If the sleepers went via the ECML then York would seem to be a sensible place to call, and there certainly are some long platforms there
If the sleepers went via the ECML then York would seem to be a sensible place to call, and there certainly are some long platforms there.
Maybe if Euston is becoming awkward for the sleepers then Waterloo International might come back into use?
The Night Riviera actually did run from Waterloo for some time in the 1990s.I would have thought the Night Rivera could run from Waterloo to Reading without too much difficulty
I wonder if it wouldn't be possible to put all the sleepers into Waterloo Int? So you could have the Highland, Lowland and Night Rivera all departing from and arriving into the same London terminus. I would have thought the Night Rivera could run from Waterloo to Reading without too much difficulty, so what about the Cally sleepers and getting access to the WCML?
Euston can fit sixteen carriages?
If you wanted to fit more, given it's the middle of the night and not exactly pressured for time, would it be out of the question to have two sets of carriages on adjacent platforms, coupled together on leaving the station?
That wouldn't be an issue though if the new stock is EMUs.I think that the need to haul the service up both Shap and Beattock would impact the length of what the loco could feasibly haul
One problem may be the morning arrival - could Waterloo accommodate the Sleepers (And the shunting etc)? Maybe the "Eurostar" platforms?
Well if you were to commit a Cl92 to it you could go mad and haul god knows how many carriages up Shap with little trouble, but that would limit the trains top speed to 87mph which might remove some of the slack in the timetable.
That wouldn't be an issue though if the new stock is EMUs.
(not that the Sleepers will ever see a new build of EMU)
To save having to use two drivers north from Euston when once the train has been joined you would only need one. As for saying that there won't be a new build of EMU sleeper stock, if this sleeper is to continue then there would have to be a new build of stock some time and there would be little benefit in ordering loco and stock when EMUs can be used.But then if they are two separate EMUs running from adjacent platforms, why bother combining them? You could run them as separate services and therefore avoid the complication of joining/splitting.
Yes, I expect an off the shelf EMU design could be modified for use in a new order of sleeper stock.Well that depends if the renewal actually takes place, if it does I could see the order for sleeper vehicles simply being added onto the next convenient stock order, which would probably be for EMUs of some sort.
One problem may be the morning arrival - could Waterloo accommodate the Sleepers (And the shunting etc)? Maybe the "Eurostar" platforms?
Using the Windsors for access to Waterloo Int, especially from right the way from Clapham practically, could potentially throw up problems.
The sleepers arrive pretty early into London, so I doubt finding paths would be too much of an issue.
Running into possessions could be though. I gather the times between possessions being given up and the first train are fairly tight in that neck of the woods.
I thought that all the 92s had the same train supply output? Or is it only the former EPS locos that are fitted with the UK "flavour" of ETS.Plus only a small handful of 92's have UK compatible ETS.
Ahhh so it's the case then that the Nightstar stock would have used European type train supply. It's only just dawned on me that that would be why none of the 92s were initially fitted with the UK type. Previous post rendered obsolete!I believe at least one, maybe a couple more, was converted to handle UK ETS supply.
