Network rail are saying three miles and two weeks to repair
 

CJK64

Member
Joined
1 Jul 2019
Messages
103
Network rail are saying three miles and two weeks to repair

Yep a total renewal which will take 2 weeks minimum.. Manpwer is not the issue but the main concerns are around the haulage required to undertake these works.
Many engineering trains will be required which is a logistical nightmare.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,552
Location
Somewhere
1500 sleepers and 6000 tonnes of ballast was the last estimate I heard.
 

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
And don't forget bridges and signalling equipment , which has been told to us too.
 

CJK64

Member
Joined
1 Jul 2019
Messages
103
And don't forget bridges and signalling equipment , which has been told to us too.

A few wheel timbers were heavily damaged ( especially Stracey Road ) along with S&C units. .. There is a lot of work but the full extent will be known tomorrow after a full scope.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,990
Does anyone know why the remedial work is so extensive? was the track in bad condition before the derailment? do derailments usually cause this much damage?
 