Grimsby town
Member
- Joined
- 4 Apr 2011
- Messages
- 861
Also look at the space Zurich Hbf has to work with. Its something like a 15 track throat leading into the station. UK stations don't have anything like that and will never have the space for it. There's simply no way everything can arrive at the same time each hour at UK stations.Yes, and look at the money they've thrown at it - two additional underground stations and loads of new connecting lines. It is impressive - and expensive!
And even then the timetable is designed so that passengers don't have to change, even when it means running two trains carrying fresh air 5min apart every hour on the Engadine line. There was an almighty fuss when the Jurafuss line through Neuchatel lost its through service to Geneva recently.
As Doncaster as already been mentioned, and there were opposed plans to split Cleethorpes-Manchester services there at one point, I'll use that as an example. A split Cleethorpes to Doncaster would arrive in Platform 0 and the onward service is likely to depart from platform 8. That's a significant walk. If something delays the train from Cleethorpes, its unlikely that the Doncaster portion would be held because of the knock on effect it would have on services in Doncaster, Sheffield, and Manchester. So the through service would be made significantly worse.
We're slightly different from Switzerland in that we also have a much higher population that can justify more direct services and higher frequencies meaning that connecting services are less of a requirement.