• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Do WCML stations have a worse service under VTWC?

Status
Not open for further replies.

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Post HS2 I want to be able to use the WCML to get from Wilmslow to Leicester, Northampton and Coventry in less time than it takes to get to London, which isn't the case today, and I expect to see a limited stop service south of Crewe which delivers this.

But you're being unrealistic - because Wilmslow - London is a direct service. Leicester, Coventry and Northampton can only be achieved by making a change which inevitably slows down the journey as you're dependent on a connection of some kind.

And I'm willing to be a pint of 'old and filthy' and a large pack of pork scratchings, that you're probably the only passenger who is looking to travel Wilmslow to Northampton, Coventry or Leicester and you're only talking about making that journey once or twice a month at best. Whereas there are rather more people wanting to travel to London and doing it rather more frequently.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Since Norton Bridge upgrade there should now, in theory, be an extra two fast paths each off-peak hour available from London Euston. Before Norton Bridge flyover was completed, it was being speculated that one of them might well end up being used as a second Liverpool. However, nothing has come of it.

Theory is all well and good, but facts tend to be better.

I'm sure somebody who's paid more than me and knows more about pathing trains than you can explain whether or not that's true - one for The Planner perhaps?
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,171
Location
Wilmslow
And I'm willing to be a pint of 'old and filthy' and a large pack of pork scratchings, that you're probably the only passenger who is looking to travel Wilmslow to Northampton, Coventry or Leicester and you're only talking about making that journey once or twice a month at best. Whereas there are rather more people wanting to travel to London and doing it rather more frequently.

You're quite right, I didn't make it clear that I don't want to slow down today's fast service to London to enable these journeys, that's why it hinges on HS2 taking these away. I'm already annoyed with the extra stops put in "my" trains from Wilmslow to London in recent years at Lichfield and Tamworth. Yes, I want to have my cake and eat it!
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Incidentally, my view that something should stop at Nuneaton isn't primarily to cater for the residents of Nuneaton (splendid people though they may be) but to provide connections to "the Eastern Counties" as they were once termed. Chester - Peterborough; Runcorn - Ely; Liverpool - Leicester; and so on.

But all of those can be done easily with one change at present - and without filling up already busy London services.

Once again, we're looking at a slightly academic set of examples - yes there may be some people wanting to make such journeys, but they're not significant numbers and are relatively infrequent travelers.

To take Liverpool - Peterborough as an example - Nuneaton - Peterborough takes 1h 20 currently.

Liverpool - Peterborough as an example takes 3h 20m.

Liverpool - Stafford is about an hour, so add a further 30 mins to get to Nuneaton fast (it's 40 mins as a stopper).

Add in 10 mins interchange time and you're looking at + 20 mins on the direct train, but without the risk of missed connections. That's not a significant time penalty - and it's certainly not worth the effort of trying to save those 20 mins for the relatively low traffic flow.
 

pt_mad

Established Member
Joined
26 Sep 2011
Messages
2,960
Theory is all well and good, but facts tend to be better.

I'm sure somebody who's paid more than me and knows more about pathing trains than you can explain whether or not that's true - one for The Planner perhaps?

Wasn't that the purpose of the Stafford and Norton Bridge upgrade in the first place?
 

pt_mad

Established Member
Joined
26 Sep 2011
Messages
2,960
It's all about HS2, isn't it?
Prior to VTWC, and in its early days when we were being told how dreadful the trains "inherited" from BR were, I used to travel from Manchester to London frequently and my train of choice ran non-stop from Wilmslow to Watford Junction, and sometimes changed there for Kensington Olympia which was useful.
In the first incarnation of the Pendolino service I had moved to Wilmslow and went Wilmslow-Crewe-Nuneaton-Leicester with ease.
In the current incarnation I have done Wilmslow-Crewe-Nuneaton-Coventry but this was for the novelty (at the time) of the new LM service from Crewe, it was tediously slow of course.
Post HS2 I want to be able to use the WCML to get from Wilmslow to Leicester, Northampton and Coventry in less time than it takes to get to London, which isn't the case today, and I expect to see a limited stop service south of Crewe which delivers this.
I'd LIKE to see a more comfortable Wilmslow-London service with better food which uses nice rolling stock as an alternative to the HS2 service, but that's probably a dream.
For speed I can drive to HS2 if I'm still capable of driving by the time it opens. But the real thing HS2 delivers to me and to many are significantly better options for journeys which aren't to London.

Well HS2 phase one to the Armitage WCML link is due to be in operation in 2026. So not that long. And the next WCML franchise even includes several years of responsibility for running HS2 services within it too.

So if what is planned is true, then in 8 years the very high frequency timetable will be confined to history anyway, and the WCML will probably run more like some of the other mainlines in the UK, with services stopping at more main towns than they miss out.

8 years is touching distance considering it will soon be ten years of the VHF timetable and it still feels relatively recent in the grand scale of time.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,235
But all of those can be done easily with one change at present - and without filling up already busy London services.

Once again, we're looking at a slightly academic set of examples - yes there may be some people wanting to make such journeys, but they're not significant numbers and are relatively infrequent travelers.

To take Liverpool - Peterborough as an example - Nuneaton - Peterborough takes 1h 20 currently.

Liverpool - Peterborough as an example takes 3h 20m.

Liverpool - Stafford is about an hour, so add a further 30 mins to get to Nuneaton fast (it's 40 mins as a stopper).

Add in 10 mins interchange time and you're looking at + 20 mins on the direct train, but without the risk of missed connections. That's not a significant time penalty - and it's certainly not worth the effort of trying to save those 20 mins for the relatively low traffic flow.

I think you're being a bit naughty here. I quite deliberately didn't quote Liverpool - Peterborough since there's already a through service!

I think I quoted Chester - Peterborough. Which can, indeed, be done with one change. Via Manchester. Or Stockport. Neither terribly attractive. (Unless you can offer a better option.)

And, yes, the individual flows will be small, but collectively they may be worthwhile and are the flows that rail currently struggles with because they are seen as slow and complicated.



[Incidentally, if we are finally going to rid ourselves of the Stoke wibble on the LNR Crewe-Euston that will clearly help to address the issue.]
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
Kidsgrove to Walsall.

Not exactly Orient Express material is it?

:D

I'd watch the film "Murder on the Kidsgrove-Walsall Express"

To be fair, it isn't going to Walsall (despite the obvious cinematic potential) it takes the Wolverhampton-Walsall stopper path between Wolverhampton and Birmingham, then carries on to Euston. What happens to the Walsall train, I am afraid Poirot will have to solve.


Maybe redirect the Walsall-Wolves service over the line directly connecting both towns? The lack of service on that mystifies me.
 
Last edited by a moderator:

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,949
Location
Fenny Stratford
Birmingham is not the main commuter flow from Nuneaton - never ever said that it wasn't the main commuter flow, this topic isn't about the cross country service, which is inadequate

but that is, surely, where the focus of service improvement can offer the most benefit. Longer trains get more people using them to get to work in the local economic centre?

WHY must Nuneaton have services at the expense of outer towns ( mainly Milton Keynes and Rugby?) - never, ever said that either in fact I have supported extra services for both as both were affected badly by the VHF timetable

You may not have said that but that is the reality of your position. To serve Nuneaton with more Virgin services mean someone else has to have a slower journey or lose their service. I don't think Nuneaton will generate the revenue to justify that decision.

Why would you bypass a major reveune point in Milton Keynes to offer people of Nuneaton a direct service to London on an hourly basis? Which towns will you deprive of services to fit in your almost pointless calls at Nuneaton outside of peak hours? Perhaps you could list them here with your reasoning? - Never ever said that either, all I have said is a better use of the available paths is to run an extra (or two) 1 25mph service instead of one current 110mph service, one which could run fast to Nuneaton or MK then Nuneaton, then serve the principle TV stations, then on to Liveprool or somewhere else. Or could stop the current Chester services at Nuneaton instead.

but people with better knowledge of how the railway works say that while this may be possible it might not be the best use of that capacity. That means someone must lose out to serve Nuneaton. That is the reality of the situation. The other reality is that those in charge of Virgin have decided that Nuneaton isnt really worth bothering with. They must have knowledge you don't about revenue.


Milton Keynes, yes it has become more important but I am not suggesting bypassing it just serving it in a different way and London will always be many times more important.

I honestly don't know what you are suggesting except an hourly first stop Nuneaton Virgin service. perhaps you could clarify your ideas. There are increasing numbers of commuters from the TV stations to MK. How do you serve them?

I would challenge that, for Nuneaton, London is more important than Milton Keynes. I suspect more people travel to work here than London. Perhaps you have some evidence to back up your claims?

As other posters said we did have an hourly London - Liverpool service stop at Nuneaton plus a few extras before VHF and there were signs even then that after all the disruption along the west coast were service were routinely diverted away from the Trent Valley that use was recovering strongly. Some good points made about connections at Nuneaton, some 600000 interchanges were made at Nuneaton, not insignificant at all.

Do you have any evidence of numbers using these services? I cant believe that Virgin would cut stops that were profitable. The fact they did suggests their data to show that Nuneaton was of less importance to their business than you think it should be.
/

Also, on this pathing issue, given that I sat down with someone from the DfT at the time of the 110 project and look at how the pathing worked I'd be surprised he got that wrong, he clearly said you can run 2 125pmh paths where one 110mph path exists, south of Nuneaton, we even went into how many seconds per mile a 125mph train would catch a 110mph train going through Weedon! I'd be surprised if he got that wrong.

But we return to the base point that you think that despite Nuneaton having a good service ( honestly!) you are unhappy that service is offered by scummy units rather than glorious Pendolinos. As if that matters.

My view is that apart outdside of peak hours the trains you want to see would be fairly empty. Remember they would run non stop to Nuneaton. During peak hours those trains would be fairly empty as i suspect the market for travel simply inst there in the numbers you suggest. In an ideal world with lots of trains, seats for all and space on the track you might be able to take a punt and see what happens. We don't live in that world.

For a comparison come and look at trains from MK to London at peak hours. Do you suggest that Nunaeton can match those levels? Really? Because that is the level that the TOC will want to see to persuade them to switch stopping patterns.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,666
Really they should make more of the Stoke - Derby route, if people feel there is untapped demand for more cross country services.

Leave the stopper as is, but then also run another variant of the services via Ely... up for much debate about the destinations at the end (which could vary), and capacity inc Ely and the ECML running - but for example:

Chester - Crewe - Derby - Nottingham - Grantham - Peterborough - Ely - Cambridge - Stansted

Hitting Crewe, Derby/Nott and Peterborough covers the three main trunks to the north. Most journeys should be possible. Deliberately avoiding Liverpool, Manchester and Sheffield here.
 
Joined
21 May 2014
Messages
985
Maybe redirect the Walsall-Wolves service over the line directly connecting both towns? The lack of service on that mystifies me.

It's a bit of a kettle of fish, this one... many people in the area would like to see the direct Wolves-Walsall service return. Unfortunately, the last time the service was run... nobody used it. *shrug*
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
It's a bit of a kettle of fish, this one... many people in the area would like to see the direct Wolves-Walsall service return. Unfortunately, the last time the service was run... nobody used it. *shrug*


Why did no-one use it?
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,235
It's a bit of a kettle of fish, this one... many people in the area would like to see the direct Wolves-Walsall service return. Unfortunately, the last time the service was run... nobody used it. *shrug*

I did! :D


(But would have to admit that it wasn't exactly crowded.)
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,235
Really they should make more of the Stoke - Derby route, if people feel there is untapped demand for more cross country services.

Leave the stopper as is, but then also run another variant of the services via Ely... up for much debate about the destinations at the end (which could vary), and capacity inc Ely and the ECML running - but for example:

Chester - Crewe - Derby - Nottingham - Grantham - Peterborough - Ely - Cambridge - Stansted

Hitting Crewe, Derby/Nott and Peterborough covers the three main trunks to the north. Most journeys should be possible. Deliberately avoiding Liverpool, Manchester and Sheffield here.

I'll let others comment on the pathing problems between Grantham and Peterborough, but will point out that Stoke - Kidsgrove is quite busy and threading a Chester - Stoke train across Crewe would be ... challenging. Perhaps it could hide in 12 and nip across when it sensed a gap! :D
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Really they should make more of the Stoke - Derby route, if people feel there is untapped demand for more cross country services.

Leave the stopper as is, but then also run another variant of the services via Ely... up for much debate about the destinations at the end (which could vary), and capacity inc Ely and the ECML running - but for example:

Chester - Crewe - Derby - Nottingham - Grantham - Peterborough - Ely - Cambridge - Stansted

Hitting Crewe, Derby/Nott and Peterborough covers the three main trunks to the north. Most journeys should be possible. Deliberately avoiding Liverpool, Manchester and Sheffield here.

With any making better use of Stoke-Derby, one inevitably runs up against the constraint of having to cross Crewe to get anywhere with a real market via a direct service (most likely Liverpool or Chester). North-South long distance flows to Brum or Euston are always going to be a more economic use of this capacity.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
I'll let others comment on the pathing problems between Grantham and Peterborough, but will point out that Stoke - Kidsgrove is quite busy and threading a Chester - Stoke train across Crewe would be ... challenging. Perhaps it could hide in 12 and nip across when it sensed a gap! :D


What infrastructure would be needed ro facilitate this move? I was going to answer my own question with 'HS2', but I suspect I'll get a clip round the earhole for that.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
With any making better use of Stoke-Derby, one inevitably runs up against the constraint of having to cross Crewe to get anywhere with a real market via a direct service (most likely Liverpool or Chester). North-South long distance flows to Brum or Euston are always going to be a more economic use of this capacity.

You've got to get through Stoke first - which is a challenge in itself. You've got 7 northbound departures an hour only one of which starts at Stoke.

You've got 6 southbound, of which 5 are heading down the Potteries line, so blocking anything coming off the Derby line.
 

ag51ruk

Member
Joined
29 Oct 2014
Messages
629
What infrastructure would be needed ro facilitate this move? I was going to answer my own question with 'HS2', but I suspect I'll get a clip round the earhole for that.

It's still technically possible but the movement blocks the up fast and slow lines plus the down fast - so couldn't be easily accommodated regularly during the day without affecting existing trains
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
What infrastructure would be needed ro facilitate this move? I was going to answer my own question with 'HS2', but I suspect I'll get a clip round the earhole for that.

HS2 Phase 2B is the correct answer.

Takes (effectively) a number current Pendolinos/Voyagers out of Crewe (and off Winsford-Weaver) and sticks them in a tunnel instead. Hence making regional services like this more feasible.

But of course some people say "HS2 only saves rich London businessmen 10 (sic) minutes getting to Birmingham"....
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
I think you're being a bit naughty here. I quite deliberately didn't quote Liverpool - Peterborough since there's already a through service!

I think I quoted Chester - Peterborough. Which can, indeed, be done with one change. Via Manchester. Or Stockport. Neither terribly attractive. (Unless you can offer a better option.)

And, yes, the individual flows will be small, but collectively they may be worthwhile and are the flows that rail currently struggles with because they are seen as slow and complicated.



[Incidentally, if we are finally going to rid ourselves of the Stoke wibble on the LNR Crewe-Euston that will clearly help to address the issue.]

Well the obvious answer is Widnes or Liverpool Line St - which does mean getting to them. But they'd have to get to Chester in anycase.

Travelling to the most appropriate railhead is what people in, for example, mid Herts do routinely. If you live in Hatfield for exampke and want to travel to Leeds or York, you'd go via Stevenage. But if you were going to Derby, you'd head to St Albans or Luton. And if it were Birmingham, you'd head to Watford.

It's the same principle - similar distances. The nearest station may not be the most appropriate one to start your journey from.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
That's the million dollar question. The bus is more frequent and cheaper. Takes ages though, especially at peak times. And who honestly wouldn't prefer to be on a train?

Probably simply that an hourly train is not adequate in a city context. Half hourly or even better 4tph and I expect it would be used adequately.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,666
With any making better use of Stoke-Derby, one inevitably runs up against the constraint of having to cross Crewe to get anywhere with a real market via a direct service (most likely Liverpool or Chester). North-South long distance flows to Brum or Euston are always going to be a more economic use of this capacity.

Chester was an example, but yes crossing Crewe is not ideal. Manchester Airport then perhaps - or even terminate at Crewe but then extend to Peterborough and beyond.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,355
Location
Bolton
The other reality is that those in charge of Virgin have decided that Nuneaton isnt really worth bothering with. They must have knowledge you don't about revenue.
They have however decided to provide no fewer than 5 morning peak fast services to London and 6 evening peak and late evening services from London. More than Tamworth and Lichfield, for instance. So there's clearly potential, just less than at Milton Keynes, Rugby, Coventry, Stafford and elsewhere.
 
Last edited:

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Probably simply that an hourly train is not adequate in a city context. Half hourly or even better 4tph and I expect it would be used adequately.

I don't think the frequency is the issue - look at why people travel.

If it's for work, how close are the stations to the areas of work?

If it's for leisure, how close does the train go to those places of leisure?

Walsall's station is near the shopping area, Wolverhampton's isn't.

No idea about the main areas of work.

But both places will have significant flows to Birmingham - New St is in the centre and chances are the train is less than city centre parking. International gets you to the airport or NEC - again parking costs tend to be high.
 

Deafdoggie

Established Member
Joined
29 Sep 2016
Messages
3,414
I'll let others comment on the pathing problems between Grantham and Peterborough, but will point out that Stoke - Kidsgrove is quite busy and threading a Chester - Stoke train across Crewe would be ... challenging. Perhaps it could hide in 12 and nip across when it sensed a gap! :D

I think extending it at the Derby end at least would be good. As far as Nottingham would be helpful. Obviously, the ideal solution is a fly-over from the potteries line to platforms 11 & 12. Anyone fancy writing the cheque?

LNWR stopping at Longport would help, and there is capacity for it too. Northern stopping at Longport would be a big help, but there is only capacity (regularly) North bound-so not much help! I guess stifling demand is actually a better option in this case.
 

pt_mad

Established Member
Joined
26 Sep 2011
Messages
2,960
They have however decided to provide no fewer than 5 morning peak fast services to London and 6 evening peak and late evening services from London. More than Tamworth and Lichfield, for instance. So there's clearly potential, just less than at Milton Keynes, Rugby, Coventry, Stafford and elsewhere.

14 daily weekday services at Nuneaton according to journey planners. Less at Tamworth and Lichfield. But only 5 at Nuneaton on a Saturday.

One thing that looks apparent is that VT provide the bulk of the morning London services. Only one LNR service that reaches London before 0930. The others are all VT services. So the morning anytime fares must be set at the VT rate, and cutting Nuneaton out all together (although I know that's not suggested) would presumably mean the anytime fare price would revert to the LNR only anytime rate, and LNR would probably have to provide more services in the morning peak but would take all the revenue.

So to suggest that perhaps the revenue at Nuneaton isn't that attractive to VT, they presumably take the bulk of the morning London revenue and only one LNR calls there in the main morning London peak. One wonders why LNR provide an hourly London service through the Trent Valley but not in the morning peak. Is it because VT have rights over those stops?


Re: small towns needing the passenger numbers that Milton Keynes gets to be worth stopping an express, do Stafford and Wilmslow get these numbers in the off peak? How about Sandwell and Dudley?
 
Joined
21 May 2014
Messages
985
Walsall's station is near the shopping area, Wolverhampton's isn't.

Eh? Wolverhampton Station might not be smack bang in the middle of town like Walsall's, but it's not far at all! Google has it at 7 mins walk or 0.4 miles to the Mander Centre (if you consider that the main shopping area). Slightly less to Dudley Street, the main high street.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,832
Location
"Marston Vale mafia"
Was going to say I was fairly sure I route-marched from the station to Maccy's and back in about 20 minutes including being served. And plenty of other people were walking between the station and the shops too.
 
Status
Not open for further replies.

Top