DynamicSpirit
Established Member
I think that triangle junction would actually be a very good idea - there could be trains from Canning Town and other points to the west directly to Thamesmead, other trains directly to Beckton and/or some that "bounced" into Beckton and then on towards Thamesmead - automated DLR trains don't need the driver to change ends so the station stop shouldn't take noticeably longer than other intermediate station stops.
I can see the attraction of a triangle junction for operational flexibility, but I'm sceptical whether the timetable would work the way you're suggesting. The problem is any train that goes directly to Thamesmead is likely to catch up with, and possibly overtake, a preceding train that goes via Beckton. That would make for a very uneven timetable at Thamesmead, and might mean that almost no-one uses the via Beckton trains between Thamesmead and Beckton. Plus you'd have a lot of conflicting moves constricting the timetable. And doesn't the DLR still often run with a 'driver' at the front of the train in the evenings? (I know they used to, but haven't travelled much on the DLR for several years)