• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Delay claim difficulty with Transport for Wales

Status
Not open for further replies.

BRM

Member
Joined
16 Jan 2015
Messages
65
For a journey at 1702 Abergavenny to Frome on Friday 31/3/23 the tfw planner suggested 1702-2001. The delay claim site gives a journey 1702-2049 with a 1h23min wait at Bristol Parkway. I was delayed as the 1702 arrived in Newport 20 minutes or so late, missing the 1741 connection to Westbury 1904. I arrived into Westbury at 2003 and was picked up there rather than wait 40 minutes for the Frome service.
According to the delay site I was not delayed as it only gives the journey with a long wait in Bristol Parkway.
How can this be?
 

Attachments

  • Screenshot_20230421-215647.png
    Screenshot_20230421-215647.png
    97.9 KB · Views: 33
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,460
Location
Yorkshire
Did you book online with an itinerary?

If so, forward the email, with a covering note, to customer relations.
 

StarCrossing

Member
Joined
27 Jul 2015
Messages
229
Yes, I came across this recently - journeys that are actually delayed seem to get removed from the system so you can't select them. I wouldn't dare to suggest this is done deliberately to make it hard for people to claim...

At the bottom of the screen where it gives you suggested itineraries, there should be a "Still can't find your train? Add manually" button. You'll need to use this.
 

BRM

Member
Joined
16 Jan 2015
Messages
65
I agree that something amiss is happening. I did add my actual journey but as the delay claim itinerary was longer I arrived at the time their journey said I would.
 

StripeyNick

Member
Joined
25 Apr 2012
Messages
412
Location
Cowbridge, S.Wales
I have found their delay repay system a real pain after doing my first claim. It's taken over 3 weeks to get any response.
I found the daft thing that they wanted screenshots of the mobile tickets but when I tried to do that, the app wouldn't allow it!
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,549
Location
LBK
For a journey at 1702 Abergavenny to Frome on Friday 31/3/23 the tfw planner suggested 1702-2001. The delay claim site gives a journey 1702-2049 with a 1h23min wait at Bristol Parkway. I was delayed as the 1702 arrived in Newport 20 minutes or so late, missing the 1741 connection to Westbury 1904. I arrived into Westbury at 2003 and was picked up there rather than wait 40 minutes for the Frome service.
According to the delay site I was not delayed as it only gives the journey with a long wait in Bristol Parkway.
How can this be?
You can't claim for delay repay anyway. As you abandoned your journey rather than completing it you must claim a refund or partial refund from the retailer. I strongly urge you not to proceed with a delay repay claim, which may land you in trouble.
 

BRM

Member
Joined
16 Jan 2015
Messages
65
I only bought a Frome ticket as the price was the same as to Westbury, giving me the option of ending or starting my return at either. At the moment I think tfw are best avoided.
 

MrJeeves

Established Member
Associate Staff
Senior Fares Advisor
Joined
28 Aug 2015
Messages
4,712
Location
Burgess Hill
You can't claim for delay repay anyway. As you abandoned your journey rather than completing it you must claim a refund or partial refund from the retailer. I strongly urge you not to proceed with a delay repay claim, which may land you in trouble.
Did they abandon their journey, or stop short of the destination on their ticket? I would argue this is a grey area, in my view.

I have, many times, ended my journey short of the destination on my ticket and still claimed delay repay, and never encountered issues.

I don't see an issue with OP claiming from Abergavenny to Westbury from TfW, as they were delayed by 59(?) mins into Westbury.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,997
Did they abandon their journey, or stop short of the destination on their ticket? I would argue this is a grey area, in my view.

I would argue that if the ticket allows break of journey (and thus also permits ending short) and the claim is based on the arrival time at the station the journey ended at it is entirely black and white.
The journey is valid. It was delayed at the end point of the journey and delay repay is based on journeys not tickets. I don't see how someone could argue that it doesn't count because there was a change of plans due to the railway's inability to run to timetable and therefore it's a fraudulent claim.

If TfW set the fare then maybe break of journey isn't allowed though, in which case it does become a different story.
 

fandroid

Established Member
Joined
9 Nov 2014
Messages
2,567
Location
Hampshire
The National Rail Enquiries app still shows that 1702-2001 itinerary as valid for Friday this week
 
Status
Not open for further replies.

Top