Deepgreen said:
Oh, that's alright, then. It must be more than adequate compensation for missing a job interview, a flight, etc., to know that one can at least reclaim the portion of fare that is applicable!
That problem exists with other modes of transport. If you have a flight to catch or a job interview to go to, you should have contingency time in case of delay. If that means turning up an hour earlier then so be it, because that employer or airline will not care about why you're late.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
That problem exists with other modes of transport. If you have a flight to catch or a job interview to go to, you should have contingency time in case of delay. If that means turning up an hour earlier then so be it, because that employer or airline will not care about why you're late.

Indeed. Or take out an insurance policy against the likely consequential loss.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,443
Location
Isle of Man
Of course we could claim delay repay. But by not cooperating effectively the railway industry has cost itself in having to pay out compensation

The problem is the two different compensation schemes- the internal one (oodles of cash for all the fat cats) and the external one (whistle for it).

If SWT hold a train they get clobbered for the internal delay compensation, but if they don't then it is GWR who have to dole out the (much smaller) compensation payments to passengers. Of course SWT aren't going to hold the train.

Meanwhile, the TSSA thinks that the TOCs make the thick end of £200m a year profit from delays.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,392
Oh, that's alright, then. It must be more than adequate compensation for missing a job interview, a flight, etc., to know that one can at least reclaim the portion of fare that is applicable!

I'm all in favour of comsumer rights but in such a situation I am afraid I would say start earlier!

If a train is held for you to make your connection how can you guarantee that I will still make my later connection? If you can't who decides which is the most important? Certainly you and I will have different views!
 
Last edited:

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,885
They've always said that they won't hold the last train of the day up the Matlock branch if a EMT service from London is delayed. Whilst this is frustrating the thing is even after 22.00 the MML is still busy between Derby and Ambergate Junction and so I imagine its difficult to find room for a delayed service in between all the other services.

Generally speaking they will hold the last Matlock for a short while if there's demand for it.

By request trains at Newark Northgate tend to be held for late running London trains if possible as well.

The key of course is getting these hold requests out. The station staff at Grantham used to get on trains to try and hold Skegness line services - they don't seem to do this any more after a few got taken for a trip to Sleaford.

If it really is that close I ignore directions not to wait from control on safety grounds as it is patently not safe to dispatch my train if people are running over a bridge and flinging themselves at it while it's starting to move.
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
Now I'm happy to get my money back, but I'd much rather arrive at my destination on time and have my money invested in the service rather than have it used to pay off disgruntled passengers who've suffered avoidable delays.

As would the people already on that train that you want held - so they arrive late too. Or do they not come into this because its all about you?
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
There is a simple way of getting around the problem of missing connecting trains which the rail industry could implement.

All they need to do is stop every train at all major interchange station for at least 10 minutes, in doing so the risk of missing a connection reduces dramatically as the risk of the train being late is cut significantly. Therefore, the likelihood is that nearly everyone will make their connection.

The only small problem is that it could lengthen journey times and would require many more platforms than there are currently, but I'm sure that is a small price for the vast majority to pay so that the very few who currently miss their connections no longer do (well mostly).
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,576
I'm all in favour of comsumer rights but in such a situation I am afraid I would say start earlier!

Of course that logic falls over totally in places that aren't that well served so starting earlier isn't really possible.
 

TheNewNo2

Member
Joined
31 Mar 2015
Messages
1,008
Location
Canary Wharf
It happens to my wife all the time at Newport when changing from a FGW train from Reading to a ATW Wales to Leominster.
At least she gets to wave to the ATW train as it goes past whilst she sits in the delayed FGW stationary outside Newport.

Yup, had that happen to me six weeks ago. I made the best of it, but was annoying.



There is a simple way of getting around the problem of missing connecting trains which the rail industry could implement.

All they need to do is stop every train at all major interchange station for at least 10 minutes, in doing so the risk of missing a connection reduces dramatically as the risk of the train being late is cut significantly. Therefore, the likelihood is that nearly everyone will make their connection.

The only small problem is that it could lengthen journey times and would require many more platforms than there are currently, but I'm sure that is a small price for the vast majority to pay so that the very few who currently miss their connections no longer do (well mostly).

Platform capacity....
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
Norther don't operate Delay Repay at all, and just compensate in line with the NRCoC.

Ah... So that's why my 1039 to Mirfield instead ran fast to Brighouse, as Batley has a Huddersfield train within half an hour whereas Walsden only has the via Dewsbury service - it got there 30 late, but no compensation for them!

Of course being 30 down it'll still have been too late for its next working though!
 
Last edited:

crehld

Established Member
Joined
1 Nov 2014
Messages
1,994
Location
Norfolk
As would the people already on that train that you want held - so they arrive late too. Or do they not come into this because its all about you?

No need to get tetchy! :roll:

Of course it's not all about me. There were several passengers affected by the fact who ended up incurring a delay of over one hour as a result.

Anyway, had you bothered to read my earlier post (which you obviously haven't - not for the first time) you would have seen I had pointed out that the train in question arrived two minutes early into its next stop (as was the case for that train every day that week and the week previous), so there's clearly scope for a 2 minute hold in this particular case - no one else would have been delayed.

When I said I expect to arrive at my destination on time I was speaking in much broader terms (I had thought this was clear but evidently not - maybe it would help if you substituted the word "I'd" with "passengers would"). Rather than setting up unrealistic connections which fall through with the slightest delay, is there scope for TOCs to work together when planning their timetables to make sure enough padding in put in place? Or to make sure there is scope in place to hold trains for a couple of minutes if necessary? An analysis of ticket sales on the 0541 Skipton to Lancaster will show that most people boarding that train require a connection onto the 0658, so have Virgin and Northern worked together by jointly analysing that data and jointly developing a real combined service to offer those customers? Or do Virgin simply not care about their customers coming from non Virgin stations, despite those customers still paying Virgin for the service?

Unfortunately the only real conclusion I am able to draw from last week's (admittedly very minor) incident is that despite the fantastic efforts of the guard to make arrangements to minimise the impact of our delay, the system fell down because TOCs do not co-operate with each other, are unable to consider the wider picture, and only care about their own services rather than thinking about providing something integrated. Rather than hold the train for two minutes Virgin decided not to. As a result Northern will now how to compensate several passengers (a bill that will no doubt cross the £1,000 mark) and Virgin have earned my dissatisfaction (which is something they apparently care about).

More broadly, incidents like this put people off using rail travel, which can only be bad for the industry as a whole. I accept there are pathing constraints and you don't want to inconvenience customers on other trains. However most reasonable people understand delays happen. Indeed, I think had a minor 2 minute delay (which would have been made up) incurred as a result of holding the train, the overwhelming majority would be understanding had the situation been clearly communicated and explained, and if anything Virgin would be lauded for going out of their way to provide a good service. I'm sure developing an integrated approach is possible with co-operation and adequate planning, but perhaps there is some truth to the speculation that the way our railways have been privatized means TOCs are only interested in their own service, and not the service provided by the industry as a whole.
--- old post above --- --- new post below ---
The problem is the two different compensation schemes- the internal one (oodles of cash for all the fat cats) and the external one (whistle for it).

If SWT hold a train they get clobbered for the internal delay compensation, but if they don't then it is GWR who have to dole out the (much smaller) compensation payments to passengers. Of course SWT aren't going to hold the train.

Meanwhile, the TSSA thinks that the TOCs make the thick end of £200m a year profit from delays.

Which is the root of the problem. The system is not set up to encourage inter-TOC co-operation on these matters.
--- old post above --- --- new post below ---
I'm all in favour of comsumer rights but in such a situation I am afraid I would say start earlier!

Can you suggest a departure before the 0556 from Hellifield to Lancaster (or any other of the intermediate stations along that route) which would permit me to catch the 0658, leaving enough time to account for unexpected delays en route?

If a train is held for you to make your connection how can you guarantee that I will still make my later connection? If you can't who decides which is the most important? Certainly you and I will have different views!

This comes back to having a sensible policy and TOCs co-operating with each other to work out these issues.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,885
Incidentally there's no such thing as a 2 minute hold. If the train left two minutes before you then by the time you take into account transfer times, slower moving passengers wishing to change (if it's held for you, why shouldn't it be held for the 85 year old lady struggling with her case), dispatch times and the possibility of other trains having to wait or being dispatched ahead causing other delays.

Having dealt with many of these over the years even cross platform is more like the held train leaving 5 minutes plus later than it should have done which being more than headway time is quite enough to cause issues.
 

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
No need to get tetchy! :roll:

Of course it's not all about me. There were several passengers affected by the fact who ended up incurring a delay of over one hour as a result.

Anyway, had you bothered to read my earlier post (which you obviously haven't - not for the first time) you would have seen I had pointed out that the train in question arrived two minutes early into its next stop (as was the case for that train every day that week and the week previous), so there's clearly scope for a 2 minute hold in this particular case - no one else would have been delayed.
.

I did read your subsequent post(as I always do thanks) and just because it ran early doesn't mean anything. The bigger consequences - as you should know - are not solely down to one train on one line - as others have consistently said.

If we are going to hold trains for 2 minutes then we may as well recast the whole timetable.
 

embers25

Established Member
Joined
16 Jul 2009
Messages
2,158
I see the GWR Portsmouth-Cardiff is scheduled into Salisbury just 3 minutes before the SWT Waterloo-Exeter, on a section from Laverstock Junction which probably has a 3 minute headway. A sensible (?) bit of scheduling for the two hourly services through Salisbury, but I digress. I presume if the Portsmouth is more than a minute or so down it is held to avoid SWT sticking it on GWR financially for the delay. SWT have a 5 minute stop at Salisbury, so if the GWR train waits to follow it in, and passengers need to use the subway to connect, that sets everything up for SWT setting off exactly as everyone emerges onto the platform, just like the opening scene in "Monsieur Hulot's Holiday".

https://vimeo.com/19873779

(01.35 onwards)

The funny thing is that the Exeter must not be delayed by a second, but the incoming Portsmouth has no such operating qualms about having been delayed along the way by any manner of issues, generally of the railway's own making. Quite why there is this constant issue at connecting points, that the incoming can readily be delayed by 1,001 issues along the line, but the onward connection must not be delayed by a moment, is not apparent.

To be fair to SWT and the signallers common sense often prevails at Salisbury. The Exeter train is usually a couple of mins early and is held at the signal before the junction to let the Pompey-Bristol through. When the Bristol is less than 5 late the Exeter is usually held outside. At 5 late the Exeter is let in first BUT providing the Bristol is seen pulling onto the platform before the Exeter is due off they will hold it and also they will have staff both sides of the subway to hurry people through. If connections are missed they also often insert special stop orders on the next train for Feniton/Whimple/Pinhoe if the next train misses them and there were connecting passengers. That being said they don't always do any of this and some staff smile very broadly as people run up the subway and they blow the train off so there are no guarantees but it is better than most places!!

Personally I'd like to see the Pompey to Bristol trains held for longer at Salisbury to allow connections between them and the Exeter trains for both sets of passengers as Waterloo to Warminster line passengers always have to either get the slow or wait an hour (or always have to wait an hour on sundays) in Salisbury. If this was Europe it would be cross platform connections both ways.
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,956
Location
York
More broadly, incidents like this put people off using rail travel, which can only be bad for the industry as a whole.

Though that doesn't seem to be something the industry cares very much about these days. Also, people no longer seem to heed the old adage that when things go smoothly people just accept it and don't say anythning to friends and relatives but when something goes wrong they tell everyone all around about their lousy experience. There are still businesses that seem to like to head off bad publicity by handling complaints swiftly and well, but the rail industry rarely seems to come into that category.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
Platform capacity....

I know, I did say that it would require many more platforms than at present.

Not that would be too much of a problem, just add a bit (say 50%) to everyone's ticket price to cover it and all the extra units that would be required to have trains stopping for 10 minutes at a time at major interchange stations.

I'm sure that the vast majority of people for the vast majority of their journeys would have no problem with that so that for a few people for whom there is a slim likelihood of missing a train was made almost non existent.
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
To be fair to SWT and the signallers common sense often prevails at Salisbury. The Exeter train is usually a couple of mins early and is held at the signal before the junction to let the Pompey-Bristol through. When the Bristol is less than 5 late the Exeter is usually held outside. At 5 late the Exeter is let in first BUT providing the Bristol is seen pulling onto the platform before the Exeter is due off they will hold it and also they will have staff both sides of the subway to hurry people through. If connections are missed they also often insert special stop orders on the next train for Feniton/Whimple/Pinhoe if the next train misses them and there were connecting passengers. That being said they don't always do any of this and some staff smile very broadly as people run up the subway and they blow the train off so there are no guarantees but it is better than most places!!

Personally I'd like to see the Pompey to Bristol trains held for longer at Salisbury to allow connections between them and the Exeter trains for both sets of passengers as Waterloo to Warminster line passengers always have to either get the slow or wait an hour (or always have to wait an hour on sundays) in Salisbury. If this was Europe it would be cross platform connections both ways.

Some fair points here and. I amended my opening post

Yes there are times they hold it if they are coming in much the same time or put the gwr infront

Problem also is lack of reception can make it hard to get through to people between romsey and salisbury to ask for a train to be held
 

snail

Established Member
Joined
16 Jun 2011
Messages
1,910
Location
t'North
That train only required holding for 2 mins. Because it was not what was initially a minor 8 minute delay for several passengers turned into a delay of over one hour.
I've just been looking at the timings on realtime trains. Your train arrived in Lancaster at 0700 1/4. Allowing time for the doors to be opened you wouldn't be off the train until 0701 at least. Allow another 30 seconds for you to get across to P4 and the London train is now 4 minutes late. But that doesn't allow for the VT train doors to be closed or for slower moving passengers to make the connection, so lets call it an 0704 departure[1]. That makes it late into Preston and missed connections down the line (including my unofficial 3 minute connection to a Liverpool service at Wigan - which I missed on Friday because the same VT train was a minute late). So I know the pain of missed connections but asking for a train to be held so you can catch it will affect other people.

[1] I'm not sure of the exact timings at Lancaster but I think VT have a policy of closing doors 40 seconds before departure outside of major stations.
 
Last edited:

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
I see the GWR Portsmouth-Cardiff is scheduled into Salisbury just 3 minutes before the SWT Waterloo-Exeter, on a section from Laverstock Junction which probably has a 3 minute headway. A sensible (?) bit of scheduling for the two hourly services through Salisbury, but I digress. I presume if the Portsmouth is more than a minute or so down it is held to avoid SWT sticking it on GWR financially for the delay. SWT have a 5 minute stop at Salisbury, so if the GWR train waits to follow it in, and passengers need to use the subway to connect, that sets everything up for SWT setting off exactly as everyone emerges onto the platform, just like the opening scene in "Monsieur Hulot's Holiday".

Ah, but that's Tati and this is just tatty.;)
 
Status
Not open for further replies.

Top