• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Dawlish sea wall collapse

Status
Not open for further replies.

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
Cockermouth was built a million pound flood defense barrier after its floods in 2009 and so far hasn't flooded again to the same extent. That's probably 'highly unlikely' to happen again but it didn't stop them spending.
The point is that local businesses need to have some assurance it won't happen again and the best way is protection. You can't predict it won't happen again in the near future, neither can I say it will happen again. Spending money in the short-term for the benefit of the long-term is surely better for all concerned, despite one person on here saying it'll neither be 'just' nor 'fair'.

Well given HSTEd wants to spend the money on a Severn Barrage from Ifracombe to the Gower with a chemical works in the centre to use the power without having to transmit it anywhere I'm sure Dawlish isn't that much of a ludicrous project.

Maybe a diversion is worth considering. I'm sure the EU would contribute given Cornwall has/had Objective One. In Switzerland they've built substantial bypasses on branch lines just to enable level crossings to be closed. The existing line can be kept for local services (my boss suggested using kettles in the summer to milk the tourists!)
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Lots of work going on the camera. Not sure what though, looks like more shoring up the temporary wall to ensure it doesn't happen again. Expecting rebuilding work to start by end of week apparently.

Anyone local to the area report what work is going on on the other less damaged sections?
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
From what I have heard it's not possible to get anywhere near most of the damage due to the security now in place, that's unless you have a boat...

I meant like to the west of dawlish that small section, the station.
 

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
I meant like to the west of dawlish that small section, the station.
Yes one of the breaches in the wall is between the station and Coryton Tunnel. The afternoon after it happened you could see the track suspended above the ballast at very close quarters from Marine Parade, what you can see now I've no idea. But the damage there is to the wall itself which you can only see from the beach, or from a distance on Teignmouth Hill where I'm told the footpath to Coryton Cove is still accessible. I haven't been there myself since that afternoon.
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
Cockermouth was built a million pound flood defence barrier after its floods in 2009 and so far hasn't flooded again to the same extent. That's probably 'highly unlikely' to happen again but it didn't stop them spending.

One has to remember that the 2009 flood at Cockermouth was not only caused by the effects of heavy rainfall but also by the fact that the river channels had never had regular dredging which resulted in the gradual build up of gravel build up over the preceding years that had been water-carried from the upland areas by the river.
 

hst2cornwall

Member
Joined
27 Jan 2012
Messages
47
Thats good, the 27th is my birthday and I'm travelling down to Cornwall on the 22nd, and back on the 29th so the return shouldn't be too bad if they complete by then.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,300
Last edited:

DXMachina

Member
Joined
24 Oct 2011
Messages
652
You got a better way to integrate an intermittant 35GWe power supply?
But yeah, its a massive project, but then again, every project I propose is massive :D

You should join my campaign to extend the East West Rail Link to Amsterdam
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
Was it you who proposed the submerged-tunnel cross-Atlantic rail route on this website last year ?

I've proposed one before. It's not physically impossible - go via Iceland so you're not submerged when crossing the mid-Atlantic ridge. Anyone got a spare trillion quid?
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
I've proposed one before. It's not physically impossible - go via Iceland so you're not submerged when crossing the mid-Atlantic ridge. Anyone got a spare trillion quid?

Maybe enabling works for this are being incorporated now as NR are saying a mid April completion date :roll:
 
Last edited:

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
Maybe you should go down and lend a hand?

So if I had a contract to do building works on your property and I suddenly said I need about another 4 weeks you would have absolutely no problem .issue or complaint whatsoever ? If so you have my total respect :idea:
 
Last edited:

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,131
Location
Redcar
Considering there has been further damage since the original 'contract', then no problem.

You do realise the scale of the problem here, don't you?
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
I only know what most others do by watching the news but I was wondering why they can't increase the manpower there to take account of the additional work required after last Friday nights storms especially when you consider Mr Cameron's big fanfare statement of funding being no object
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
I only know what most others do by watching the news but I was wondering why they can't increase the manpower there to take account of the additional work required after last Friday nights storms especially after Mr Cameron's big fanfare statement of funding being no object

They cant make concrete and mortar dry any quicker. They have not anywhere said Mid April. They are still considering their position. Also when 12 hours a day you cannot do any work you are losing mobilisation time etc and you are really struggling.

If i was doing building for you and you expected a hurricane catagory 2 storm to not impact the timescale i would tell you to shove it.
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,131
Location
Redcar

ECML180

Member
Joined
28 Oct 2013
Messages
518
Location
Doncaster
So if I had a contract to do building works on your property and I suddenly said I need about another 4 weeks you would have absolutely no problem .issue or complaint whatsoever ? If so you have my total respect :idea:

If since the date was agreed the sea had entered my property and smashed a lot of it to bits...yes ;)
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,509
They cant make concrete and mortar dry any quicker. They have not anywhere said Mid April. They are still considering their position. Also when 12 hours a day you cannot do any work you are losing mobilisation time etc and you are really struggling.

If i was doing building for you and you expected a hurricane catagory 2 storm to not impact the timescale i would tell you to shove it.

Thanks for explaining things a bit about construction techniques, however Network Rail have said just a short time ago on BBC radio 5 live that it is anticipated a mid April re opening so you are wrong on that one
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Haha the rest of my point is valid. I looked at 15:20 and they still said update by end of the week, it has changed between then and now :P
 

Woody

Member
Joined
10 Dec 2006
Messages
277
Mid April I am afraid and even that depends on the weather.

NETWORK RAIL has warned that another storm last weekend has delayed the repairs on the Great Western Main Line at Dawlish

http://www.railnews.co.uk/news/2014/02/19-dawlish-now-set-to-be.html

A Network Rail spokesmean in London speaking on my local ITV Westcountry news tonight simply said they will TRY their best to reopen the Dawlish line by mid April but warned that timeline was at the mercy of the weather.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Are the rail replacement buses really awful or is it that people just don't like travelling on buses. I try to avoid the replacement buses because they are usually slower.

Sent from my HUAWEI U8815 using Tapatalk
 
Status
Not open for further replies.

Top