• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

D1031 Western Rifleman

Status
Not open for further replies.

mike57

Established Member
Joined
13 Mar 2015
Messages
2,372
Location
East coast of Yorkshire
Saw the Yuletide East Yorkshireman pass through Bempton hauled by D1031 Western Rifleman. According to Wiki this engine was scrapped, and tour info said D1017 was being used. Can anyone explain please
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,836
Location
Rugby
It was D1015 "Western Champion". It often runs with different names.

http://www.westernchampion.co.uk/loco-d1015-nameplates.php

Have you ever wanted to see your favourite Western Class 52 locomotive hard at work on the Main Line? Well, now you can with the DIESEL TRACTION GROUP.....
We are offering you the chance to have your very own replica Western name and numberplate manufactured to original specifications, then carried on the ONLY mainline registered Class 52 whilst you travel behind it in style!
The DTG will manufacture and attach your plates to one side of D1015 Western Champion to be carried on a charter train of your choice. Also included are two tickets for yourself and a guest and a guided tour of 'your' engine during the tour.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,372
Location
East coast of Yorkshire
Thanks

Link explains everything, took a couple of pictures today, came home, Googled some info about engine etc. and ended up confused.
--- old post above --- --- new post below ---
And on a related note it was running well over half an hour late on arrival at Bridlington, and caused a bit of chaos on the single track section between Brid and Hunmanby, it had to wait for the Sheffield service to head south (13:58 Bempton) then headed north passing Bempton around 14:15. Northern service to Scarborough 14:13 Bempton was behind it and was running 30mins late by the time it came through around 14:45

I suspect there were some upset people on Northern service as they will have missed the 14:55 departure to Liverpool Lime Street at Seamer. Connections at Seamer are patchy between Northern and TPE, and this is one of the better ones, with 15 mins to wait so is popular.

Will the railtour company have to pick up the delay repay that will no doubt result from this?

And Northern have promised an hourly service on this line at the end of next, I suspect timetable will not be robust. Could this be the end of the very occasional specials on the Brid to Scarborough line.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Alas that was your last chance to see "D1031"/1015 for a while. One of the engines has had a major failure causing repairs to be required. The London-Cardiff-Plymouth-London 40 year anniversary tour in February is the first cancellation with also the out Western/back Tornado tour also now subject to change.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Thanks

Link explains everything, took a couple of pictures today, came home, Googled some info about engine etc. and ended up confused.
--- old post above --- --- new post below ---
And on a related note it was running well over half an hour late on arrival at Bridlington, and caused a bit of chaos on the single track section between Brid and Hunmanby, it had to wait for the Sheffield service to head south (13:58 Bempton) then headed north passing Bempton around 14:15. Northern service to Scarborough 14:13 Bempton was behind it and was running 30mins late by the time it came through around 14:45

I suspect there were some upset people on Northern service as they will have missed the 14:55 departure to Liverpool Lime Street at Seamer. Connections at Seamer are patchy between Northern and TPE, and this is one of the better ones, with 15 mins to wait so is popular.

Will the railtour company have to pick up the delay repay that will no doubt result from this?

And Northern have promised an hourly service on this line at the end of next, I suspect timetable will not be robust. Could this be the end of the very occasional specials on the Brid to Scarborough line.
The original delay was an NR points failure at Kidderminster preventing the Western getting off the SVR on to the tour train.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,372
Location
East coast of Yorkshire
Alas that was your last chance to see "D1031"/1015 for a while. One of the engines has had a major failure causing repairs to be required. The London-Cardiff-Plymouth-London 40 year anniversary tour in February is the first cancellation with also the out Western/back Tornado tour also now subject to change.

Sorry to hear that, when did this happen?

Seemed to be making a reasonable speed going towards Scarborough through Bempton.
 

Dhassell

Member
Joined
22 Mar 2015
Messages
1,011
Quoted from WNXX: "On the return from Scarborough D1015 experienced a problem with B engine. Initial assessments were that this was serious enough to withdraw the loco from traffic. However in the cold light of day and after some reflection it is now felt that we should wait until the Loco returns to the Severn Valley and a full and through inspection of the problem is undertaken by the DTG Engineering Staff. Further news will be posted after this inspection has taken place. As things stand today the loco is still available for all previously advertised railtour duties until notified otherwise."
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
There's also a statement on the Pathfinder website at http://www.pathfindertours.co.uk/index.php/tour-calendar-reader/events/the-western-glory.html

UPDATE

D1015 'WESTERN CHAMPION' SUFFERED A SERIOUS PROBLEM TO ONE OF ITS TWO ENGINES DURING THE LATTER PART OF ITS HAULAGE OF OUR 'YULETIDE EAST YORKSHIREMA' EXCURSION ON 17 DECEMBER. IT SUCCESSFULLY COMPLETED THE LAST FEW MILES OF THE RUN ON ONE ENGINE.

THE LOCOMOTIVE'S OWNERS, THE DIESEL TRACTION GROUP (DTG), WILL NOW REMOVE AND INSPECT THE PROBLEMATIC ENGINE TO ASCERTAIN WHAT COURSE OF ACTION IS NEEDED, AND PUT A TIMESCALE ON REPAIRS.

IN THE LIGH TOF THIS DEVELOPMENT WE WILL AWAIT FURTHER NEWS FROM THE DTG, AND WILL UPDATE THE POSITION IN THE FIRST PART OF JANUARY, FIRSTLY BY CONTACTING BOOKED PASSENGERS AND THEN UPDATING THIS WEBSITE.

WE WISH DTG WELL WITH ITS INVESTIGATIONS, AND HAVE OUR FINGERS VERY FIRMLY CROSSED.

STATEMENT PUBLISHED 19-12-16
 
Status
Not open for further replies.

Top