Just noting that 1M19 Glasgow to Euston has been stuck behind a slower Liverpool Lime Street to Euston service tonight. Looks like NR signallers are to blame as the Glasgow was on time as far as Stafford but the Liverpool was not routed out of the way on the up slow from Stafford. The Glasgow is now 15 min down snd won't recover. Who get's the blame? Is it operational error on the part of NR? Was there anything Avanti could have done to avoid this?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

splitfare

Member
Joined
6 Jul 2009
Messages
32
I'm not experienced but looking at RealTimeTrains, I think the culprit is 6Q61 which left Crewe 10 minutes early using the Slow Up (through Platform 4 at Stafford) "forcing" 1A82 from Liverpool onto the Fast Up and consequently stopping at Stafford using Platform 1 (scheduled for platform 4) - consequently 1A82 left Stafford on time but on the Up Fast Could still be NR signallers fault at Crewe though!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
Just noting that 1M19 Glasgow to Euston has been stuck behind a slower Liverpool Lime Street to Euston service tonight. Looks like NR signallers are to blame as the Glasgow was on time as far as Stafford but the Liverpool was not routed out of the way on the up slow from Stafford. The Glasgow is now 15 min down snd won't recover. Who get's the blame? Is it operational error on the part of NR? Was there anything Avanti could have done to avoid this?
Y coded against following on time 1A82 (the Liverpool)
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
Y coded against following on time 1A82 (the Liverpool)
What is a Y code?
There seemed plenty of opportunities to route the ex-Liverpool down the Trent Valley slow before its Nuneaton stop to allow 1M19 to pass and remain on time. Seems a strange bit of regulation that. Doesn't seem to be the way to run a right time railway at least.

In fact the Glasgow was due to pass the Liverpool at its Stafford stop around the same time, and should have had priority as it was within a minute of its booked slot. But the Liverpool was given priority where it could have been held in the platform until the Glasgow had passed. It's ooerational deczions like this that annoy passengers especially as a late arrival at close to midnight starts to affect onward travel with tubes closing down etc.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
What is a Y code?
There seemed plenty of opportunities to route the ex-Liverpool down the Trent Valley slow before its Nuneaton stop to allow 1M19 to pass and remain on time. Seems a strange bit of regulation that. Doesn't seem to be the way to run a right time railway at least.

In fact the Glasgow was due to pass the Liverpool at its Stafford stop around the same time, and should have had priority as it was within a minute of its booked slot. But the Liverpool was given priority where it could have been held in the platform until the Glasgow had passed. It's ooerational deczions like this that annoy passengers especially as a late arrival at close to midnight starts to affect onward travel with tubes closing down etc.
Y coding is for regulation against on time trains etc..

Delay Attribution Codes​

CodeCauseAbbreviation
AAWaiting acceptance into off Network Rail network Terminal or YardACCEPTANCE
ACWaiting train preparation or completion of TOPS list/RT3973TRAIN PREP
ADOff Network Rail network Terminal or Yard staff shortage including reactionary congestion caused by the shortageWTG STAFF
AECongestion in off Network Rail network Terminal or YardCONGESTION
AGWagon load incident including adjusting loads or open doorLOAD INCDT
AHCustomer or off Network Rail network yard equipment breakdown/reduced capacityYARD EQUIP
AJWaiting Customer's traffic including release information and documentationTRAF DOC
AKSafety incidents and mishaps (e.g. derailments, fire or chemical spill) in off Network Rail network freight yard or terminal (including private sidings, and stations – where it affects FOC services)YARDSAFETY
AXFailure of off network infrastructure (FOC or private)OFFNET INF
AZOther Freight Operating Company cause, to be specified, in off Network Rail network terminals or yardsYARD OTHER
DANon Technical Fleet Holding CodeHOLD NT FL
DBTrain Operations Holding CodeHOLD T-OPS
DCTrain Crew Causes Holding CodeHOLD T-CRW
DDTechnical Fleet Holding CodeHOLD T FL
DEStation Causes Holding CodeHOLD STN
DFExternal Causes Holding CodeHOLD EXT
DGFreight Terminal and or Yard Holding CodeHOLD YARD
DHAdhesion and or Autumn Holding CodeHOLD AUTM
FADangerous goods incidentDANG GOODS
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSDFOC DRIVER
FETrain crew not available including after restNO T-CREW
FFFOC Diagramming or Rostering issueFOC DIAG
FGDriver adhering to company professional driving standards or policyPRO DRIVER
FHFOC Planning issue (not diagramming or rostering)FOC PLAN
FIDelay due to incorrect ETCS system or equipment operation by DriverETCS DVR
FJFOC Control decision or directiveFOC CONTRL
FKTrain diverted or re-routed at FOC requestDIVERT REQ
FLTrain cancelled at FOC request or planned not to runCANCEL REQ
FMTail lamp or head lamp out or incorrectly shownLAMP ISSUE
FOTime lost en-route believed to be Operator cause and information required from Operator (Ops Responsibility)LIR UNEX
FSDelay due to ETCS/ ERTMS on-board overriding driver commandETCS O-RDE
FWLate start or yard overtime not explained by Train OperatorLATE START
FXFreight train running at lower class or speed than planned classification or overweightTRAIN SPEC
FZOther FOC causes incl. cause to be specified, including mishaps.FOC OTHER
IASignal failure (including no fault found)SIGNAL FLR
IBPoints failure (including no fault found)POINTS FLR
ICTrack circuit failure (including no fault found)TC FAILURE
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadlesLEVEL XING
IESignalling functional power supply failureSIG FUNC PWR
IFTrain Describer/Panel/ARS/SSI/TDM/Remote Control failurePANEL FLR
IGBlock failureBLOCK FLR
IHPower supply and distribution system failurePWR SUP DIS
IISignalling lineside cable faultSIG CABLE
IJAWS/ATP/TPWS/Train Stop/On-track equipment failureAWS/ATP
IKTelecom equipment failure (including no fault found)TELECOMS
ILToken equipment failure (including no fault found)TOKEN FLR
IMInfrastructure Balise Failure (TASS / ETCS / ERTMS)BALISE FLR
INHABD/Panchex/WILD/Wheelchex fault, failure or mis-detectionHABD FAULT
IPPoints failure caused by snow or frost where heaters are fitted but found to be not turned on, not operative or defectivePOINT HEAT
IQTrackside sign blown down, fallen over, missing, defective, mis-placedTRACK SIGN
IRBroken/cracked/twisted/buckled/flawed railRAIL FLAW
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.TRACK FLT
ITRough ride or bumps reported - cause not known or no fault foundTRACK NFF
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)EARTHSLIP
IWNon severe weather - snow/ice/frost affecting infrastructure equipmentINF WEATHR
I0Telecom equipment legacy radio failure (RETB)RETB FLR
I1Overhead line/3rd rail defectOHL/3 RAIL
I2AC/DC trip (including no fault or cause found)AC/DC TRIP
I4OHLE/3rd rail power supply failure or reductionSUPPLY FLR
I5Possession over-run from planned workOVERRUN
I6Delays as a result of line blocks / track patrols (including late handback)LINE BLOCK
I7Engineer's train late into, from or failed in possessionENGNRS TRN
I8Animal Strike or Incursion within the control of Network RailANIMAL
I9Fires starting on Network Rail InfrastructureINFRA FIRE
JATSR speed restrictions for track work outside of the Timetable Planning RulesTSRNOT EAS
JBReactionary Delay to ‘P’ coded TSRTSR REACTN
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)STRUCTURES
JFOff track asset defects or issues on the Network Rail network including fencing, gates, walkways, lighting (not due to vandalism or weather or where the asset is part of the station infrastructure)OFFTRK ASS
JGESR/TSR due to works not completed or cancelled possession (where restriction did not exist prior to possession)ESR/TSR
JHCritical Rail Temperature speeds, (other than buckled rails)HEAT SPEED
JKFlooding not due to exceptional weatherFLOODING
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)SAFETY INF
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards, including where signals areobscured and a train strikes branches.VEGETATION
JRDelay due to RBC issues affecting ETCS / ATO operation (not balise related)RBC ETCS
JSCondition of Track TSR outside the Timetable Planning RulesTRACK COND
JTPoints failure caused by snow or frost where heaters are not fitted.NO PNT HTR
JXMiscellaneous items on the track or railhead including litter, excluding leaves, demonstrated vandalism, weather or items fallen/thrown from trainsMISC OBJCT
J0Telecom equipment radio failure (GSM-R)GSM-R FLR
J2Network Rail train dispatch equipment failure (including no fault found but excluding telecoms equipment)TRTS FLR
J3Axle Counter FailureAXLE C FLR
J4Infrastructure Safety Issue Reported by Member of the Public – No Fault FoundMOP NFF
J5Infrastructure Asset Fault Reported but Proven to be mistakenMIS REPORT
J6Lightning strike against unprotected assetsLIGHTNING
J7ETCS/ ERTMS Equipment Failure (excluding communications link and balises)ETCS FLR
J8Damage to infrastructure caused by on-track machine whilst operating in a possessionOTM DAMAGE
J9Preventative Maintenance to the infrastructure in response to a Remote Condition Monitoring AlertRCM ALERT
MBElectric loco failure, defect, attention.ELEC LOCO
MCDiesel loco failure, defect, attention.DIESL LOCO
MDOther technical failures below the solebarBELOW SBAR
MESteam locomotive failure/defect/attentionSTEAM LOCO
MLWagons, coaches and parcel vehicle faultsWAGN/COACH
MNBrake and brake systemsfaults; including wheel flats where no other cause had been identifiedBRAKE/WHLS
MPRail/ wheel interface, adhesion problems (including ice on the running rail)ADHESION
MRSanders and scrubber faultsSANDER
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swapsALOC STOCK
MTConfirmed train borne safety system faults (not cab based)SYST FAULT
MUDepot operating problemDEPOT OPS
MVEngineer’s on-track equipment failure outside possessionON-TRACK
MWWeather - effect on T&RS equipmentWEATHR FLT
MYCoupler and Coupler system faultsCOUPLER
M1Confirmed Pantograph ADD, shoe beam or associated system faults Incl. positive PANCHEX activationsPANTO/SHOE
M2Delay due to ATO / ETCS equipmentETCS
M7Door and Door system faultsDOORS
M8Other technical failures above the SolebarABOVE SBAR
M9Reported fleet equipment defect - no fault foundFLEET NFF
M0Confirmed train cab based safety system fault (including GSM-R)CAB SAFETY
NAOn-train TASS/TILT failureTASS/TILT
OARegulation decision made with best endeavoursENDVR REG
OBDelayed by signaller not applying applicable regulating policyREGULATION
OCSignaller including mis-routing (not ERTM /ETCS related)SIGNALLER
ODDelays due to national, regional or route operations directives, or route control decisions or directiveNR CONTROL
OEFailure to lay Sandite or operate Railhead Conditioning train as programmedRHC PROG
OFDelay due to incorrect ETCS system or equipment operation by Signaller / ControllerETCS CTRL
OGIce on conductor rail/OHLEICING
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)ARS / TMS
OJFire in station building or on platform, affecting operators not booked to call at that stationSTN FIRE
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)OPTG STAFF
OLSignal Box not open during booked hoursBOX CLOSED
OMTechnical failure associated with a Railhead Conditioning trainRHC FAIL
ONDelays not properly investigated by Network RailMIS-INVEST
OQIncorrect SimplifierSIMPLIFIER
ORLOM Directive or signaller correctly applying local box instructionsBOX INSTR
OSLate start or delays to Railhead Conditioning (RHC) or Ghost Train due to its own activity and not in reaction to another incident.RHC LATE
OTOperational Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)SIGHT TSR
OUDelays not investigated by Network RailNOT INVEST
OVFire or evacuation due to fire alarm of Network Rail buildings other than stations not due to vandalismNR FIRE
OWConnections held where the Prime Incident causing delay to the incoming train is a FOC responsibility incident and the next departing service is scheduled to depart less than 60 minutes later than the train being held.FOC CONECT
OZOther Network Rail Operating causesOPTG OTHER
PAPublished TSR associated with Planned Engineering Works where time loss is within Engineering AllowancePLANND ENG
PBPublished TSR due to condition of asset (not associated with Engineering Work) where time loss is within Engineering AllowancePLANND CON
PDSystem generated cancellation (NOT to be attributed to manually)SYSTM CANC
PFPlanned engineering work where a published diversion/SLW is not provided for in the schedule but where time loss is within Engineering AllowanceDIVRSN SLW
PGPlanned cancellation where that cancellation isidentified and agreed prior to 22.00 the day before the schedule runsPLAND CAPE
PJCancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay (NOT berth off set related)DUPLICATE
PLExclusion commercially agreed and documented between Network Rail and Train OperatorAGREED EXC
PNVSTP service delays of under 5 minutes caused by regulation and or time lost in running (VSTP Schedule delay ONLY where that delay causes no reactionary delay)VSTP DELAY
PTAuthorised TRUST reporting anomalies or inaccuraciesrelating to berth off setsTRUST ANOM
QAWTT Schedule and or LTP process including incorrect simplifiers (where produced by Capacity Planning).WTT SCHED
QBPlanned engineering work- diversion/SLW not timetabled (outside the Timetable Planning Rules.)DIVRSN/SLW
QHAdhesion problems due to leaf contaminationRAILCONTAM
QICautioning due to railhead leaf contaminationCAUTCONTAM
QJSpecial working for leaf-fall track circuit operationLEAVES T/C
QMTrain Schedule VAR/STP process including incorrect simplifiers (where produced by Capacity Planning).STP SCHED
QNVSTP schedule / VSTP process (TSI created schedule)VSTP SCHED
QPReactionary Delay to “P” coded PossessionPLND REACT
QTDelay accepted by Network Rail as part of a commercial agreement where no substantive delay reason is identifiedCOMMERCIAL
RBPassengers joining/alightingPASSENGERS
RCPre-booked assistance for a person with reduced mobility joining/alightingBKD ASSIST
RDAttaching/detaching/Shunter/wateringATT/DETACH
RELift/escalator defect/failureLIFT/ESC
RHStation evacuated due to fire alarmFIRE ALARM
RIWaiting connections - not authorised by TOC ControlUNAUTH CON
RJSpecial Stop Orders - not authorised by TOC ControlUNAUTH SSO
RKWaiting passenger connections authorised by TOC but out with TOC/Network Rail connection policyAUTH CON
RLSpecial Stop Orders authorised by TOC Control (including any delay at point of issue)AUTH SSO
RMWaiting connections from other transport modesXTNL CONN
ROPassengers taken ill on platformPASS ILL
RPPassenger dropped object whilst boarding/alighting from train and train delayed at TOC requestPASS DROP
RQUn-booked assistance for a person with reduced mobility joining/alightingUBKD ASST
RRLoading or unloading reserved bicyclesBIKE RSVD
RSLoading or unloading unreserved bicyclesBIKE URSVD
RTLoading excessive luggageEXCES LUGG
RULocating lost luggageLOST LUGG
RVCustomer Information System failurePASS INFO
RWStation flooding (including issues with drains) not the result of weather, where the water has not emanated from Network Rail maintained infrastructure/networkSTN FLOOD
RXStation delays as a result of overcrowding due to unplanned events or incidents (e.g result of line or station closure) where causal event is not determined.UNPL EVENT
RYMishap - Station operating causesSTN MISHAP
RZOther Station operating causesSTN OTHER
R1Incorrect train dispatch by station staffDISPATCH
R2Late TRTS given by station staffLATE TRTS
R3Station staff unavailable - missing or uncoveredSTAFF MSNG
R4Station staff split responsibility - unable to cover all dutiesSTAFF DUTY
R5Station staff error - e.g. wrong announcements, misdirectionSTAFF ERR
R7Station delays as a result of overcrowding due to planned events(e.g.sports fixtures, concerts)PLND EVENT
R8Delay at Station believed to be Operator cause and information required from Operator (Station Responsibility)STN UNEX
TATrain-crew/loco/stock/unit diagram issuesDIAG ISSUE
TBTrain cancelled or delayed at Train Operator’s requestTOC REQEST
TFSeat reservation problemsSEAT RESVN
TGDriverTOC DRIVER
TH(Senior) Conductor/Train ManagerT-MGR/COND
TITrain-crew rostering problemROSTERING
TJTail lamp or headlamp missing, not lit or wrongly displayedLAMP ISSUE
TKTrain catering staff (including Contractors)CATERING
TMConnection authorised by TOC but out with connection policyAUTH CONN
TNLate presentation from the continentLATE CHUNL
TOTime lost en-route believed to be Operator cause and information required from Operator (Ops Responsibility)LIR UNEX
TPSpecial Stop OrdersAUTH SSO
TRTrain Operating Company DirectiveTOC DIRECT
TSDelay due to incorrect ETCS system or equipment operation by DriverETCS DVR
TTAutumn-attribution Neutral Zone delays (See Supplementary Autumn Attribution Guidance)LF NEUTRAL
TWDriver adhering to company professional driving standards or policyPRO DRIVER
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)OTH NETWK
TYMishap-Train Operating Company causeTOC MISHAP
TZOther Passenger Train Operating Company causesTOC OTHER
T2Delay at unstaffed station to non-DOO trainNONDOO STN
T3Waiting connections from other transport modesXTNL CONN
T4Loading Supplies (including catering)SUPPLIES
T8Delay at Station believed to be Operator cause and information required from Operator ( Ops Responsibility)STN UNEX
VADisorder, drunks or trespassDISORDER
VBVandalism and or theftVANDALISM
VCFatalities and or injuries sustained whilst on a platform as the result of being struck by a train or falling from a trainFATALITIES
VDPassenger taken ill on trainILL PASS
VETicket irregularities or refusals to payTICKET IRR
VFFire caused by vandalismVANDL FIRE
VGPolice searching trainPOLICE-TRN
VHPassenger Communication cord, door egress or emergency train alarm operatedPASS COMM
VISecurity alert affecting stations and depotsSEC ALERT
VRDriver adhering to company professional driving standards or policies during severe weather conditions that are not fleet relatedPRO DRIVER
VWSevere weather affecting passenger fleet equipment including following company standards/policies or Rule Book instructionsSEV WEATHR
VXExternal events occurring on the LUL or other non NR running linesLUL CAUSES
VZOther passenger or external causes the responsibility of TOCEXT OTHER
V8Train striking or being struck by a birdBIRDSTRIKE
XATrespass (Including non-intentional)TRESPASS
XBVandalism or theft (including the placing of objects on the line)VANDALS
XCFatalities or injuries caused by being hit by train (Including non-intentional)FATALITIES
XDLevel Crossing Incidents including misuse and emergency services being prioritised over rail services.XING INCDT
XFPolice searching the linePOLICE-RLY
XHSevere heat affecting infrastructure the responsibility of Network Rail (excluding Heat related speed restrictions)SEV HEAT
XISecurity alert affecting the Network Rail Network (including line blocks taken for emergency services attending an off Network Rail network incident)SEC ALERT
XKNational Grid power failure - local area is also affected (includes ourages, surges and blips where a standby generator or UPS is installed and working)EXTL POWER
XLFire external to but directly affecting the Network Rail network (including line blocks taken for emergency services attending an incident not directly affecting the Network Rail network)EXTL FIRES
XMExternal utility incident including gas, water mains and overhead power linesGAS/WATER
XNRoad or crossing related incidents including cars on the line, crossing misuse and priority given to emergency services over trains (excluding bridge strikes)ROAD INCDT
XOExternal trees, building or structures encroaching or falling onto Network Rail network infrastructure (not due to weather or vandalism) also including aircraft and airport safety or operational related incidents.EXT OBJECT
XPBridge StrikeBRIDGE HIT
XQSwing bridge open for river or canal trafficBRIDGE OPN
XRCable vandalism or theftCABLE VAND
XTSevere snow or ice affecting infrastructure which is the responsibility of Network Rail (including implementation of Key Route Strategy)SEV SNOW
XUSunlight on signal or dispatch equipment where all reasonable mitigation has been takenSUN OBSCUR
XVFire or evacuation due to fire alarm of Network Rail buildings due to vandalism (not including stations)VANDL FIRE
XWHigh winds affecting infrastructure the responsibility of Network Rail including objects on the line due to the effect of weatherHIGH WIND
X1Visibility in semaphore signalled areas, orspecial working for fog and falling snow implemented by Network Rail – in all signalling areas (including special working for level crossing visibility)SPL WRKING
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructureSEV FLOOD
X3Lightning Strike – damage to protected systems.LIGHTNING
X4Blanket speed restriction or Key Route Strategy implemented in accordance with Group Standards or other national operational safety instructionKRS / BLKT
X8Animal Strike or incursion not within the control of Network RailEXT ANIMAL
X9Points failure caused by severe snow or ice where heaters are fitted and working as designedPNTS SNOW
YALost path - regulated for train running less lateREG-ONTIME
YBLost path - regulated for another later running trainREG-LATE
YCLost path - following train running less lateFOL-ONTIME
YDLost path - following another later running trainFOL-LATE
YEWaiting path onto/from single lineWTG S/LINE
YGRegulated in accordance with Regulation PolicyREG INSTRC
YILate arrival of booked inward stock (inward and outward trains are operated under the same Track Access Contract)INWD STOCK
YJLate arrival of booked inward train-crew (where the inward and outward trains worked by that train-crew are operated under the same Track Access Contract)INWD CREW
YLWaiting passenger connections within connections policy, contingency plan or otherwise agreed by NR/TOCAUTHSD CON
YMSpecial stop orders within the contingency plan or agreed by NR/TOCAUTHSD SSO
YNService Recovery- booked train crew, not availableFIND CREW
YOWaiting platform/station congestion/platform alterationPLATFORM
YPDelays due to diversions from booked route or lineDIVERSION
YQPassenger overcrowding caused by a train being of short-formationSHRT FRMD
YRTactical cancellation for service recovery not caused by late runningSR CNCL
YUService Recovery- booked rolling stock, not availableUNIT SWAPS
YTReactionary delay to a train that is not leaving the network, by a train that is leaving the networkNON NR INF
YVTactical hold of a train at origin or at a strategic location en-route due to a line blocking incident on the train's booked routeHELD BACK
YXPassenger overcrowding caused by delay or cancellation of another train or its own late runningOVER CRWD
ZSNo cause ascertainable for a Sub Threshold Delay causing Threshold Reactionary (where agreed by both Parties)NOCAUSE AS
ZUNo Cause Identified After Full Investigation by Both Parties (A ‘Full Investigation’ will be one including all avenues of investigation agreed as reasonable by both Parties)NOCAUSE ID
ZWUninvestigated Cancellations System Roll-Ups onlySYS CANC
ZXUninvestigated Late Start System Roll-Ups onlySYS L-STRT
ZYUninvestigated Station Overtime System Roll-Up onlySYS OTIME
ZZUninvestigated Loss in Running System Roll-Up onlySYS LIR
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,293
Location
Yorkshire
If the railway applied common sense, the ex-Liverpool would have been held a little longer at Stafford; it would have still been easily on time or early into Euston. The Glasgow would have avoided a delay.

But common sense rarely applies in this country.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,537
Location
Neilston, East Renfrewshire
Reactionary delay for an 80 TSR on the Up Fast at Doxey for a wet bed.

Thanks.

If the railway applied common sense, the ex-Liverpool would have been held a little longer at Stafford;

It can be difficult, not to say unfair, to criticise regulating decisions without knowing every single factor affecting the railway and train running at the time.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
Whilst stuff like this is frustrating (and I’ve been on the wrong end of several examples), there is usually a good reason.

In this case it is most likely to be that the ARS (Automatic Route Setting) routed the trains in booked order. There is then a discussion to be had about why the signaller did not take the train(s) out of ARS and manage them proactively, but there could (And will be) any number of reasons for that.

alternatively, it could be the case that Avanti specifically requested the trains be kept in booked order.

It would be pretty unusual for a delay like this to be put down to the signaller, unless he/she had been instructed to change the booked order of service and he/she didn’t do so.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,293
Location
Yorkshire
I am not criticising any individual (signallers may be overworked or overruled), but the outcome / system.
It can be difficult, not to say unfair, to criticise regulating decisions without knowing every single factor affecting the railway and train running at the time.
If you have any evidence to suggest the ex-Liverpool train should have been given the road ahead of the ex-Glasgow, I'm all ears.
 

Boodiggy

Member
Joined
8 Nov 2012
Messages
642
Reactionary delay for an 80 TSR on the Up Fast at Doxey for a wet bed.
SPATE today

== Doublepost prevention - post automatically merged: ==

I am not criticising any individual (signallers may be overworked or overruled), but the outcome / system.

If you have any evidence to suggest the ex-Liverpool train should have been given the road ahead of the ex-Glasgow, I'm all ears.

The difference of a 110mph vs a 125mph unit for a short distance would not have a noticeable impact. Only 25 miles between Crewe & Stafford. If they were both Pendos then that time of night there would be plenty of make up time. I think it was via Northampton too the last few days (but haven’t checked).
Could be ARS too.
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
SPATE today

== Doublepost prevention - post automatically merged: ==



The difference of a 110mph vs a 125mph unit for a short distance would not have a noticeable impact. Only 25 miles between Crewe & Stafford. If they were both Pendos then that time of night there would be plenty of make up time. I think it was via Northampton too the last few days (but haven’t checked).
Could be ARS too.
Not sure what SPATE means.
But both were Avanti Pendolino's - the ex-Liverpool running to slightly slower Class 810 timings with stops at Crewe, Stafford and Nuneaton. The ex- Glasgow stopped at Warrington BQ and was not due to stop until Rugby. It was about a minute late through Crewe, while the ex-Liverpool arrived Stafford mega early because it is a 125mph unit and was probably routed UFL rather than SL from Crewe and should have stopped in Stafford P4. It ended up in P1. It was not due to depart Stafford until 21:55, while the Glasgow was due through at 21:54 1/2. BUT - because the ex-Liverpool route was set out onto the FL, the Glasgow ended up being signal checked into Stafford awaiting its departure ahead of it. i would assume any ARS would have set the through line first for the ex- Glasgow unless it was seriously late and would have required a signaller to intervene and reset the route to let the Liverpool out in Front? But maybe the intervention into rerouting it into P1 messed the ARS up. Is the overlap for P1 so short that it would have required route setting back onto the USF to allow the set into the platform?

it seems a crazy decision. I cannot understand how an 80mph TSR justified this. And the services booked for P4 ahead of the Liverpool appear to have arrived and departed on time ok. The ex-Liverpool still ended up early at all its stops - quel surprise - while the Glasgow ended up 15 late - due to one unexplained regulating decision between Crewe and Stafford. Would not have happened in BR days. The 'express' would have gone through. Not sure AVANTI control would have been pleased with this either as it added cumulative delay minutes to the Glasgow at a time when it is struggling to improve its standing in the industry as well as regain passenger confidence.
 
Last edited:

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,537
Location
Neilston, East Renfrewshire
If you have any evidence to suggest the ex-Liverpool train should have been given the road ahead of the ex-Glasgow, I'm all ears.

Not working in the responsible Signalling Centre, Network Rail or TOC Control I do not know why the regulating was as it was, however if you do and can explain further I am all ears also!


Would not have happened in BR days.

Poor regulating did not happen in BR days? Not quite how I recall things.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Y coded against following on time 1A82 (the Liverpool)

When something is coded to NR or TOC etc. Does the other side see it too ? Using the above example. The attribution team kicks the delay back to NR and they end up swallowing it. But then, can the TOC see how many times NR have received a Y code or is this data considered 'sensitive'

I assume that delay data isn't public at all ? (Other than right time data)

Cheers in advance
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,667
When something is coded to NR or TOC etc. Does the other side see it too ? Using the above example. The attribution team kicks the delay back to NR and they end up swallowing it. But then, can the TOC see how many times NR have received a Y code or is this data considered 'sensitive'

I assume that delay data isn't public at all ? (Other than right time data)

Cheers in advance
It sits in TRUST, so the TOCs can see it, otherwise they cannot dispute it. If you have a log on and the right privileges then you can dispute incidents.
Not sure what SPATE means.
But both were Avanti Pendolino's - the ex-Liverpool running to slightly slower Class 810 timings with stops at Crewe, Stafford and Nuneaton. The ex- Glasgow stopped at Warrington BQ and was not due to stop until Rugby. It was about a minute late through Crewe, while the ex-Liverpool arrived Stafford mega early because it is a 125mph unit and was probably routed UFL rather than SL from Crewe and should have stopped in Stafford P4. It ended up in P1. It was not due to depart Stafford until 21:55, while the Glasgow was due through at 21:54 1/2. BUT - because the ex-Liverpool route was set out onto the FL, the Glasgow ended up being signal checked into Stafford awaiting its departure ahead of it. i would assume any ARS would have set the through line first for the ex- Glasgow unless it was seriously late and would have required a signaller to intervene and reset the route to let the Liverpool out in Front? But maybe the intervention into rerouting it into P1 messed the ARS up. Is the overlap for P1 so short that it would have required route setting back onto the USF to allow the set into the platform?

it seems a crazy decision. I cannot understand how an 80mph TSR justified this. And the services booked for P4 ahead of the Liverpool appear to have arrived and departed on time ok. The ex-Liverpool still ended up early at all its stops - quel surprise - while the Glasgow ended up 15 late - due to one unexplained regulating decision between Crewe and Stafford. Would not have happened in BR days. The 'express' would have gone through. Not sure AVANTI control would have been pleased with this either as it added cumulative delay minutes to the Glasgow at a time when it is struggling to improve its standing in the industry as well as regain passenger confidence.
Its how its been attributed, it doesn't mean its correct. It could well end up being disputed and moved.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,812
With 10 years delay attribution gamekeeper experience (and more in previous poacher roles) I'm gonna call what I see here. Putting it down to the TSR's an error as 1A82 is not in it's booked platform. If something's off booked route, be it platform, running line, or entire route, that (almost) always takes precedence in the attribution of the delay.

Here 1A82 has been put into platform 1 and the route set out the south end immediately, so there's no opportunity to pass 1M19. Why is it in platform 1? It's been send on the Up Fast from Crewe vice the Up Slow to get around early 6Q61 & 6O46 but would still have been switch to the Up Slow as Doxey Jn. That said on Tuesday 1A82 was also run on the Up Fast, with no other trains on the Up Slow, but as the route wasn't set through the platform 1M19 was able to get past. This seems to have been the normal way of doing things looking at other days too, so it's a combination of it being on the wrong line and the route being set through. If only one of the two doesn't happen 1M19 gets a clear run.
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
With 10 years delay attribution gamekeeper experience (and more in previous poacher roles) I'm gonna call what I see here. Putting it down to the TSR's an error as 1A82 is not in it's booked platform. If something's off booked route, be it platform, running line, or entire route, that (almost) always takes precedence in the attribution of the delay.

Here 1A82 has been put into platform 1 and the route set out the south end immediately, so there's no opportunity to pass 1M19. Why is it in platform 1? It's been send on the Up Fast from Crewe vice the Up Slow to get around early 6Q61 & 6O46 but would still have been switch to the Up Slow as Doxey Jn. That said on Tuesday 1A82 was also run on the Up Fast, with no other trains on the Up Slow, but as the route wasn't set through the platform 1M19 was able to get past. This seems to have been the normal way of doing things looking at other days too, so it's a combination of it being on the wrong line and the route being set through. If only one of the two doesn't happen 1M19 gets a clear run.
Is a short overlap at Stafford platform 1 a factor behind the route being set immediately out for 1A82?
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,812
Is a short overlap at Stafford platform 1 a factor behind the route being set immediately out for 1A82?

Shouldn't be, it hasn't previously been done line that from what I can see. Same was done last night as the night before, though 1M19 still arrived Euston early, blamed on the fatality at Rugby, presumably being unable to cross 1A82 to the Up Slow at Basford Hall Jn due to late 1S98, though again it could have crossed to platform 4 at Stafford without delaying anything else, or could have had the route not been set through platform 3 and the junction for 1D94 as it passed Rugeley 11 miles away. Personally I think the route being set very early's just the style of the signaller on duty the last couple of nights.
 
Last edited:

lineclear

Member
Joined
29 Mar 2016
Messages
137
Location
Yorkshire
It would be pretty unusual for a delay like this to be put down to the signaller, unless he/she had been instructed to change the booked order of service and he/she didn’t do so.
Suggested or requested maybe, but signallers are responsible for regulation. If the signaller could show that their decision minimised overall delay, or otherwise followed the regulating policy, they wouldn't get the delay.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,613
Location
UK
Is a short overlap at Stafford platform 1 a factor behind the route being set immediately out for 1A82?
The overlap for signal LS5582 at the Up end of platform 1 defaults to continuing towards the Arrival Sidings, i.e. away from the Up Fast. It can be swung towards the Up Fast but there is no point in doing this unless an onwards route is to be immediately set. See the attached screenshot from SimSig, which probably looks fairly similar to what the actual signallers see on their workstation.

The overlap therefore isn't an issue here. It would, however, be for the opposite move - train from the Down Fast calling at platform 3, then being overtaken by a non-stop service. In that case, the overlap from signal SC5591 at the Down end of platform 3 defaults to continuing onto the Down Fast, and the only alternative is swinging it towards the Up Slow (which therefore prevents a simultaneous arrival into platform 4). The overlap must time out before a route can be set for the overtaking service, which therefore extends the time needed for the overtaking move.
 