ReeceEmmitt
Member
- Joined
- 5 Oct 2014
- Messages
- 43
Bear with me on this one - just wondering about the feasibility of something and thinking outside the box a bit. I am nothing but a interested commuter, so forgive me if there is any huge technical elephant traps.
Would it be feasible to connect a Mk 3 carriage to a Mk 3 derived DMU (for eg, a 150) to increase capacity as a short term expediency, or would the technical considerations/resultant impact on DMU performance be too significant to be overcome?
I look forward to your knowledgeable views.
Would it be feasible to connect a Mk 3 carriage to a Mk 3 derived DMU (for eg, a 150) to increase capacity as a short term expediency, or would the technical considerations/resultant impact on DMU performance be too significant to be overcome?
I look forward to your knowledgeable views.
