Prestige15
Member
Curious to know why DC only Electrostars was never classified as 475-477 unlike the DC only Desiros?
Isn't that also the case for the 450s, given that they are in every other way identical to a 350?They were built with a pantograph well on the appropriate carriage, and as far as I'm aware there is space left somewhere in/on/underneath the train for AC equipment to be installed.
Isn't that also the case for the 450s, given that they are in every other way identical to a 350?
I believe 377s are based on 375s which are based on 357s, which are exclusively AC-powered. This may be why they are numbered in the 3xx range.Isn't that also the case for the 450s, given that they are in every other way identical to a 350?
The provision on the electrostars is a bit more than that on the desiros AIUI, including things such as the lump of concrete that each DC only electrostar lugs around in lieu of a transformer, and more of the necessary wiring being installed but not connected.
As for why they electrostars were 37x rather than 47x, like @Class465pacer says, the first batch of units ordered were dual-voltage (the 375/6s) - the 3 car 375/3 fleet followed, and despite being nominally DC only they make sense as a variant of 375 than a new fleet (same logic with the latter 375 fleets /7-/9). The conversion to 377 by changing the coupler makes things a bit messy as they could have gone 475 or 477, but AIUI at the same sort of time, the plans for the /1, /4, and critically /2 fleets were also in the works, again logically giving the class a 3xx number. The only real misnomer is the 376, being purely DC only (with AC provision admittedly) but with no basis for a 3xx number at the time. I suppose the logic was to keep the -stars in the same ballpark rather than splitting them into different ranges.
I'm not sure what the 450s are based off, if it was a DC design then that could account for them being numbered in the 4xx range.
You've got Class 357 being followed by 375, but the 377s were ordered at about the the same time and given a different class number purely to denote the different coupler;
I'd always understood it that the initial order for South Central was done under Connex (before they were booted out) and that those units were initially also set to be 375s... With GoVia amending the order and reclassifying once they took over before any of the units had been delivered. But as we know, the human memory isn't the most reliable!Point of order - 375s were first ordered by Connex in August 1997, the main 377 orders came under Govia in 2001 and 2002 - a 4 year gap isn't really "the same time" IMO! Similarly, the 'different coupler' was true of the time, but also reflected the different operator, something that has continued to happen since privatisation (and indeed happened pre-privatisation too with things like the 158s v 159s)
I believe this is why 377s 101-139 had the Southeastern interior prior to the 2012 (I think) refresh.I'd always understood it that the initial order for South Central was done under Connex (before they were booted out) and that those units were initially also set to be 375s... With GoVia amending the order and reclassifying once they took over before any of the units had been delivered. But as we know, the human memory isn't the most reliable!
I'm pretty sure the 450 were based on a exclusively AC-powered unit, Class 360I believe 377s are based on 375s which are based on 357s, which are exclusively AC-powered. This may be why they are numbered in the 3xx range.
I'm not sure what the 450s are based off, if it was a DC design then that could account for them being numbered in the 4xx range.