It’s fairly common knowledge that the popular bi mode class 80* units are notably faster on electric than on diesel. I’m assuming the cost of running them on Diesel is greater than on electric too.
should there be a supply problem (but no physical damage blocking the line) to the ohle and trains have to run on diesel, do they get to claim funds from Network Rail for additional costs with regard to diesel use, and get a discount from their fees for using the ohle, and/or if the train were to fall behind due to being on electric timings (unlikely at the moment but possible moving forwards) do the delay minutes for down to Network Rail or the operator.
Do we think an operator would make decisions on what to do with services based on the answers to the above questions or would they just suck up the extra cost to ensure as many passengers got to their destination as quickly as possible?
Edit : perhaps the wrong sub forum?
should there be a supply problem (but no physical damage blocking the line) to the ohle and trains have to run on diesel, do they get to claim funds from Network Rail for additional costs with regard to diesel use, and get a discount from their fees for using the ohle, and/or if the train were to fall behind due to being on electric timings (unlikely at the moment but possible moving forwards) do the delay minutes for down to Network Rail or the operator.
Do we think an operator would make decisions on what to do with services based on the answers to the above questions or would they just suck up the extra cost to ensure as many passengers got to their destination as quickly as possible?
Edit : perhaps the wrong sub forum?