A 2x20m EMU would be usable elsewhere on the system though.
I think you're seriously confused here. FGW are helping finance the purchase of AT300s- essentially, class 800s with uprated/next evolution engines- for services to the West of England. These will have the same 25m carriages as the 801/800 and will be high speed units, in 5 & 9 car formations (as I understand it)
The only operator (at the moment) getting AT200s, using a 23m body length, is Scotrail. These will be pure EMUs for the Edinburgh - Glasgow (and associated lines) electrification, in 3 & 4 car configurations.
The idea, at all, of ordering a fleet of two (maybe three) two car emus- or even 3 car- for the Marlow Branch, used for what must be ~500,000 passenger journeys per year (can't simply add station usage figures as that would double-count many passengers) is simply fantasy- though clearly, something expensive will have to be done at some point, be it extensive reconfiguration or a micro-fleet. I'd imagine that Reading-Gatwick, being currently worked by ~70m three car turbos, could probably be worked by 80m 4-car EMUs as part of the Reading based fleet- by the time it comes to it, the 365s that are being cascaded may be on the point of replacement, so a larger fleet would be easy to order
Nope, not allowed (unless you can get a derogation), especially if it is replacing a straight platform (which means you wont get the derogation)!
Next idea!
If you look under the details under http://www.hitachirail-eu.com/at-200-regional_46.html the AT200 can be ordered in 20M - 26M car lengths.
If the scissors scheme happens at Bourne End, it is possible a slightly shorter new junction might be designed which could reclaim that 2m or so difference in unit length. It might also be possible to move the friction buffer-stop a couple of metres at the other end of platform 1. I don't know why there isn't a friction stop for platform 2, but with greater use of both platforms associated with a half hourly service passing at Bourne End a new buffer-stop will likely be required for platform 2 as well, placed with similar considerations. So in my opinion it seems likely 3x20m car trains could be accommodated on both platforms, with the additional starting signal as illustrated in my sketch http://www.townend.me/files/bourne-end2.pdf to cater for longer trains (with SDO) starting back towards Maidenhead for the limited through services to London.
I was thinking, could a class 466 be altered to AC easily? As in fit a transformer and a pantograph and off it goes? If so surely that's the answer. GW could swap say 4 365's for 5 or 6 466's? Gives South Eastern a few more extra carriages for 12 vice 10 car trains and 8 vice 6.
6 466's could work:
1 on the Marlow - Maidenhead
1 on the Windsor Branch
1 on the Henley Branch
1 on to attach on to a 365 on a peak train off Henley and return
1 on to attach on to a 365 on a peak train at Bourne End and return
1 maintainace spare
165's can be released elsewhere.
It would involve major reconstruction to make the structure crashworthy. Probably not worth it.
For those going on about two-car emus, the same article says it is very difficult to fit in all the kit necessary for a modern 25kv emu for the UK on and under two cars, never mind batteries. .
Which means it will never be done.
My question really is, is a 365 just a re-geared 465 with a pantograph or is it a completely different electrical design?
We don't need a "modern" 25kV EMU, we need a 25kV EMU suitable for short journeys.
Hell if you gave it corridor connections so it could be used in multiple with other units on other duties, it doesn't even need a toilet.
2 car 25kV EMUs have been done before by British Rail, with far bulkier equipment that we use today for traction equipment.
So while the 365 is a dual voltage 465, it's not economically possible to turn a 466 into, presumably, a 366.
We don't need a "modern" 25kV EMU, we need a 25kV EMU suitable for short journeys.
Hell if you gave it corridor connections so it could be used in multiple with other units on other duties, it doesn't even need a toilet.
2 car 25kV EMUs have been done before by British Rail, with far bulkier equipment that we use today for traction equipment.
Seeing as we are talking about the Marlow branch, does anyone know if the original Crossrail plan of building a new platform at Maidenhead for the branch is going ahead? I know in the original plans it was necessary due to the number of proposed terminating services at Maidenhead, but that was before it was announced that some services were extended to Reading.
Not sure if this has been suggested already, but couldn't Southern lease 2 or 3 377/2s or /5s after they've been replaced at Thameslink to Great Western, and take a non-panto carriage out and extend some other units to 5 car? The 3 car electro can run on the branch, and Southern can boast about extended trains. Everybodys happy!
Apart from the DV 377s already having a future plan, the experiment to turn a four car 377 into a five car resulted in failure when Southern tried it before. Basically it needs a new software writing which isn't cheap especially for a couple of non standard units.
Why don't the manufacturers design them so that their units can have any number of coaches?
The 3 car EMU design solution for the Thames branches lies with whatever will be ordered new for the Welsh valleys. A follow on order is then expected to be the most cost effective way of sorting the issue out.
That is all presuming the Welsh go for a new build! But a 3 x 20m set is the current long term planning assumption here. That will allow a few four car sets to either migrate west or get used for even more growth.
The 3 car EMU design solution for the Thames branches...
Not just the one branch is the current long term thinking. A four car 100mph unit is a bit generous on some of them but there is nothing else to be had, at the moment.
The idea that cl.313 units could be used was mooted by someone at the DfT until they were told that replacing a 1990's turbo with a tired 1970's EMU was not going to go down well at all with punters who pay quite a bit for their seasons.