• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

DfT publishes Cross Country Prior Information notice

Status
Not open for further replies.

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,263
Location
West Wiltshire
Expecting direct award October 2023
The contract will be a core term of 4 years with available additional rail periods up to a maximum of 8 years.
The rail contract between the Secretary of State for Transport and Cross Country, dated 13 October 2020, ends on the expiry date of 15 October 2023.

This prior information notice informs the incumbent train operator that we seek to obtain a direct award at the end of the current contract.

II.2.4 Description of the procurement​

Contract for provision of commuter, regional and long-distance rail services on the UKconventional mainline rail system. It is envisaged the services will be substantially similar to those currently operated under the XC Trains Limited Rail Contract (dated 13 October 2020), but subject to route operating and value for money (VfM) review. It is envisaged the services would run between:
  • Plymouth — Edinburgh via Leeds, with a limited service to and from Penzance – some services are extended to Glasgow via Motherwell and also to Dundee and Aberdeen
  • Reading — Newcastle via Doncaster
  • Bristol — Manchester
  • Bournemouth — Manchester via Coventry
  • Nottingham — Cardiff via Gloucester
  • Birmingham — Stansted Airport via Leicester and Peterborough
  • Birmingham — Leicester local services
A Direct Award is now envisaged, in line with the policy published in March 2013 issued further to Section 26 of the Railways Act 1993.II.1.4 (nature and quantity of services or indication of needs and requirements).

There is a mixture of leisure, business and commuter travel on these rail services.
Is Reading-Newcastle a new route, or is it a variation of the services currently working to Banbury?

 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gabrielhj07

Established Member
Joined
5 May 2022
Messages
1,620
Location
Herts
I notice it doesn’t say too much about how the current service will be improved.

Is Reading - Newcastle a new one or a restoration of a previous service? I can’t recall ever seeing one.
 

uww11x

Member
Joined
9 Sep 2012
Messages
402
I'd imagine this longer term view will see Cross Country look at fleet options?
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,759
I notice it doesn’t say too much about how the current service will be improved.

Is Reading - Newcastle a new one or a restoration of a previous service? I can’t recall ever seeing one.
Before COVID 1tph, Reading, Oxford, Banbury, Leamington, New Street, Derby, Sheffield, Doncaster, York, Darlington, maybe Durham, Newcastle (with various extensions at either end to Guildford/Southampton/Edinburgh at various times)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,313
I'd imagine this longer term view will see Cross Country look at fleet options?

It’s less than the 2019 service pattern, because they’ve apparently removed the extensions either end of the Reading - Newcastle service? So I would expect DFT would reckon the existing fleet was adequate?
 

gabrielhj07

Established Member
Joined
5 May 2022
Messages
1,620
Location
Herts
Before COVID 1tph, Reading, Oxford, Banbury, Leamington, New Street, Derby, Sheffield, Doncaster, York, Darlington, maybe Durham, Newcastle (with various extensions at either end to Guildford/Southampton/Edinburgh at various times)
Thanks.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
It’s less than the 2019 service pattern, because they’ve apparently removed the extensions either end of the Reading - Newcastle service?
Other than Southampton the extensions were all in marginal time. There did appear to be an aspiration at one time for Exeter to Manchester and Southampton to Newcastle to be the core service, but the latter was restricted by freight paths.

Also hourly to Bournemouth throughout the day?
I don't think anyone should get carried away thinking that the full pre-2020 timetable is necessarily restored. All of the routes noted currently run, just not every hour, and in some cases only a few times a day.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,814
Location
UK
People are reading far more into this than there really is! It's effectively just an extension of Arriva's current contract. Under the current arrangements, the DfT has the power to change TOCs' routes at any time, and indeed the PIN hints at the possibility of some routes being removed:
but subject to route operating and value for money (VfM) review
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,403
It's effectively just an extension of Arriva's current contract.
Indeed, and that could mean keeping the same timetable throughout the 8 year period, or indeed trimming it back further. The wording of the fuller quote certainly doesn't imply expansion of the service offering, particularly referencing 'substantially similar'.

It is envisaged the services will be substantially similar to those currently operated under the XC Trains Limited Rail Contract (dated 13 October 2020), but subject to route operating and value for money (VfM) review.

== Doublepost prevention - post automatically merged: ==

How does the renewal process now work?

Arriva are the incumbent operator. Do they simply continue to be the operator until they or the DfT decide otherwise, with a succession of direct awards?

If Arriva want a higher fee than the DfT wants to pay, does the DfT go to the market to find someone else?
 
Last edited:

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,357
Location
Bolton
If Arriva want a higher fee than the DfT wants to pay, does the DfT go to the market to find someone else?
They will have little choice but to keep rolling it over on terms no worse for Arriva than currently contracted. Both parties know that if they don't, the only realistic outcome is moving to OLR, which will cost the Department slightly more in set-up costs.

Arriva could try to refuse any extension without substantially improved terms but this seems unlikely given the current setup is low risk for them.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Is Reading - Newcastle a new one or a restoration of a previous service? I can’t recall ever seeing one.
Before COVID 1tph, Reading, Oxford, Banbury, Leamington, New Street, Derby, Sheffield, Doncaster, York, Darlington, maybe Durham, Newcastle (with various extensions at either end to Guildford/Southampton/Edinburgh at various times)
Newcastle - Reading is a partial restoration of the occasional Newcastle - Banbury services to what they were prior to Covid. Prior to Covid they were 1tph Newcastle - Reading, extending alternate hours to Southampton Central, with a daily Southampton - Edinburgh and Newcastle - Guildford also running, the latter both supplementing the otherwise exclusively TPE service at Chester-le-Street as well as retaining route knowledge via Havant for the ECS working to Eastleigh.
 

gazzaa2

Member
Joined
2 May 2018
Messages
837
I won't be using them until they sort out their rolling stock and put more carriages on.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,213
Location
Wilmslow
I guess Paignton and Newquay services will be permanently expunged and the new platform 2 extension at Exeter St. David's will not be needed for XC. A 'limited service to and from Penzance' is, however, mentioned.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,263
Location
West Wiltshire
This is only a Prior Information Notice. It doesn't specify the fleet. However, as you have noted, Value for Money is the key aspect.

Value for money doesn’t automatically mean going back to roughly the timetables of 4 years ago.

It could be cuts, but could be expansion with full length trains running hourly with ticket sales to put bums on seats.

If extra revenue gained exceeds the cost of extra services then theoretically a value for money award should be producing highest net income less costs.

Of course there are limiting factors, staff availability, and suitable rolling stock, and train paths but if highest value for money was a half hourly service and thousands of tickets filling all seats on every sector of each train journey, then as specified that would be the preferred bid. This is roughly what LNER are doing and they are effectively DfT
 

eusd

Member
Joined
12 May 2015
Messages
23
Does anyone know why it refers to a direct award rather than a National Rail Contract, like all other TOCs?
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,538
Location
Yorkshire
If anyone would wish to discuss potential rolling stock provision, please use the following thread:

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,263
Location
West Wiltshire
Does anyone know why it refers to a direct award rather than a National Rail Contract, like all other TOCs?

The DfT has a guide, appears the mix of franchise and direct awards is so they can manage a properly resourced programme of competition
The Rail Franchising Programme includes selecting, through Franchise Competitions, delivery partners who will support the Department’s vision and secure the most cost effective and value for money operation of rail services from providers who will continuously seek to improve services for passengers.
The programme also includes a number of direct awards to incumbent rail operators. The direct awards help to manage and sustain a realistic and properly resourced programme of Franchise Competitions and a healthy bidding market for those competitions. In entering into such direct awards, the Department is conscious that the commercial terms have not been tested through a procurement competition

 

ABB125

Established Member
Joined
23 Jul 2016
Messages
4,354
Location
University of Birmingham
Is it just me, or are the Birmingham to Nottingham stoppers not listed? Everything else (pretty much!) that ran in 2019 is there, including Birmingham Leicester "local services", which is surely what the Nottingham stoppers are?
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,486
I guess Paignton and Newquay services will be permanently expunged and the new platform 2 extension at Exeter St. David's will not be needed for XC. A 'limited service to and from Penzance' is, however, mentioned.

Newquay is already no longer an XC route.
 

43172

Member
Joined
7 Oct 2020
Messages
161
Location
South west England
I guess Paignton and Newquay services will be permanently expunged and the new platform 2 extension at Exeter St. David's will not be needed for XC. A 'limited service to and from Penzance' is, however, mentioned.

It does feel like that way, i not surprised about Newquay given XC only served it during the summer months, and i don't think they've served it since the summer of 2019. Paington i'm not sure, maybe it might hold on given it has a year round service, but since covid has mostly had shuttle to Bristol. Seems like it, but it might get the odd use for engineering works or winter weather. I wonder if the "limited service to and from Penzance" is going to keep the current one morning northbound service or maybe restore the other two that used to start at Penzance pre March 2020 (current start from Bristol).
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,138
Location
Derby
I fully expect Reading to Newcastle via Doncaster to be just one journey per day, retained simply for route knowledge.
 
Joined
8 Jul 2014
Messages
400
It does feel like that way, i not surprised about Newquay given XC only served it during the summer months, and i don't think they've served it since the summer of 2019. Paington i'm not sure, maybe it might hold on given it has a year round service, but since covid has mostly had shuttle to Bristol. Seems like it, but it might get the odd use for engineering works or winter weather. I wonder if the "limited service to and from Penzance" is going to keep the current one morning northbound service or maybe restore the other two that used to start at Penzance pre March 2020 (current start from Bristol).
Word around the depot is that one additional service to/from Penzance from May timetable, but don’t take that as gospel.
 
Status
Not open for further replies.

Top