There is a somewhat strange arrangement on this line in the mornings.

(Apologies, I should have opened the timetable before posting this, now I shall have to do it from memory).

In the mornings, I think it is the third northbound service from Barrow terminates at Sellafield around 09.00 and then heads back to Barrow. (I assume this is primarily to serve BNFL workers.)

Meanwhile, there is a southbound train from Carlisle train that terminates at Whitehaven.

Does anyone know why these trains are not just extended northwards and southwards to create two through services? OK, there may be some delays by 10 minutes or so to current services, but surely the advantage of having through trains would outweigh any disadvantages - especially as by not doing so creates a huge gap in connecting trains at a popular time for departure.

It means eg anyone leaving Whitehaven or Workington for the south either has to get up at dawn or wait until mid-morning. And v v for someone wanting to head north from Millom/Ravenglass/Sellafield. Maybe there is not a huge traffic demand (it's too late for most working commuters, probably) but still seems to me to be a strange negative timetabling move.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,988
Location
Airedale
It would be do-able on Saturdays with the present timetable. I presume there is a good reason why the Barrow - Sellafield runs later SX.

However, it's possible that the two workings are operated by different types of unit (153 v 156) and through working would foul up the diagrams.

Having said that, is there that much time-sensitive demand for e.g. Workington-Barrow at 0830?
 
Last edited:

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
It would be do-able on Saturdays with the present timetable. I presume there is a good reason why the Barrow - Sellafield runs later SX.

However, it's possible that the two workings are operated by different types of unit (153 v 156) and through working would foul up the diagrams.

Having said that, is there that much time-sensitive demand for e.g. Workington-Barrow at 0830?

And, perhaps, additional traincrew. Sometimes Timetables can be resource led, i.e. trains doing whatever for diagramming purposes. Also as long as the franchise commitment of providing xx number of trains and at specified times over a route is met, so be it.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
It should really be fully doubled, I think. The line serves Carlisle (pop. 73000), Barrow (56000), Workington (25000), Whitehaven (23000), Dalton-in-Furness (12000), Maryport (also 12000), Ulverston (11000), Millom (7000), Dalston (also 7000), Wigton (5000), and Grange-over-Sands (4000), alongside a nuclear power station.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
Why full doubling? What sort of service would require that? The only way you will ever get any sort of major change along there is if a wholesale closure of all the boxes and ERTMS comes in on it, which considering the amount of mechanical boxes along there I am surprised they havent been put on the NR list of doom.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,345
It should really be fully doubled, I think. The line serves Carlisle (pop. 73000), Barrow (56000), Workington (25000), Whitehaven (23000), Dalton-in-Furness (12000), Maryport (also 12000), Ulverston (11000), Millom (7000), Dalston (also 7000), Wigton (5000), and Grange-over-Sands (4000), alongside a nuclear power station.


It would be extremely expensive to try to double some of the sections where the line runs on a narrow ledge between sea & cliffs.
 

NoMorePacers

Established Member
Joined
18 Feb 2016
Messages
1,401
Location
Humberside
It should really be fully doubled, I think. The line serves Carlisle (pop. 73000), Barrow (56000), Workington (25000), Whitehaven (23000), Dalton-in-Furness (12000), Maryport (also 12000), Ulverston (11000), Millom (7000), Dalston (also 7000), Wigton (5000), and Grange-over-Sands (4000), alongside a nuclear power station.
Go on then. Cut through nature reserves for a small line for which most stations are request stops.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Go on then. Cut through nature reserves for a small line for which most stations are request stops.

There's definitely a need for heightened infrastructure there to serve Sellafield. Perhaps a loop at Nethertown or something...?
 

NoMorePacers

Established Member
Joined
18 Feb 2016
Messages
1,401
Location
Humberside
The Cumbrian Coast line probably not be doubled anytime soon because:
a) There are nature reserves on the line
b) There would be an extensive resignalling project involved
c) That costs a lot, and with diminishing funds NR have other priorities
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
The Cumbrian Coast line will probably not be doubled anytime soon because:
a) There are nature reserves on the line
b) There would be an extensive resignalling project involved
c) That costs a lot, and with diminishing funds NR have other priorities

Fixed that for you.
 

43106

Member
Joined
6 Jul 2008
Messages
384
Location
South-ish Edinburgh
Didn't Windscale catch fire in 1957?

Sort of. There were a couple of atomic piles with the specific task of making plutonium for Britain's atomic bombs. Because of a small design fault, some of the plutonium pellets in one of the piles didn't finish up in the pond of water at the bottom of the end of the pile. As a result, they caught fire, and it spread to the main body of the pile, causing a massive release of radio-active muck through the heat outlet chimney. My father was working on-site at the time (on the AGR) and he got trapped in the site, as the authorities wouldn't allow anyone in or out. I JUST remember it, as I was living in Seascale at the time. See...