DLR extension to Forest Hill?

Status
Not open for further replies.

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Consultations are now underway in the affected areas as TfL draw up proposals to extend the DLR from Lewisham to Ladywell, Medusa, Catford and Forest Hill. Reactions have been positive in Ladywell, though people in Forest Hill feel that it would be better being built on the other side of Forest Hill to serve Bellingham too. This was included in Boris Johnson's 'London Plan' last year. Also in the Plan was the extension through Gallions Reach to Dagenham Dock, though this is still unfunded. In addition, studies are being made into the following extensions:
Stratford Intl-Leytonstone-Walthamstow Ctl;
Lewisham-Hither Green-Hayes-Beckenham-Catford.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,272
Location
North West
I'd quite like to see the Docklands Light Railway extended from Lewisham to Hayes via Catford Bridge, replacing the Southeastern shuttle that remains entirely in Greater London but does not run on the main line. I realise that Southeastern trains from the coast via Orpington are sometimes rerouted via Catford Bridge when there are engineering works in the Grove Park area.

Talking of the DLR extensions, I look forward to the service to Stratford International opening. I gather this is due to happen in July.
 

Ivo

Established Member
Joined
8 Jan 2010
Messages
7,307
Location
Bath (or Southend)
It was also due to open in Autumn last year. That didn't happen.

I believe Network Rail suggested the Bakerloo should assume the Hayes branch? It is far from a shuttle service, that is for sure!
 

SWTDesiro

Member
Joined
3 Jul 2011
Messages
32
Location
Twickenham, London, England
If the DLR went into Central London that would top it all. Because it's a bit of a hassle having to go all the way to Tower Gateway or Bank plus it could provide more stops in the Westminster Area.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
If the DLR went into Central London that would top it all. Because it's a bit of a hassle having to go all the way to Tower Gateway or Bank plus it could provide more stops in the Westminster Area.

I've often wondered how much tunnelling would be required to make the DLR connect to the Waterloo & City. If that could happen, it might mean an extra station at Blackfriars and a link from the Docklands to Waterloo for commuters. The problem would be capacity, since the W&C can get very busy during the peaks. Still, it might be possible to run at an increased frequency, and it would certainly save people a lot of walking at Bank.
 
Joined
2 Jun 2009
Messages
1,135
Location
North London
On the subject of the DLR, is there an actual opening date for the extention to Stratford International ?

I, for one, feel this has been going on far too seriously long enough by half.
 

Crispy75

Member
Joined
10 Jun 2011
Messages
25
No official word, but logic says there's no point in running trains until the shopping center opens on 13th September.

As for extending past Lewisham, that's no trivial matter. The station is sandwiched between the mainline viaducts and the A20. Is the intention to get up onto the viaduct and take over the Lewisham-Hayes line? That would be a steep gradient. Or is the intention to lower the tracks into tunnel for an entirely new route? Either way, not simple.
 
Last edited:

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
I've often wondered how much tunnelling would be required to make the DLR connect to the Waterloo & City. If that could happen, it might mean an extra station at Blackfriars and a link from the Docklands to Waterloo for commuters. The problem would be capacity, since the W&C can get very busy during the peaks. Still, it might be possible to run at an increased frequency, and it would certainly save people a lot of walking at Bank.

There have been proposals on many occasions that the DLR could be extended to Charing Cross, then possibly Green Park by using the old Jubilee line tunnels between Charing Cross-Green Park. The plans never came to anything significant though.
 

TheManWho

Member
Joined
15 Jul 2010
Messages
173
On the subject of the DLR, is there an actual opening date for the extention to Stratford International ?

I, for one, feel this has been going on far too seriously long enough by half.

I understand that shaddow service will operate on the new extension (where trains run to schedule but without passengers) on the 8th August, which may be put back to 15th August at the latest depending on any final snagging points.

The shaddow running will probably operate for around 2 weeks, allowing train operators to be route learned and to sort out any signalling niggles before full opening occurs
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
There have been proposals on many occasions that the DLR could be extended to Charing Cross, then possibly Green Park by using the old Jubilee line tunnels between Charing Cross-Green Park. The plans never came to anything significant though.

I can understand that if they extended the line from Tower Gateway, using the original Fleet Line route to Cannon Street, Ludgate Circus, Aldwych and Charing Cross. The Bank branch would have problems negotiating the Waterloo and City without substantial modification.
 

Batman

Member
Joined
27 Jun 2011
Messages
497
Location
North Birmingham
I thought the Chelsea and Hackney Line (or the King's line, the cross city line, the Boris line, the 20 years too late for the olympics line) or whatever it's called nowerdays would be the next BIG rail project in London.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,272
Location
North West
I can understand that if they extended the line from Tower Gateway, using the original Fleet Line route to Cannon Street, Ludgate Circus, Aldwych and Charing Cross. The Bank branch would have problems negotiating the Waterloo and City without substantial modification.

I'd like to see the DLR extended from Bank, either to Waterloo in place of the Waterloo & City Line, or to Charing Cross via a part new tunnel, linking up with the former Jubilee Line platforms. I gather a tunnel was built about 3/4 of a mile beyond Charing Cross on this now-closed section but then abandoned.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Yes, the tunnel does continue for a short section after Charing Cross.
 
Status
Not open for further replies.