A timetable and funding plan for the long-delayed Croxley Rail Link proposal has been drafted.

Hertfordshire County Council has announced it hopes to have the £26million project complete by January 2014.

Source

This is great news, I'm very excited about this, it's something to look forward to in my area.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
17 Aug 2009
Messages
790
Location
Brigg Line
Source

This is great news, I'm very excited about this, it's something to look forward to in my area.

For someone who traveling to London now and again and parks at Watford "Met" Station and gets the tube into London this is great news

Its a bit of a walk from the tube station to the town centre and I know this idea has been on the cards.

Also as a footie fan glad they are opening a station near Watford FC as this will be much better for travelling fans :D
 
Last edited:

carlovel1

Member
Joined
14 Apr 2009
Messages
11
COPYWRITE BY ME ;D
watfordlink.png
 

Daniel

Established Member
Joined
5 Oct 2005
Messages
2,563
Location
London
Rather strange considering the amount of money they've just spent there...!
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
I would keep it open and run a shuttle service from Watford - Chesham via Rickmansworth :D

That's a very good idea actually. It'd be better to do it to Watford junction, but the low usage of the north curve is stupid. They might aswell lift the tracks seeing as they run one train per day on it.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Sure I read (probably on here!) that Chesham will get 2tph direct to Baker St/Aldgate when the new stock comes in, with Amersham dropping from 4tph to 2tph as a result.

At a guess this is to save needing a 4-car branch set so the new stock can all be 8 car with no centre cabs, or however long it is going to be?
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Sure I read (probably on here!) that Chesham will get 2tph direct to Baker St/Aldgate when the new stock comes in, with Amersham dropping from 4tph to 2tph as a result.

At a guess this is to save needing a 4-car branch set so the new stock can all be 8 car with no centre cabs, or however long it is going to be?

They've been talking about reducing them to seven cars because the new trains are longer and don't fit into most platforms. And yes, wonderful Chesham is getting 2TPH to aldgate, but I don't see it being nessecary. It's nice to have the shuttle because you get to sit and have a chat with the driver before the train sets off. You can often get a cab ride with the friendly drivers too.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I think were was a plan that the District, H&C and Circle/Teacup sets would be seven cars, but I'd also seen indications that that had been dropped in favour of an entirely EIGHT car fleet with some form of SDO (after all, SDO is in limited use on some tube lines)
 

A60K

Member
Joined
26 Jun 2008
Messages
1,030
Location
Kilburn
I think were was a plan that the District, H&C and Circle/Teacup sets would be seven cars, but I'd also seen indications that that had been dropped in favour of an entirely EIGHT car fleet with some form of SDO (after all, SDO is in limited use on some tube lines)

Even with just 7 cars SDO will be required on some parts of the Circle/H&C, and I don't think 8 cars will be physically possible, due to junctions, signalling sections and so on.


 

Waddon

Member
Joined
15 Sep 2009
Messages
469
Is there still a long term plan to extend the Bakerloo back to Watford Junction?
 

Engineer EA

Member
Joined
8 Feb 2010
Messages
17
Location
Norwich
Source A timetable and funding plan for the long-delayed Croxley Rail Link proposal has been drafted.

Hertfordshire County Council has announced it hopes to have the £26million project complete by January 2014.
Source

This is great news, I'm very excited about this, it's something to look forward to in my area.

My guess is this long awaited project is on the back burner again. Can anyone confirm this.
 
Last edited:

bengley

Established Member
Joined
18 May 2008
Messages
1,987
This thread is a year old. I don't think there's been any news about the link for this time.
 

33056

Established Member
Joined
12 Nov 2007
Messages
2,424
Location
On a train somewhere in Europe
This plan comes firmly into the category of "I'll believe it when I see it". Over 18 years since I stopped working at Watford and they were on about it way back then :o
 