drb61
Member
I have a trip planned to London travelling down on the evening of Thursday 29th, returning the following evening and plan to take my cycle with me as last time I was in London I found cycling a great way to get around the capital with its excellent cycling infrastructure.
As I arrive back quite late on the Friday evening, I had planned to drive to Motherwell and leave my van parked at a colleague's house, in case my train is delayed and I miss the last connection back home to Cambuslang (don't really fancy at 10 mile cycle close to midnight on a January evening).
Having had the tickets booked for me earlier today by the company paying for my travel, I collected them and went to the travel centre at Glasgow Central to add on cycle reservations. The helpful assistant tried finding several services between Motherwell and Euston with cycle spaces available to no avail. After then repeating the search on the original services I was booked on it appeared that the cycle spaces WERE available if booked from / to Glasgow Central, rather than Motherwell! What apparently transpired was that loading and unloading of cycles on Avanti West Coast services at Motherwell is no longer allowed, which seems bizarre as I've used Avanti services from Motherwell with my bike previously without any issues. The cycle reservations were then duly issued from / to Glasgow Central along with a permit to travel for a return journey from Motherwell to Glasgow, but what I think I'll just do instead is park the van somewhere near Glasgow Green, a relatively short distance from Glasgow Central.
Does anyone have any idea why this restriction has come into force? Perhaps to reduce dwell time of Avanti services at Motherwell? Or have dispatch staff at Motherwell (needed to open the door of the cycle compartment) been cut back? Or are ScotRail staff now refusing to do this because Avanti are a different company? I assume this restriction wouldn't apply on TPE or XC services where no staff intervention is required for loading / unloading cycles? Are there any other stations on the network where loading / unloading of cycles is prohibited?
As I arrive back quite late on the Friday evening, I had planned to drive to Motherwell and leave my van parked at a colleague's house, in case my train is delayed and I miss the last connection back home to Cambuslang (don't really fancy at 10 mile cycle close to midnight on a January evening).
Having had the tickets booked for me earlier today by the company paying for my travel, I collected them and went to the travel centre at Glasgow Central to add on cycle reservations. The helpful assistant tried finding several services between Motherwell and Euston with cycle spaces available to no avail. After then repeating the search on the original services I was booked on it appeared that the cycle spaces WERE available if booked from / to Glasgow Central, rather than Motherwell! What apparently transpired was that loading and unloading of cycles on Avanti West Coast services at Motherwell is no longer allowed, which seems bizarre as I've used Avanti services from Motherwell with my bike previously without any issues. The cycle reservations were then duly issued from / to Glasgow Central along with a permit to travel for a return journey from Motherwell to Glasgow, but what I think I'll just do instead is park the van somewhere near Glasgow Green, a relatively short distance from Glasgow Central.
Does anyone have any idea why this restriction has come into force? Perhaps to reduce dwell time of Avanti services at Motherwell? Or have dispatch staff at Motherwell (needed to open the door of the cycle compartment) been cut back? Or are ScotRail staff now refusing to do this because Avanti are a different company? I assume this restriction wouldn't apply on TPE or XC services where no staff intervention is required for loading / unloading cycles? Are there any other stations on the network where loading / unloading of cycles is prohibited?