SE, SWR & Hull Trains now up.
I'm just waiting for GWR nowSE, SWR & Hull Trains now up.
Liverpool down to 1tph is a disappointing, knowing how busy that corridor is.Liverpool drops to 1 tph.
If Rail North Partnership sign it off. Given they apparently turned down an emergency timetable, I can’t see this being signed off unless it’s short term.Which rumour has it, as far as the North Route is concerned, is:
1tph Saltburn to Manchester Airport
1tph Newcastle to Liverpool
1tph Hull to Manchester Piccadilly
Supplemented by:
1 stopping service ph Huddersfield to Manchester (with 2 am journeys and 2 pm journeys extended to and from Wakefield / Castleford)
1 shuttle ph Scarborough to York
The Leeds - Huddersfield stopping service is withdrawn and stops added on to the Hull to Manchester service instead.
The hourly Manchester Piccadilly to Newcastle or Scarbrough service is withdrawn.
The end result is basically 2 x express trains per hour between Leeds and Manchester instead of the 4tph now. The Hull cannot be counted as an express as it has turned in to a stopping train. Liverpool drops to 1 tph. Newcastle drops to 1 tph. Scarborough is just a shuttle to York. Intermediate stations between Huddersfield and Stalybridge drop to 1 tph all day, as opposed to 2tph at certain times now.
There are rumours of "peak time extras" but I can bet that these will be at the old pre-covid peak time and not the new peak time (i.e. all day Fridays, Saturdays and Sundays) so won't actually be of much use.
If the above is true then it is a recipe for chaos and disaster as there will be chronic and severe overcrowding at the busy times - and that's even assuming they are all worked as 5 car 802s or 6 car 185s - which of course they won't, 3 car 185s will pop up all over the place.
The cynic in me thinks we will never see any service uplift for years afterwards and the reduction in service will be used as an excuse to have long term reductions.
I am hoping when it appears that it won't be as bad as it looks - but I fear it will. It will also prove mind numbingly boring and depressing for staff too - there will be far too many people with nothing to do just sitting around at many depots.
Nationalise TPE now!If Rail North Partnership sign it off. Given they apparently turned down an emergency timetable, I can’t see this being signed off unless it’s short term.
The hourly Manchester Piccadilly to Newcastle or Scarbrough service is withdrawn.
Which would mean the only train capable of using the 25kV newly electrified line from Stalybridge to Guide Bridge in December is not going to operate.
That is a crazy waste of opportunity if true.
Liverpool drops to 1 tph
2tph to Manchester counting the (unreliable) south route.Liverpool down to 1tph is a disappointing, knowing how busy that corridor is.
The reason for the late startup is the need for maintenance work to take place. Passengers generally require earlier arrivals in London on Monday to Saturdays than Sundays so that’s why the service starts up later on that basis running earlier trains probably cannot be justified as the maintenance work would need to be done at another time which could potentially be more distruptive.
The early trains tend to be very busy, but this can be allowed for by running long trains. For example the first train from Bournemouth is 10 cars.
Why can Hull not? Presumably 802s will be used on as much as possible?
That said, infrastructure is for life not just for Christmas, and if this enables reliable operations it is absolutely the right thing to do.
It has been half-hourly for as long as I've known it.Bromley North is also half-hourly aswell
This is not true. The only service removed was the 1657 departure, other than that a 15 min frequency remains.As far as I can see there’s no massive changes for SE, the biggest one i’ve found at the moment is the removal of every 15-min Orpington stoppers from Victoria in the peak
== Doublepost prevention - post automatically merged: ==
Bromley North is also half-hourly aswell
2tph off-peak, 3tph peak. This is staying the sameIt has been half-hourly for as long as I've known it.
Mentioned upthread when the ScotRail services went in on Wednesday.Scotrail now available
Half hourly (not sun) evening service Glasgow to Ayr
Sunday half hourly Glasgow to Gourock part of the day
Cathcart Circle services back
If that is the level of service TPE can provide consistently day in day out with the available resources then so be it, at least we will have a timetable that people can believe in. The cuts should see the back of the MkV's and allow 6 car 185's on all Saltburn & Hull services simplifying the operation and training requirements.Which rumour has it, as far as the North Route is concerned, is:
1tph Saltburn to Manchester Airport
1tph Newcastle to Liverpool
1tph Hull to Manchester Piccadilly
Supplemented by:
1 stopping service ph Huddersfield to Manchester (with 2 am journeys and 2 pm journeys extended to and from Wakefield / Castleford)
1 shuttle ph Scarborough to York
The Leeds - Huddersfield stopping service is withdrawn and stops added on to the Hull to Manchester service instead.
The hourly Manchester Piccadilly to Newcastle or Scarbrough service is withdrawn.
The end result is basically 2 x express trains per hour between Leeds and Manchester instead of the 4tph now. The Hull cannot be counted as an express as it has turned in to a stopping train. Liverpool drops to 1 tph. Newcastle drops to 1 tph. Scarborough is just a shuttle to York. Intermediate stations between Huddersfield and Stalybridge drop to 1 tph all day, as opposed to 2tph at certain times now.
There are rumours of "peak time extras" but I can bet that these will be at the old pre-covid peak time and not the new peak time (i.e. all day Fridays, Saturdays and Sundays) so won't actually be of much use.
If the above is true then it is a recipe for chaos and disaster as there will be chronic and severe overcrowding at the busy times - and that's even assuming they are all worked as 5 car 802s or 6 car 185s - which of course they won't, 3 car 185s will pop up all over the place.
The cynic in me thinks we will never see any service uplift for years afterwards and the reduction in service will be used as an excuse to have long term reductions.
I am hoping when it appears that it won't be as bad as it looks - but I fear it will. It will also prove mind numbingly boring and depressing for staff too - there will be far too many people with nothing to do just sitting around at many depots.
This is not true. The only service removed was the 1657 departure, other than that a 15 min frequency remains.
2tph off-peak, 3tph peak. This is staying the same
I can't tell if the Knottingley and Doncaster entries are transposed, or just poorly written. There isn't a Knottingley call in the Doncaster-Leeds service, and the Knottingley-Leeds via Westgate doesn't currently call at Outwood.Northern have released their summary for the Dec change
![]()
May Timetable Changes
Northern | Buy Cheap Train Tickets and Check Train Timeswww.northernrailway.co.uk
Northern have released their summary for the Dec change
![]()
May Timetable Changes
Northern | Buy Cheap Train Tickets and Check Train Timeswww.northernrailway.co.uk
Basically the Leeds - Doncaster are going from 4 car 331s to 3 car 331s, to keep the capacity from Wakefield and Outwood the Knottingley to Leeds via Wakefield at peak times will be 4 car and call additionally at Outwood, as it is now the 1729 Knottingley is a 4 car 150 anyway as it splits at KnottingleyI can't tell if the Knottingley and Doncaster entries are transposed, or just poorly written. There isn't a Knottingley call in the Doncaster-Leeds service, and the Knottingley-Leeds via Westgate doesn't currently call at Outwood.
Basically the Leeds - Doncaster are going from 4 car 331s to 3 car 331s, to keep the capacity from Wakefield and Outwood the Knottingley to Leeds via Wakefield at peak times will be 4 car and call additionally at Outwood, as it is now the 1729 Knottingley is a 4 car 150 anyway as it splits at Knottingley
The plan as far as I know is to put some 333s on the Doncaster Line for the 4 car capacity but crew training hasn't started for Doncaster crew so stuck with the 3 car 331s for nowSounds logical as the railway strives towards Carbon Neutral to move passengers off electric trains to diesels…
Greater Anglia now up.
Yes but not surprised, no rolling stock for intercity or Stansted improvements, I think late September and October will be very busy and crowded, which may reflect in May changes as there will be another push for office return.I see next to no change SX. Very disappointing again.