DfT and Network Rail to look at Sheffield area electrification

Status
Not open for further replies.

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Sounds like a rehash of the December announcement, which also included such lines as ECML to Middlesbrough, Warrington-Chester, Crewe-Chester, Selby-Hull.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I didn't realise Sheffield-Leeds was included on that.
Well, it's just the few miles to Moorthorpe, as the rest is already wired as part of Doncaster-Leeds. But that bit was one of the eight routes in the study announced in December.
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
I agree. I think this is just a local reporter rehashing (and exaggerating) the old story of Network Rail looking into various schemes. There has been no new statement in the last day or so from anyone. The story was barely worth printing.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
I agree. I think this is just a local reporter rehashing (and exaggerating) the old story of Network Rail looking into various schemes. There has been no new statement in the last day or so from anyone. The story was barely worth printing.

Sheffield-Manchester (ie Dore-Hazel Grove) would be new.
Not been mentioned before.
It just needs Trafford Park-Allerton adding and Bob's your uncle for TP South.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,471
Location
Back in Sussex
When we were doing Project Rio we were told that the gaps without a phone signal couldn't be sorted because the required masts were banned due to the gap being in the National Park area and that the scenery couldn't be ruined by nasty old masts, even if they were disguised, in true Baldrick form, as trees, but someone is planning on putting overheads up all the way through the Park area !!!!!!!!!!, one rule for one and all that methinks
 

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,387
Location
Wennington Crossovers
There are already wires through the Lake District and other National Parks and even without them, you can still see the track and the brightly coloured trains from above the Hope Valley! It'll get done eventually.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
There are already wires through the Lake District and other National Parks and even without them, you can still see the track and the brightly coloured trains from above the Hope Valley! It'll get done eventually.

The WCML wires don't actually cross the Lake District National Park boundary (though they come within a few hundred yards near Shap).
The boundary doesn't actually cross the old A6, and the railway is further to the east except for one short stretch.
However, if Windermere is wired it will penetrate the National Park.

The Woodhead wires did cross the Peak District boundary east of Hadfield up to the tunnel entrance through Longdendale.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
When we were doing Project Rio we were told that the gaps without a phone signal couldn't be sorted because the required masts were banned due to the gap being in the National Park area and that the scenery couldn't be ruined by nasty old masts, even if they were disguised, in true Baldrick form, as trees, but someone is planning on putting overheads up all the way through the Park area !!!!!!!!!!, one rule for one and all that methinks

I'm pretty certain electrification works, while within the NR boundary, generally fall within permitted development rights - whatever the local authority think!
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
Though in that case, weren't the wires there before the National Park was?!

Looks like the Woodhead electrification project was started in 1935, with much of the OHL equipment in place on the western side by the time work stopped for WW2.
The national park was declared in 1951, before the new Woodhead tunnel was opened and electrically worked in 1954.
It was certainly a different era in terms of local government planning policy and opposition campaigns.
http://en.wikipedia.org/wiki/Manchester–Sheffield–Wath_electric_railway

PS I don't know the current state, but the LMR left the steelwork on the route west of Woodhead, and it still blights the line in east Manchester, especially around Guide Bridge.
The ER dismantled the steelwork on its side of Woodhead, at least through Sheffield.
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,373
Location
Yorkshire
...
PS I don't know the current state, but the LMR left the steelwork on the route west of Woodhead, and it still blights the line in east Manchester, especially around Guide Bridge.
The ER dismantled the steelwork on its side of Woodhead, at least through Sheffield.

I'd argue that area has bigger aesthetic problems than a few oversized OHL stanchions, to be fair... :lol:
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,279
I'm pretty certain electrification works, while within the NR boundary, generally fall within permitted development rights - whatever the local authority think!

Actually, it's usually because the Acts of Parliament authorising the construction of railways in the first place give Network Rail the power, as the legal successor to the companies which got the consents in the 19th century, to do pretty much whatever they like within their boundaries.

Network Rail will attach copies of the relevant Act to any prior consent applications made to councils, which effectively say, here's what we plan to do but we are going to be nice and ask for your comments, not that you can really stop us anyway...
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It's presumably also because those who drafted subsequent laws about planning permission could have limited these historic powers but chose not to.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
Sheffield to Manchester was one of the 8 routes in the December announcement.
https://www.gov.uk/government/news/road-and-rail-projects-to-boost-local-and-regional-transport--2

Rail this week (p10) reports that the Task Force mentioned in the announcement, set up to review the priorities for the next round of electrification in the north, has not even met yet.
Problems finding suitable people and drafting its remit, apparently.
Very frustrating for those wanting more wires more quickly.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Wasn't it supposed to report within a year, i.e. December?

With the summer holidays coming it might not meet until the autumn!
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,046
Wasn't it supposed to report within a year, i.e. December?

With the summer holidays coming it might not meet until the autumn!

Well all they need to do is start a thread on here which asks something like:

Given the review of the priorities for the next round of electrification in the north where would you look at and why?

Then sit back and wait for a week or two for the arguments to die down a bit and then use that as a starting point for the discussions. Meet a few times to work out what font you're going to use and expand on the results of the thread, including getting approximate costs (based on £x per mile plus £y per junction) and the sorts of services which could then become run by EMU's. Write the report, meet a few more times to iron out any issues in writing the report and any updates from the thread, and then publish.
 
Joined
24 Jun 2014
Messages
442
Location
Derby
PS I don't know the current state, but the LMR left the steelwork on the route west of Woodhead, and it still blights the line in east Manchester, especially around Guide Bridge.
The ER dismantled the steelwork on its side of Woodhead, at least through Sheffield.

Woodhead electrification masts were "carefully" removed for further use; at the time of their removal, the plan was to use them to electrify Crewe - Kidsgrove on the cheap
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There are still some gantries between Guide Bridge and Stalybridge. It will be interesting to see whether they get re-used in situ.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,947
Location
Mold, Clwyd
There are still some gantries between Guide Bridge and Stalybridge. It will be interesting to see whether they get re-used in situ.

At Edge Hill, where there is a de-wired stretch before Wavertree station, they seem to be putting up new wires on new gantries, completely ignoring the old gantries nearby.
 

34D

Established Member
Joined
9 Feb 2011
Messages
6,048
Location
Yorkshire
It's presumably also because those who drafted subsequent laws about planning permission could have limited these historic powers but chose not to.
So how wide ranging are these powers? Could they include extending a line/reinstating an old line?
 