each part of Central London-or adding patronage to other lines in the case of Crossrail 2, to allow passengers to continue reaching the City.
There must be other ways to boost capacity without Crossrails, such as:
-Extend the Victoria Line from Stockwell to Tooting Broadway, calling only at Balham and Clapham Common. This would suck up passengers that would already chnge onto the Victoria Line at Stockwell, so wouldn't add per se any new passengers onto the Victoria, but would keep more of the Northern Line free for passengers to the City.
-Build a fast tunnel from New Malden to Lewisham, via Waterloo and London Bridge. Connecting SWML and SEML fasts in a new tunnel would allow four dedicated tracks into Waterloo for SWML mainline locals and clear the route into Charing Cross for more Kent locals without having to build long Crossrails underneath London.
-Extend the Met to SE London.
This can be done by building a new alignment from Neasden, parrelling the MML to Finchley Road, then running in deep level via Baker Street, Marble Arch, Charing Cross, Aldwych, City Thameslink, Cannon Street and Waterloo. Surfacing to take up the Hayes and Orpington Lines. This would at least allow 8tph off peak to be distributed among the remaining suburban lines into London Bridge, and would connect two already busy surban networks (as oppossed to building a SEML to WCML/CML Crossrail)
-If CR2 must be built, would it not be cheaper to run along the ECML slows to the Hertford Loop? It would service Haringey and Alexandra Palace, areas that will be served by the Southgate arm of CR2 and would avoid the costs of tunneling and extra branch.
Crossrails have a major flaw in that, while one line on one side of London may be ripe for a metro service, the line on the other side probably would not. SW/NE, E/W and SE/NW allignments all run from areas with high frequency metro services, to lines where there is little in terms of inner suburban services. Furthermore, Crossrail's run into the problem of fitting into the complexity of rail routes in South London, and being able to serve either the City or West End, detrimental to passengers on routes such as the Eastern division, which has a terminus for each part of Central London-or adding patronage to other lines in the case of Crossrail 2, to allow passengers to continue reaching the City.
There must be other ways to boost capacity without Crossrails, such as:
-Extend the Victoria Line from Stockwell to Tooting Broadway, calling only at Balham and Clapham Common. This would suck up passengers that would already chnge onto the Victoria Line at Stockwell, so wouldn't add per se any new passengers onto the Victoria, but would keep more of the Northern Line free for passengers to the City.
-Build a fast tunnel from New Malden to Lewisham, via Waterloo and London Bridge. Connecting SWML and SEML fasts in a new tunnel would allow four dedicated tracks into Waterloo for SWML mainline locals and clear the route into Charing Cross for more Kent locals without having to build long Crossrails underneath London.
-Extend the Met to SE London.
This can be done by building a new alignment from Neasden, parrelling the MML to Finchley Road, then running in deep level via Baker Street, Marble Arch, Charing Cross, Aldwych, City Thameslink, Cannon Street and Waterloo. Surfacing to take up the Hayes and Orpington Lines. This would at least allow 8tph off peak to be distributed among the remaining suburban lines into London Bridge, and would connect two already busy surban networks (as oppossed to building a SEML to WCML/CML Crossrail)
-If CR2 must be built, would it not be cheaper to run along the ECML slows to the Hertford Loop? It would service Haringey and Alexandra Palace, areas that will be served by the Southgate arm of CR2 and would avoid the costs of tunneling and extra branch.