Lots of platitudes about light rail in here, but the six words at the start of the article stand out as far as I can see..."If capital costs can be reduced".
If you read a bit more their aim is for all future new systems to be of the same standard, which is how capital costs will be reduced. For instance, Manchester is non-standard because it uses rail level platforms not tram level platforms, while Blackpool is non-standard because it's 550V opposed to 750V, while DLR is non standard because it used 3rd rail. This obviously means each system needs it's own specific type of vehicles so a large order for multiple different systems can't be placed.
If you read a bit more their aim is for all future new systems to be of the same standard, which is how capital costs will be reduced. For instance, Manchester is non-standard because it uses rail level platforms not tram level platforms, while Blackpool is non-standard because it's 550V opposed to 750V, while DLR is non standard because it used 3rd rail. This obviously means each system needs it's own specific type of vehicles so a large order for multiple different systems can't be placed.
TfGM, with the current and soon to be expanded system, would definately argue the case that theirs would be the standard to be adopted, from an entrenched position.
Currently there would be no real option for running a tram-train service between Sheffield and Manchester if it was to involve street running in both cities. (With the cross Pennine route tram-train would be unlikely anyway.) On the other hand tram-train between Sheffield and Nottingham could look like a workable idea.
NET has been beset with problems.
Manchester's system seems to be the most succesful British tram system I can think of however whereas NET has been beset with problems.
Manchester is locked in to having train height platforms now, and Nottingham is locked into having low floor trams, there isn't really much that can be done about it.
Manchester's system seems to be the most successful British tram system I can think of however whereas NET has been beset with problems.
Croydon - Wimbledon?(NET) is also the only one that contains converted train lines which still had heavy rail services on them up until conversion.
Croydon - Wimbledon?
I was referring to Manchester Metrolink being converted train lines not NET, so I don't know why you've tried to make it sound like I was claiming NET was converted train lines.
Well I read it the same as "John @ home", just didn't get around to posting it in time.
And, come to think about it, the section of NET out to Hucknall is a converted train line - just one that still has trains running on it !