Yes, I know the service pattern isn't fully decided yet, but as far as I am aware, 14 - 16tph will be terminating from Liverpool St at Paddington for Crossrail. Am I the only person in the world that thinks this is stupid?
A few ideas.
Link to the Met Line using the Dudden Hill Alignment 4 tracking between Dudden Hill and the Met Line and 25kv/750VDC the line, dual voltage stock for crossrail (ya know, the same as thameslink) Run 25KV OHL for the full length from GWML to MML (to connect to the MML for ECS, freight etc.) Grade seperated juncton at Neasden continuing 25KV OHL to Wembley Park where it would switch over to 630V/750V DC. Met Line to retain Uxbridge - Algate service. All Baker St terminators (10tph) handed over to Crossrail with current Calling Pattern.
Using the same Dudden Hill link as above, connect the WCML to Crossrail, handing over any of the following...
Watford DC Line 3 - 4tph
Tring / Milton Keynes Central slows, 3 - 4tph
Electrify the Greenford Branch Line and retain it's 2 - 4tph into Crossrail, avoiding a Diesel Island.
Electrify the Slough - Windsor Branch line, this would need a flying junction to cross the mainline though, so proberbly less likley.
TBH. The link to the WCML and Chiltern/Met line seems most sensible, esp if it links in to the MML and the same stock is ordered for both Crossrail and Thameslink, but that would make too much bloddy sense!
A few ideas.
Link to the Met Line using the Dudden Hill Alignment 4 tracking between Dudden Hill and the Met Line and 25kv/750VDC the line, dual voltage stock for crossrail (ya know, the same as thameslink) Run 25KV OHL for the full length from GWML to MML (to connect to the MML for ECS, freight etc.) Grade seperated juncton at Neasden continuing 25KV OHL to Wembley Park where it would switch over to 630V/750V DC. Met Line to retain Uxbridge - Algate service. All Baker St terminators (10tph) handed over to Crossrail with current Calling Pattern.
Using the same Dudden Hill link as above, connect the WCML to Crossrail, handing over any of the following...
Watford DC Line 3 - 4tph
Tring / Milton Keynes Central slows, 3 - 4tph
Electrify the Greenford Branch Line and retain it's 2 - 4tph into Crossrail, avoiding a Diesel Island.
Electrify the Slough - Windsor Branch line, this would need a flying junction to cross the mainline though, so proberbly less likley.
TBH. The link to the WCML and Chiltern/Met line seems most sensible, esp if it links in to the MML and the same stock is ordered for both Crossrail and Thameslink, but that would make too much bloddy sense!
).