The ongoing Coulsdon North thread has triggered this post.
One thing I've known for a while is the significant cuts to BML stopping services which (probably) came in when Gatwick Express was introduced in 1984, though I cannot be certain (as I've only seen the timetables of 1983 and 1985).
In the early 80s up to the 1983/84 timetable, the typical BML pattern south of Redhill, viewable via the 1982 GBPTT and 1981 ABC timetable on Timetable World was:
1tph Brighton fast
1tph Brighton semi-fast
1tph Ore
1tph Littlehampton (Hove)
1tph Portsmouth/Bognor (Gatwick and Horsham)
2tph Brighton stoppers (semi-fast to Gatwick, via Redhill, then slow). Conveys Rapid City Link (VEG) portion to Gatwick
2tph Horsham stoppers (one Redhill, one Quarry; Horley then stopping). One tph extended to Bognor. Conveys Rapid City Link (VEG) portion to Gatwick
2tph London Bridge-Crystal Palace-East Croydon-Redhill stoppers. Interestingly and atypically for a mainline service, called at most stations within Inner London. (classed as mainline, not suburban, as they were VEP operated).
I have never seen the 1984/85 timetable, so cannot be certain of the service pattern but it would be very interesting to see it if anyone has a timetable for that year.
The rest is from memory, but I am sure of what is described below as the 1985-88 period was my peak period of visits to, and interest in, the Central Division.
By 1985/86 one Brighton stopper and one Horsham stopper had been lost, so a net loss of 2tph. This was presumably due to the additional paths required for Gatwick Express, though there was no attempt to retain the stoppers with different timings. Additionally, the Bognor service gained Ifield and Littlehaven stops to compensate for one lost stopper per hour. The Horsham stoppers mostly terminated there, with irregular and very "un-Southern-like" extensions to Littlehampton in certain hours, meaning Christs Hospital and Amberley had an erratic daytime service (the Bognors not calling at either).
By 1986/87 the pattern changed again somewhat though with the same base departure times, give or take, from Victoria. The Redhill stoppers were lost, while the Brighton stopper was diverted to Horsham (restoring 2tph stoppers here) and called additionally at Coulsdon South and Merstham due to the lost Redhill stoppers. An additional London Bridge-Brighton (Quarry, all stations beyond Gatwick IIRC) was added, to compensate for the lost Brighton stopper diverted to Horsham. The Bognor services skipped Ifield and Littlehaven again. Thus in 1986/87 we were only 1tph "down" compared to 1983 south of Redhill, but as many as 3tph "down" north of Redhill.
Brighton itself thus had only 3tph down the mainline from the London/Gatwick direction, compared to 4tph in pre-GatEx days.
By 1988 the London Bridge-Brighton became a Thameslink in (IIRC) the same path, and was joined by a second Thameslink per hour to Gatwick, this marking the start of some of the lost services coming back. South of Redhill was now on parity with 1983, though still 2tph down south of Purley.
So it does appear that the stoppers on the Brighton line were seen as less important in the mid-80s compared to earlier in the 80s. Obviously Gatwick Express caused a recast but when that recast was done, preserving 2 stoppers to each of Brighton and Horsham was presumably considered less important. Presumably loadings on these stoppers were down in the period immediately before GatEx, and it was not seen as a priority to retain all four of them? (These were the "Rapid City Link" services, the forerunner of GatEx, but even still, they also served as stoppers south of Gatwick).
One thing I've known for a while is the significant cuts to BML stopping services which (probably) came in when Gatwick Express was introduced in 1984, though I cannot be certain (as I've only seen the timetables of 1983 and 1985).
In the early 80s up to the 1983/84 timetable, the typical BML pattern south of Redhill, viewable via the 1982 GBPTT and 1981 ABC timetable on Timetable World was:
1tph Brighton fast
1tph Brighton semi-fast
1tph Ore
1tph Littlehampton (Hove)
1tph Portsmouth/Bognor (Gatwick and Horsham)
2tph Brighton stoppers (semi-fast to Gatwick, via Redhill, then slow). Conveys Rapid City Link (VEG) portion to Gatwick
2tph Horsham stoppers (one Redhill, one Quarry; Horley then stopping). One tph extended to Bognor. Conveys Rapid City Link (VEG) portion to Gatwick
2tph London Bridge-Crystal Palace-East Croydon-Redhill stoppers. Interestingly and atypically for a mainline service, called at most stations within Inner London. (classed as mainline, not suburban, as they were VEP operated).
I have never seen the 1984/85 timetable, so cannot be certain of the service pattern but it would be very interesting to see it if anyone has a timetable for that year.
The rest is from memory, but I am sure of what is described below as the 1985-88 period was my peak period of visits to, and interest in, the Central Division.
By 1985/86 one Brighton stopper and one Horsham stopper had been lost, so a net loss of 2tph. This was presumably due to the additional paths required for Gatwick Express, though there was no attempt to retain the stoppers with different timings. Additionally, the Bognor service gained Ifield and Littlehaven stops to compensate for one lost stopper per hour. The Horsham stoppers mostly terminated there, with irregular and very "un-Southern-like" extensions to Littlehampton in certain hours, meaning Christs Hospital and Amberley had an erratic daytime service (the Bognors not calling at either).
By 1986/87 the pattern changed again somewhat though with the same base departure times, give or take, from Victoria. The Redhill stoppers were lost, while the Brighton stopper was diverted to Horsham (restoring 2tph stoppers here) and called additionally at Coulsdon South and Merstham due to the lost Redhill stoppers. An additional London Bridge-Brighton (Quarry, all stations beyond Gatwick IIRC) was added, to compensate for the lost Brighton stopper diverted to Horsham. The Bognor services skipped Ifield and Littlehaven again. Thus in 1986/87 we were only 1tph "down" compared to 1983 south of Redhill, but as many as 3tph "down" north of Redhill.
Brighton itself thus had only 3tph down the mainline from the London/Gatwick direction, compared to 4tph in pre-GatEx days.
By 1988 the London Bridge-Brighton became a Thameslink in (IIRC) the same path, and was joined by a second Thameslink per hour to Gatwick, this marking the start of some of the lost services coming back. South of Redhill was now on parity with 1983, though still 2tph down south of Purley.
So it does appear that the stoppers on the Brighton line were seen as less important in the mid-80s compared to earlier in the 80s. Obviously Gatwick Express caused a recast but when that recast was done, preserving 2 stoppers to each of Brighton and Horsham was presumably considered less important. Presumably loadings on these stoppers were down in the period immediately before GatEx, and it was not seen as a priority to retain all four of them? (These were the "Rapid City Link" services, the forerunner of GatEx, but even still, they also served as stoppers south of Gatwick).
Last edited:

