FGW only have 150s, 165s and 166s.
ATW get 158s released by FGW to deal with the long awaited Cambrian 1tph project and to cascade some 150s away from some of the longer distance jobs they are not suited for.
Result ATW only have 150s, 158s and 175s.
Do ATW get Cardiff - Portsmouth as well? If not, you've left FirstGW with no suitable trains to run the Cardiff - Portsmouth service (it is a regional express service, and 150s, 165s and 166s are all suburban stock).
<heretic mode>give them to Northern - a nearby operator of 75mph DMUs who are based over the border in England?</heretic mode>
Wrexham - Bidston is the probably only ATW route (unless you introduce a Bangor - Llandudno stopper perhaps) which will be suitable for class 150s after the valleys are wired, so transfering it to Northern sounds like a great idea. Similarly, since Cardiff - Cheltenham has been left off the electrification programme it needs some outer-suburban DMUs. Suggestion: give it to FirstGW and clear it for 165s or 166s.
The Conwy valley is always going to be an awkward island whoever operates it, putting on a Llandudno - Holyhead stopper might give it something to interwork with and get units back to Holyhead depot at night, but it still would be a microfleet.
At the very least, we should be able to rid ourselves of all 142s. The 143/144 builds are supposed to be somewhat better, which is why Porterbrook have proposed this overhaul; so that they then can flog them out to anyone who needs a diesel unit, seeing as no ROSCO wants to build any more (forgetting IEP as that is a different market altogether).
IEP isn't being built/specified by a ROSCO... IEP is being built to serve a different market yes, but the Intercity market sector is even more likely to have strong cases for electrification. I'm with the ROSCOs on this, don't build diesel trains. IEP has been signalled onto the wrong track.
What routes do ATW use 150s on that they aren't suitable for?
Fishguard daytime boat train for one.
I don't think 150s are ideal for the journey times from Swansea to Pembrokeshire either, but the 90mph top speed of a 158 isn't needed west of Swansea. That's why I shall be suggesting class 156s, double 153s or 155s running HOWL and west-of-Swansea services (except any remaining through services to/from Cardiff, which should be 158s) to the Wales & Borders franchise consultation on the National Assembly for Wales website.
Given there's capacity concerns about the diagrams ATW use the 2 car 175s on and they are long distance routes would giving them more 158s allowing the 175s to operate doubled up on long distance routes be a good idea?
Since the 175's home is Chester the Wales & Borders franchise is probably stuck with them. Therefore I'd suggest removing the cabs on some of the driving vehicles and fitting inner-ends instead to form the 175 fleet into a mix of 3-car and 4-car sets. Some additional 158s would be needed to cover the reduction in number of units, unless north Wales is wired in which case EMUs can cover that and 175s can be concentrated on Chester/Manchester - Cardiff/Swansea/Bristol work. Alternatively, other than the excessive top-speed, the 2-car 175s would do nicely on HOWL (extend the service to Crewe at the north end and it's only a short hop to their Chester base).
Doesn't bother me in slightest, a continued rolling programme of electrification makes the Wales and border franchise a nonsense anyway. It's already going to create a west Wales and HOW dmu sub fleet based in Swansea. If n Wales coast is wired a small sub fleet of emu,s just for it is crackers. Wrexham to Bidston if Wired is a no brainier to be with Merseyrail. Likewise 1 atw dmu path per hour will not make business case for wolves to salop wires.
There would be two trains an hour (one ATW and one LM) to electrify between Wolverhampton and Shrewsbury if Cambrian and Wrexham services terminated at Shrewsbury.
As for north Wales electrification, I doubt current routes would make the case for wiring. If trains from Wrexham terminated at Chester and trains from Holyhead/Llandudno ran to Manchester/Crewe it might just cut it (the Crewe service would be extended to Birmingham once the wires go up), but there is no suitable rolling stock in existance for such a service. An OHLE version of the class 444, in a mix of 2-car and 3-car lengths (allowing 5-car workings with seperate portions for Holyhead and Llandudno) would do the job. Another TOC that could use trains like that (though more likely in 4-car sets) would be Trans Pennine Express. How well would giving north Wales services to TPE work? The Birmingham service might not fit, but 4-car OHLE 444s could fit with LM as well I suppose. This whole franchise boundaries malarky is complicated isn't it?
as an aside, I know drivers don't like them, but from a passenger, catering, guard point of view it is something of a pity that the 170, 171, 172 (some of), 175 and 185 were all built without end gangways.
I'd even go further, and suggest that no MU, other than 125mph express ones, from 1980 onwards should have been built without a passenger-usable (secure cabs) gangway outer end.
What I would say is that no multiple unit should be built without a passenger-usable (secure cabs) gangway outer end unless the units are long enough that you are pretty dam sure you will never need (or be able) to operate them in multiple in passenger service.