New figures released by ORR today
Covers 1st April - 25 July 2026 (4 rail periods of 4 weeks)
Figure 1.1 has claims by Operator, with Avanti top at 724,352 claims, Merseyrail were best with just 731 claims
Figure 2.1 shows most operators had 99.9-100% processed in time, but Scotrail was pathetically slow 75.7% within target time
Figure 3.1 has approval rates by Operator, 100% for Caledonian sleeper, but a whopping 57% not approved on Elizabeth line
Looks like the (part) nationalised railway, is worse than when more was private
Covers 1st April - 25 July 2026 (4 rail periods of 4 weeks)
15 October 2026
In rail periods 1 to 4 there were 3.8 million delay compensation claims closed by train operators, up 55% on the number in the same rail periods in the previous year.
In the latest rail periods, the number of trains cancelled (either in full or in part) increased by a third. The number of stations stops arrived at more than 15 minutes late increased by 39%.
Figure 1.1 has claims by Operator, with Avanti top at 724,352 claims, Merseyrail were best with just 731 claims
Figure 2.1 shows most operators had 99.9-100% processed in time, but Scotrail was pathetically slow 75.7% within target time
Figure 3.1 has approval rates by Operator, 100% for Caledonian sleeper, but a whopping 57% not approved on Elizabeth line
Looks like the (part) nationalised railway, is worse than when more was private