Looking at the TfL Engineering calendar here, Saturday 12th November states:
Saturday 12 November, no service between Whitechapel and Shenfield. The limited services between Liverpool Street main line platforms and Shenfield will also not operate.
Speaking about trains between Whitechapel and Shenfield, and calling the mainline platform trains a 'limited service' suggests through running begins before then. Backs up the rumours of November 6th.

The constant closed on Sundays and limited hours message is still ending at the end of September, further adding to hope we might get Sunday services.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
Looking at the TfL Engineering calendar here, Saturday 12th November states:

Speaking about trains between Whitechapel and Shenfield, and calling the mainline platform trains a 'limited service' suggests through running begins before then. Backs up the rumours of November 6th.

The constant closed on Sundays and limited hours message is still ending at the end of September, further adding to hope we might get Sunday services.

Pretty strong corroboration. Although (unrelated to beginning of through running) - I thought the peak trains into Liverpool Street high level were only running on weekdays?
 

Stephen42

Member
Joined
6 Aug 2020
Messages
807
Location
London
Pretty strong corroboration. Although (unrelated to beginning of through running) - I thought the peak trains into Liverpool Street high level were only running on weekdays?
Yes, the message probably relates to a revised Sunday service to reinforce there will no trains rather than only trains to high level. Compare to Sunday 23rd October which counts the current Sunday frequency as reduced frequency presumably as using just the high level platforms.
Sunday 23 October, a reduced frequency of 4 trains per hour will operate between Liverpool Street and Shenfield
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
They are Class 9 on RTT and show as passenger so I guess that's an error?


== Doublepost prevention - post automatically merged: ==

Just looked on TPE ticket sales and it shows Acton Main Lone to Stratford changing once at Farringdon....and you can buy tickets for it but then it also states "test train not for public use" for both so very poor.

It's not an error. They are test trains as another trial for through-running prior to Autumn. They shouldn't be showing up as available to buy though.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
807
Location
London
It's not an error. They are test trains as another trial for through-running prior to Autumn. They shouldn't be showing up as available to buy though.
It's unclear whether they needed to be entered as advertised passenger though. Potentially there was a reason given ones after around 4pm the schedules were marked as unadvertised according to Real Time Trains.

The next through running Sunday with the same schedules from a quick glance on the 4th September from Real Time Trains has them all marked as unadvertised.
 

Bigbru

Member
Joined
4 Jun 2017
Messages
89
It's unclear whether they needed to be entered as advertised passenger though. Potentially there was a reason given ones after around 4pm the schedules were marked as unadvertised according to Real Time Trains.

The next through running Sunday with the same schedules from a quick glance on the 4th September from Real Time Trains has them all marked as unadvertised.
It probably helps test everything, such as all the platform PIS screens. It's all interlinked they might not be able to run it them without being 'in passenger service'
 

SussexSeagull

Member
Joined
13 Aug 2021
Messages
208
Location
Worthing
I travelled from Durrington to Stratford yesterday and the National Rail app had a strange setup where it listed the Crossrail test trains but told you not to use them! Pity, as Thameslink to Farringdon then Crossrail to Stratford would have been a quite direct way of getting there.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,313
Location
Bath
I thought there were no plans for services from Stratford to go beyond Paddington in the foreseeable future anyway? So why include that connection in test running?
Because it minimises the trains used. That way the connection onto both the East and Western section can be tested by one train, meaning the other stock can undergo maintenance and be used on normal running.
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
Because it minimises the trains used. That way the connection onto both the East and Western section can be tested by one train, meaning the other stock can undergo maintenance and be used on normal running.

That makes sense! Thanks.
 

andrew749

Member
Joined
25 Oct 2021
Messages
64
Location
Essex
It could also help for differentiating between generalised issues at a signalling interface versus train-based issues (e.g. unit A has problems when switching between signalling systems at both ends, whereas unit B doesn't, and unit C has problems only at one interface).
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
I thought there were no plans for services from Stratford to go beyond Paddington in the foreseeable future anyway? So why include that connection in test running?

There will be a few service trains from the GEML going beyond Paddington, typically at the beginning and end of the day.
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
There will be a few service trains from the GEML going beyond Paddington, typically at the beginning and end of the day.

Do/will some of the East-Paddington units be stabled somewhere out west with West-Abbey Wood units? In which case this would be some trains doing the Paddington interface in service rather than (currently) out of service? Or is it for stock rotation? Or maintaining driver familiarity?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
Do/will some of the East-Paddington units be stabled somewhere out west with West-Abbey Wood units? In which case this would be some trains doing the Paddington interface in service rather than (currently) out of service? Or is it for stock rotation? Or maintaining driver familiarity?

2/3 Yes! ;)
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,268
Was there a planned reduced service on Saturday, as they seemed to be only running every 10 minutes at 7pm?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
There will be a few service trains from the GEML going beyond Paddington, typically at the beginning and end of the day.

To be fair, there are already a fair few ECS moves that do this.

== Doublepost prevention - post automatically merged: ==

Was there a planned reduced service on Saturday, as they seemed to be only running every 10 minutes at 7pm?

Strike day contingency - can't run a full service otherwise units get stranded in the central section and can't get to depots on NR infrastructure after the signallers finished at 1900.
 

TFN

Member
Joined
17 Aug 2017
Messages
464
Location
London
Was there a planned reduced service on Saturday, as they seemed to be only running every 10 minutes at 7pm?
Probably in relation to the RMT strike action as MTR arranged some trains to enter Old Oak before it wouldn't be possible after 1830/1900.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,268
Thanks, I was quite surprised as there was clearly a planned 10 minute frequency, rather than a one off gap
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
Thanks, I was quite surprised as there was clearly a planned 10 minute frequency, rather than a one off gap

A planned withdrawal - every other train going into Old Oak so the frequencies ease down in order until 6tph is reached.


== Doublepost prevention - post automatically merged: ==

Here’s a secondary, public source of the 6th November opening date.


NEW: Next stage of Elizabeth line to open Nov 6 & Bond St station. More services, fewer changes ie Reading - Abbey Wood & Shenfield - Paddington with no change. Becomes 2 railways not 3.
 
Last edited:

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
I thought there were no plans for services from Stratford to go beyond Paddington in the foreseeable future anyway? So why include that connection in test running?
I think they are just testing that service pattern because it allows the two transition points to be tested. Doesn't mean that pattern would be used in regular service
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London
I think they are just testing that service pattern because it allows the two transition points to be tested. Doesn't mean that pattern would be used in regular service
But this will not test frequent flipping of the points at Stepney Green and Westbourne Park every couple of minutes, unless they are flipping them for ghost trains as part of the test.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
12,001
Location
here to eternity
Discussion in this thread should be confined to Crossrail currently.

For discussion about the through running from November please use this thread:



 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
But this will not test frequent flipping of the points at Stepney Green and Westbourne Park every couple of minutes, unless they are flipping them for ghost trains as part of the test.
They were still running trains between Abbey wood and Acton West Ealing too
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
WRT Bond Street, in the run up to the original start of services, the Project Team would announce when each station had been handed over to Operations, the staff who will actually run the station. Has this happened to Bond Street? If not the handover will give us an indication of when it is likely to open.
 

mrmartin

Established Member
Joined
17 Dec 2012
Messages
1,296
Does anyone know what times trains will run to eventually? Similar time to now or a bit later?

Also, anyone seen any updates on 4G?
 

alholmes

Member
Joined
4 Jun 2012
Messages
477
Location
London E3
Does anyone know what times trains will run to eventually? Similar time to now or a bit later?
A look at RTT for November 7th shows last through trains from Tottenham Court Road to the following destinations:

East:
00:04 Abbey Wood
00:27 Shenfield

West:
22:30 Reading
23:10 Heathrow T4
23:30 Maidenhead
00:29 Paddington
 