Maybe the wheels at the front weakened or dislodged the track, and the rear wheels bore the consequences?The question is, how did the wheels of the derailed bogie come to climb over the rail on plain line and the rest of the train didn't.
Maybe the wheels at the front weakened or dislodged the track, and the rear wheels bore the consequences?The question is, how did the wheels of the derailed bogie come to climb over the rail on plain line and the rest of the train didn't.
Travel advice for the lines to Southend Victoria and Southminster following the Wickford train derailment
Sunday 16 August 2026
Rail passengers planning to travel through Wickford next week are being advised by Network Rail and Greater Anglia to expect disruption to train services for at least a week and to only travel on this route if their journey is essential.
Following the derailment of one carriage of a Greater Anglia train and extensive damageto one and a half miles of infrastructure on Friday 14 August near Wickford, the railway will remain closed between Billericay and Hockley (on the route between Shenfield and Southend Victoria) to allow for emergency repairs. As a result, limited rail shuttle services will run between Shenfield and Billericay and between Hockley and Southend, with a limited replacement bus service between Billericay and Hockley.
The train service is planned to operate as follows until further notice:
Southend Victoria – Hockley: rail shuttle every 30 minutes, departing XX:05 and XX:35 from both locations
Shenfield – Billericay: rail shuttle every 30 minutes, departing XX:15 and XX:45 from both locations
There will be no train services between Wickford and Southminster, but a limited bus replacement service is planned.
These services will be extremely limited in capacity and will not be able to match the capacity of the normal train timetable, so customers are advised to check before they travel, re-plan journeys where possible and to allow extra time due to this ongoing disruption.
Journey planning apps and websites are currently being updated to reflect these changes.
Customers are advised to use c2c services on the route between Southend Central and London Fenchurch Street wherever possible, with Greater Anglia tickets accepted for travel on c2c services.
Jamie Burles, Managing Director for GBR Anglia - which comprises c2c, Greater Anglia and Network Rail Anglia – said, “Our response teams are working around the clock and doing everything they can to safely restore the line and resume normal train services as soon as possible. “In the meantime, we know this disruption will impact our customers’ journeys on the lines to Southend Victoria and Southminster and we are grateful for our customers’ patience as we carry out this emergency work. We are very sorry for the inconvenience
we know this disruption to services will cause. As repair work progresses, further updates on any changes to services and the impact on journeys will be provided when they are available.”
Background information on the works needed to repair the railway and restore normal services
The timescales for the re-opening of the line and restoration of the normal timetable reflect the extensive works required to repair the rail infrastructure, with major damage over a long section of the railway east of Wickford. Key tasks include the replacement or repair of 1½ mile of track and the supporting ballast and sleepers, overhead line support stanchions, repairs to signalling equipment, checks (and if necessary repairs) to other railway structures along the section of track involved and the necessary testing/commissioning of all the infrastructure before the normal services can be fully restored
They'll be hoping to have the repairs done by next weekend. What would be good is if the other work could take place while the line is closed, but I guess access would be required by engineering trains, so not possible.The Southminster line was due to shut for renewals from Saturday 22nd until Friday 28th. Wonder if that will still take place or whether resources will be redeployed to the section needing repair between Wickford and Rayleigh?
Access could be possible as there isn't any damage to points/track necessary to access Southminster, it's just the overheads that are isolated. They plan to move the derailed unit to Southminster with skates during the engineering works week, so it seems that renewal works will still be done.They'll be hoping to have the repairs done by next weekend. What would be good is if the other work could take place while the line is closed, but I guess access would be required by engineering trains, so not possible.
Interesting.. seems a long way to take the damaged vehicle but I guess moving it as part of the planned possession ahead of the renewal trains and using the sidings at Southminster is an option which doesn’t cause disruption anywhere else.Access could be possible as there isn't any damage to points/track necessary to access Southminster, it's just the overheads that are isolated. They plan to move the derailed unit to Southminster with skates during the engineering works week, so it seems that renewal works will still be done.
CCTV footage captures moment Wickford train derailed
CCTV footage from a nearby resident’s garden captured the moment the train came off the tracks, sending clouds of dust into the air.
www.instagram.com
I may be missing something, but I can't see a video on that page.![]()
WATCH as footage shows moment south Essex train derailed
Video footage has captured the moment a train derailed in Wickford, with clouds of dust coming off the tracks.www.echo-news.co.uk
The train looks to have been travelling quite quickly, from this video.
It takes a little while to load, for me it appeared under the "At this stage, it is unlikely that the route will be reopened over the weekend and disruption may continue into next week. paragraph.I may be missing something, but I can't see a video on that page.
There's an embedded video about half way down the news page. You can just about make out something happening from all the dust. It certainly won't win an Oscar for qualityI may be missing something, but I can't see a video on that page.
I've also tried and failed to match the premises to Google Maps.There's an embedded video about half way down the news page. You can just about make out something happening from all the dust. It certainly won't win an Oscar for quality
I'm not so sure - residential building along the line suggests it could be right.The one mile plus of damaged track suggests this wasn’t the ‘moment Wickford Train Derailed’.
There is one, but you need to wade through about 9 ads covering most of the page to see it.I may be missing something, but I can't see a video on that page.
I suppose one could say that a moment isn’t the same as the instant that something begins. Moments, such as the moment while something is happening, can last for a little while.The one mile plus of damaged track suggests this wasn’t the ‘moment Wickford Train Derailed’.
Long welded rail train accoridng to those on Anglia Gen.
Seems that 6L37 is diverting to Wickford.
Running as 6Z37Seems that 6L37 is diverting to Wickford.
Wheel skates for the derailed parts, unsure what pulled the units.Does anyone know how the derailed and stranded units were moved from the site.
I expect we’ll see a series of blanket 50mph ESRs imposed on sections of track identified as being at risk (in a similar fashion to the 20mph ESRs imposed after Hatfield/gauge corner cracking & probably just as extreme in volume).
Educated guess here, based on similar events previously, but drivers will have suddenly started reporting lots more rough rides, with good intentions. This will have overwhelmed response teams ability to fix (if a fix is needed, about half ofrough ride reports are or track within genometry tolerance) so speeds will be going on as a result.
A 30mph one at that. There's also a 20mph one between Ingatestone and Shenfield too.Not blanket ESRs, but there is already a fairly lengthy one added between Gidea Park and Shenfield.
Struggling is a bit extreme, it's max 10 min delays at the moment which isn't too bad in the grand scheme of things. Of course this is without as many Southend Victoria trains running.It’s a very well educated - and correct - guess. Anglia is struggling with this already seemingly.
Struggling is a bit extreme, it's max 10 min delays at the moment which isn't too bad in the grand scheme of things. Of course this is without as many Southend Victoria trains running.
But 10 mins delay on one journey leads to a delayed start for the return journey, and more delays on the return etc etc., it's max 10 min delays at the moment which isn't too bad in the grand scheme of things.
Also my thinking about the Lewes derailment.Maybe the wheels at the front weakened or dislodged the track, and the rear wheels bore the consequences?