imagination
Member
- Joined
- 3 Aug 2010
- Messages
- 502
Let's make all trains on the GWML be hauled by an electric for the first little stretch of their journey because it has wires!
Oh wait...
Oh wait...
That's too close to the loco and stock concept though. Train builders are simply not prepared to build to offer that these days.I had a radical proposal for IEP which got me into trouble at work. I suggested we go to Derby, break out the HST plans, tart them up for 21st century and build some more on the basis that a) they have been going for 30 plus years so the original design must have some good points, b) people like them, c) we know how to build and maintain them d) it will be cheaper than building from scratch e) we could make an electric version to!.
That's too close to the loco and stock concept though. Train builders are simply not prepared to build to offer that these days.
I was informed that the reason we got stuck with the Voyagers was for the reason above when the issue was discussed at length elsewhere.Really? Who do those crafty foreigners get to build engines and carriages?
It is annoying that VAST sums of money are spent on putting the wires up and then not using them. However, the main problem, as touched on above, is the lack of suitable stock.
We are stuck with the current arrangements until someone makes a dual power source Voyager, some new (decent!) EMU stock is ordered, more 390s appear (more than the 4 already on order) or loco and stock makes a comes back. None is on the cards right now for various issues such as HF timetables but mainly due to funding issues.
Really? Who do those crafty foreigners get to build engines and carriages?
A little bit off topic, but this has reminded me, quite often getting off my train in the morning I see a Turbostar at East Croydon - running err... over the third rail. Over the past week or so seen one heading North on platform 3 and one heading South on platform 6, cant remember the exact times but it would have been around 8-8:30 am I suppose.
Perhaps someone knows the route this train is travelling or whether its just running as breakdown cover or stock shortage or something.
ROSCOs - it's what they are there for.... But who would order them and who would pay for them (and how many would be needed)? ...
Are you meaning OBB's Railjets? That was more a case of OBB having overordered Tauruses and using the stored locomotives with new stock was cheaper then ordering units.
Wouldn't work over here because we don't have many 125mph+ locomotives spare and certainly no 140mph ones like OBB
I was informed that the reason we got stuck with the Voyagers was for the reason above when the issue was discussed at length elsewhere.
However there isn't an "off the shelf" loco and stock option is there? I seem to remember Virgin went to Bombardier and said something like we want a train that is xxxxx and the Voyager is what they were offered.Rolling stock builders will build whatever is asked of them. If I placed on OJEU a tender for 1000 coaches I can assure you the usual suspects will respond. You won't get no bids because it is not a multiple unit!
However there isn't an "off the shelf" loco and stock option is there? I seem to remember Virgin went to Bombardier and said something like we want a train that is xxxxx and the Voyager is what they were offered.
Not sure what the relevance of 125+mph locos is, we have plenty of underworked or stored reasonably modern locos which might need a bit of money splashing on them or if you want to make a proper job of it order new Siemens/Bombardier loco platforms which, warning, joined up railway thinking, could be used almost 24/7 on overnight sleeper/freight/parcels traffic...
quite clever that it probably is doable and with freight at night would it do any harm that you time crew change overs to be where electric disel boundries are and change locos?We may well have seen it had it not been for sectorisation.Passengers in the day other work at night where have I heard that before? Oh the class 91
I would have thought it would be better to detach the 91 at Edinburgh rather than drag it.In a ideal world, 91s would be dragged to Inverness and Aberdeen from Edinburgh and then under their own power when the lines to Aberdeen and Inverness get wired up using 67s to do this.
The class 91 wouldn't make a great choice as a "night freight" loco for 3 reasons that immediately spring to mind:
1 - It's got loads of power, yes, but a pretty poor tractive effort.
2 - It's electric, so is route limited.
3 - Where and when would they get servicing and maintenance done? If they're on passenger duty in the day and freight duty at night when would they get the chance - and when I spoke to some of the guys at Bounds Green a couple of years back they said that they needed 29 of their 31 sets to make the daily service. It's not like they have locos lying around to spare.
It all sounds good in theory, but I can see why it never took off as a practical idea.
1&2 valid points.. 3, dont use all of them at night use half fleet, therefore half can be maintained over night alterante nights weeks or whatever?
I remember in the 1970s and early 80s cases of northbound F/Liners waiting for hours and hours, sometimes days, at Willesden with no forward electric traction.Not sure what the relevance of 125+mph locos is, we have plenty of underworked or stored reasonably modern locos which might need a bit of money splashing on them or if you want to make a proper job of it order new Siemens/Bombardier loco platforms which, warning, joined up railway thinking, could be used almost 24/7 on overnight sleeper/freight/parcels traffic...
The voyager was hardly off the shelf was it. It still needed converting to uk loading gauge. I am sure Virgin asked for multiple units!
But as I said above when it was discussed elsewhere, it seems underfloor engine DMUs were all that were offered by the train builders at the time.Virgin planned for a mixed fleet, DMUs for short haul, something HST like for longer runs
It is valid even if they put them on the sleepers at night the would have hit the next exam quicker. I think they are too intensively used in the day to make night work possible. The don't get much down time either. By the time you take the coaches to the depot, detach loco, pick up next job and do the same in reverse you won't get much night work done.
I would have thought it would be better to detach the 91 at Edinburgh rather than drag it.
But as I said above when it was discussed elsewhere, it seems underfloor engine DMUs were all that were offered by the train builders at the time.