• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Delay Repay Claim - Multiple Operators and Delays

Status
Not open for further replies.

Tyrannosaurs

New Member
Joined
24 Jun 2025
Messages
1
Location
West of Scotland
Hi All,

Looking for some guidance.

My wife and daughter were travelling from Dunlop in the west of Scotland to London Euston. This involved travelling from Dunlop to Glasgow Central (Scotrail) and Glasgow Central to London Euston (Avanti West Coast).

The Dunlop to Glasgow train left on time but was delayed by about 20 minutes due to problems outside Glasgow Central, BUT due to those delays the Glasgow to London train left late and they made the connection (which they wouldn't have done had it left on time).

That train was then cancelled at Preston due to a different problem, meaning they had to divert via Newcastle eventually arriving in London over two hours late.

Both Scotrail and Avanti West Coast are claiming it's not their claim to deal with.

The first delay was with Scotrail but it didn't turn out to be material, though only because the Avanti train was late leaving. Who should I be pushing? And is there any formal process/definition/documentation I can/should be citing?

Thanks in advance.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,143
I'd say it's Avanti who should be paying out because the connection was made at Glasgow Central - you need to clearly state this to Avanti. This is probably one where you need to speak to Avanti as it'll require some manual intervention.
 
Status
Not open for further replies.

Top