• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Derailment at Wickford - Friday 14th August 2026

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,078
The question is, how did the wheels of the derailed bogie come to climb over the rail on plain line and the rest of the train didn't.
Maybe the wheels at the front weakened or dislodged the track, and the rear wheels bore the consequences?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Track defects can occur while a train is passing over. So if that is the cause it could have happened under the last carriage.
 
Joined
21 Feb 2009
Messages
41
Greater Anglia now reporting line maybe shut for a week due to damage to a mile and half of track.

Travel advice for the lines to Southend Victoria and Southminster following the Wickford train derailment
Sunday 16 August 2026
Rail passengers planning to travel through Wickford next week are being advised by Network Rail and Greater Anglia to expect disruption to train services for at least a week and to only travel on this route if their journey is essential.
Following the derailment of one carriage of a Greater Anglia train and extensive damageto one and a half miles of infrastructure on Friday 14 August near Wickford, the railway will remain closed between Billericay and Hockley (on the route between Shenfield and Southend Victoria) to allow for emergency repairs. As a result, limited rail shuttle services will run between Shenfield and Billericay and between Hockley and Southend, with a limited replacement bus service between Billericay and Hockley.
The train service is planned to operate as follows until further notice:
Southend Victoria – Hockley: rail shuttle every 30 minutes, departing XX:05 and XX:35 from both locations
Shenfield – Billericay: rail shuttle every 30 minutes, departing XX:15 and XX:45 from both locations
There will be no train services between Wickford and Southminster, but a limited bus replacement service is planned.
These services will be extremely limited in capacity and will not be able to match the capacity of the normal train timetable, so customers are advised to check before they travel, re-plan journeys where possible and to allow extra time due to this ongoing disruption. 
Journey planning apps and websites are currently being updated to reflect these changes.
Customers are advised to use c2c services on the route between Southend Central and London Fenchurch Street wherever possible, with Greater Anglia tickets accepted for travel on c2c services.
Jamie Burles, Managing Director for GBR Anglia - which comprises c2c, Greater Anglia and Network Rail Anglia – said, “Our response teams are working around the clock and doing everything they can to safely restore the line and resume normal train services as soon as possible. “In the meantime, we know this disruption will impact our customers’ journeys on the lines to Southend Victoria and Southminster and we are grateful for our customers’ patience as we carry out this emergency work. We are very sorry for the inconvenience
we know this disruption to services will cause. As repair work progresses, further updates on any changes to services and the impact on journeys will be provided when they are available.”
Background information on the works needed to repair the railway and restore normal services
The timescales for the re-opening of the line and restoration of the normal timetable reflect the extensive works required to repair the rail infrastructure, with major damage over a long section of the railway east of Wickford. Key tasks include the replacement or repair of 1½ mile of track and the supporting ballast and sleepers, overhead line support stanchions, repairs to signalling equipment, checks (and if necessary repairs) to other railway structures along the section of track involved and the necessary testing/commissioning of all the infrastructure before the normal services can be fully restored


 
Last edited:

dannyh73

Member
Joined
28 Sep 2015
Messages
19
The Southminster line was due to shut for renewals from Saturday 22nd until Friday 28th. Wonder if that will still take place or whether resources will be redeployed to the section needing repair between Wickford and Rayleigh?
 

MikeWh

Established Member
Associate Staff
Senior Fares Advisor
Joined
15 Jun 2010
Messages
8,532
Location
Crayford
The Southminster line was due to shut for renewals from Saturday 22nd until Friday 28th. Wonder if that will still take place or whether resources will be redeployed to the section needing repair between Wickford and Rayleigh?
They'll be hoping to have the repairs done by next weekend. What would be good is if the other work could take place while the line is closed, but I guess access would be required by engineering trains, so not possible.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
They'll be hoping to have the repairs done by next weekend. What would be good is if the other work could take place while the line is closed, but I guess access would be required by engineering trains, so not possible.
Access could be possible as there isn't any damage to points/track necessary to access Southminster, it's just the overheads that are isolated. They plan to move the derailed unit to Southminster with skates during the engineering works week, so it seems that renewal works will still be done.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
They may be able to arrange for a deveg team to visit during unexpected access, but anything requiring specific pieces of plant, cranes, highly specialised operators, freight locos and drivers and so forth is probably not available at two days notice. The rail freight industry tends to have its very limited pool of drivers on "commercial" freight work on working days and Network Rail work around weekends and holidays, except for the few intermodal and other things that do run on weekends.
 
Last edited:

dannyh73

Member
Joined
28 Sep 2015
Messages
19
Access could be possible as there isn't any damage to points/track necessary to access Southminster, it's just the overheads that are isolated. They plan to move the derailed unit to Southminster with skates during the engineering works week, so it seems that renewal works will still be done.
Interesting.. seems a long way to take the damaged vehicle but I guess moving it as part of the planned possession ahead of the renewal trains and using the sidings at Southminster is an option which doesn’t cause disruption anywhere else.
 

RUK

Member
Joined
5 Aug 2009
Messages
400
Location
East of England

CCTV footage captures moment Wickford train derailed​


CCTV footage from a nearby resident’s garden captured the moment the train came off the tracks, sending clouds of dust into the air.

The train looks to have been travelling quite quickly, from this video from the Basildon-Canvey-Southend Evening Echo. The time-stamp on the video says 14:15, which was 18 minutes before the first post of this thread.

There’s another video from a passenger on the train who has evacuated here, walking on the other track past the derailed carriage, showing the side of it which didn’t hit the column for the overhead line electrification equipment:

 
Last edited:

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
The one mile plus of damaged track suggests this wasn’t the ‘moment Wickford Train Derailed’.
 
Joined
8 Jun 2026
Messages
130
Location
Somerset
Misleading headline aside, it does show the train travelling at a reasonable speed whilst derailed.
I may be missing something, but I can't see a video on that page.
It takes a little while to load, for me it appeared under the "At this stage, it is unlikely that the route will be reopened over the weekend and disruption may continue into next week. paragraph.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
I may be missing something, but I can't see a video on that page.
There's an embedded video about half way down the news page. You can just about make out something happening from all the dust. It certainly won't win an Oscar for quality
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,362
There's an embedded video about half way down the news page. You can just about make out something happening from all the dust. It certainly won't win an Oscar for quality
I've also tried and failed to match the premises to Google Maps.
The one mile plus of damaged track suggests this wasn’t the ‘moment Wickford Train Derailed’.
I'm not so sure - residential building along the line suggests it could be right.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
After trying several browsers and turning off ad-blockers I finally managed to get the video to appear. I'm reminded why I avoid local news sites wherever possible.
 

RUK

Member
Joined
5 Aug 2009
Messages
400
Location
East of England
The one mile plus of damaged track suggests this wasn’t the ‘moment Wickford Train Derailed’.
I suppose one could say that a moment isn’t the same as the instant that something begins. Moments, such as the moment while something is happening, can last for a little while.
 

Tomo

Member
Joined
22 May 2021
Messages
34
Location
Tonbridge
A lot of the tamping that should have happened over the last few weeks was cancelled due to the hot weather
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,430
Location
Sheffield

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
I expect we’ll see a series of blanket 50mph ESRs imposed on sections of track identified as being at risk (in a similar fashion to the 20mph ESRs imposed after Hatfield/gauge corner cracking & probably just as extreme in volume).

Not blanket ESRs, but there is already a fairly lengthy one added between Gidea Park and Shenfield.

== Doublepost prevention - post automatically merged: ==

Educated guess here, based on similar events previously, but drivers will have suddenly started reporting lots more rough rides, with good intentions. This will have overwhelmed response teams ability to fix (if a fix is needed, about half ofrough ride reports are or track within genometry tolerance) so speeds will be going on as a result.

It’s a very well educated - and correct - guess. Anglia is struggling with this already seemingly.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,672
Location
UK
Not blanket ESRs, but there is already a fairly lengthy one added between Gidea Park and Shenfield.
A 30mph one at that. There's also a 20mph one between Ingatestone and Shenfield too.

== Doublepost prevention - post automatically merged: ==

It’s a very well educated - and correct - guess. Anglia is struggling with this already seemingly.
Struggling is a bit extreme, it's max 10 min delays at the moment which isn't too bad in the grand scheme of things. Of course this is without as many Southend Victoria trains running.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,941
Location
London
Struggling is a bit extreme, it's max 10 min delays at the moment which isn't too bad in the grand scheme of things. Of course this is without as many Southend Victoria trains running.

I meant more getting resources to site for rectification. Very thin on the ground as are other routes across SE England.
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
6,078
, it's max 10 min delays at the moment which isn't too bad in the grand scheme of things.
But 10 mins delay on one journey leads to a delayed start for the return journey, and more delays on the return etc etc.
 

Top