The 777s were hardly rushed, they are just terribly biult and have reduculus issues at every turn, seemingly the same with every other stadler train in this country.
The 777s suffered from changes to the design and as Stadler offer that capability there is always the risk the changes encounter problems not affecting the standard design.
The GA ones admittedly seem to have settled down but the TFW variants are very late and only a few a day seem to run. The Glasgow subway sets were ridiculous late & uncomfortable, the 555s are still yet do do anything. That can't all be the fault of the opperators
The problem in South Wales with the Stadler 756s is the lack of completed overhead electrification to use them on !.
The South Wales 231s are working just fine but not on the routes they were intended for - the 231 are instead covering routes where electrification is not yet completed.
The Greater Anglia 745s and 755s are doing OK. Biggest problem is that there were not enough 745s ordered !.
Generally the risk with small bespoke fleets is always there whatever the manufacturer.
The real disaster is the utter mess the Bombardier Aventras are in - large fleets coupled wit some late alterations in the case of the 701s.
It is no good comparing modern products to new fleets from twenty or more years ago. These days things are arguably over complicated.
So Stadler 93s are a modern bespoke design. I am glad the supplier and customer (ROG) appear to be realistic about testing and tweaking. The Stadler 93s are not a mass produced product like a car. I expect they are waiting to see what the 93s strong points are and then see what freight market the operator ROG can use them on. That market has changed. The 93s might suffer from the existence of the also new class 99.