If they are opening it in December they may as well push it to the network rail timetable change date for publicity reasons if anything else
Not at all... Autumn has always lasted from the September equinox until the day before the December solstice.They have also said the next stage is 'Autumn' but there's a weekend closure on 29/30th October - meaning next stage wouldn't open until November at the earliest. That's pushing the definition of Autumn!!
No, I'm afraid it hasn't been explained to me. If the service suddenly cannot run through the last place that's going to be the critical point would be the three reversing sidings. It's going to be on the westbound Crossrail platform at Paddington, unexpectedly having to tip out whole trainloads every 2.5 minutes - that's not going to happen, and it's a fiction to pretend that it would.I’m sure it’s been explained to you before; but to reiterate.
Westbourne Park has to be capable of turning the full train service in the event Elizabeth Line trains cannot access the NR lines west of Paddington.
That means theoretically turning 24tph, with no ability to change crews etc in the process to speed it up.
That is why auto reverse is needed for 24tph.
Funnily enough we don’t use traditional Chinese, try the 21st December for our end of autumn.Autumn officially ends at about 7 or 8 November using the traditional Chinese definition, so it's still in proper autumn if it is done early November.
Funnily enough we don’t use traditional Chinese, try the 21st December for our end of autumn.
Given the UK's obsession with weather, I've always regarded the meteorological months as the the most appropriate definition. The unscientific way of defing the first day of summer on midsummer's day is a bit daft anyway.Traditional seasonal dates are ambiguous - eg astronomical and meteorological practice is at variance in many places (including in Britain). Then there are specific cultural definitions too. There isn't one definitive answer. (Annoyingly.)
I think that's more of a Travel South Yorkshire thing.Given the UK's obsession with weather, I've always regarded the meteorological months as the the most appropriate definition. The unscientific way of defing the first day of summer on midsummer's day is a bit daft anyway.
Autumn officially ends at about 7 or 8 November using the traditional Chinese definition, so it's still in proper autumn if it is done early November.
Given the UK's obsession with weather, I've always regarded the meteorological months as the the most appropriate definition. The unscientific way of defing the first day of summer on midsummer's day is a bit daft anyway.
Surprisingly we tend not to use traditional Chinese seasons in London.Autumn officially ends at about 7 or 8 November using the traditional Chinese definition, so it's still in proper autumn if it is done early November.
The displays were faulty yesterday showing most trains as out of service.Back on topic, I got to the platform Tottenham Court Road to get an eastbound train early yesterday only to discover an indicated 15 minute gap until the next service. A minute later a train pulled in full of passengers and so I boarded, all while the platform screens indicated 'train passing through not in service' or somesuch. Alighted at Liverpool St where the displays again had this message. Anyone else seen this?
The displays were faulty yesterday showing most trains as out of service.
Eek, another use case they left out the specification?? Shouldn’t take more than 18 months to roll out a "station_has_doors" flag in the code.The displays were faulty yesterday showing most trains as out of service.
I noticed at some stations it was advising people "This train is out of service please stay away from the platform edge" which I found a little bizarre considering there are platform edge doors
I don't think so. I was in London on Tuesday so took a detour to ride both ways between Liverpool St and Paddington, as it's a journey I do fairly often.On an other note I reckon journey times from Liverpool Street High Level to Paddington H&C Little Venice exit is just as quick using the Circle Line and H&C. The H&C platforms are closer at both stations - where the long walk to and from Elizabeth line platforms negates the improved travel time. The real difference will come when you can come in from the GEML without changing at Liverpool Street high level. That will be a huge game changer from the GEML side. As will supposedly through running from the west side into the core.
Indeed. On more than one occasion I've waited for more than 15 minutes for a train, and then had to bail onto the deep tube en route due to the journey being so ridiculously slow at times that I've been in serious danger of missing my connection despite the 1 hour connection time allowed for in my itinerary.On the other hand, although in Theory the frequency of Circle line + H&C works out as every five minutes, this is not always the case in reality.
Ditto. I can't think of a reason why I wouldn't use Crossrail for this transfer in future. It's a superb piece of infrastructure, very pleasant to use and far quicker than the alternatives, even if the walk at Liverpool Street is a couple of minutes longer.Same here; Now that Crossrail is open I will never use the Sub Surface route between Paddington and Liverpool St again, ever;
There are dozens of fully automated railways in the world, including several in the USAConcerning auto reverse, I was reading about it here
It does seem to me a bit risky having a train run with no one in the cab watching for e.g. obstructions on the track, issues with points etc. while the driver moves to the other cab.
Do they have say CCTV in these areas so perhaps the control centre or someone can be watching just in case of problems?
It does seem to me a bit risky having a train run with no one in the cab watching for e.g. obstructions on the track, issues with points etc.
I don't see how there's much risk at all. Points have detection built in to ensure they are in the correct position before the train is allowed to move over them. And what's the driver going to do anyway at 125mph and spots an issue with points??Concerning auto reverse, I was reading about it here
It does seem to me a bit risky having a train run with no one in the cab watching for e.g. obstructions on the track, issues with points etc. while the driver moves to the other cab.
Do they have say CCTV in these areas so perhaps the control centre or someone can be watching just in case of problems?
That's true I had forgotten about the DLR. Of course all these systems are primarily elevated or in tunnels which makes the presence of trespassers unlikely.seems to work fine on the DLR and various Metro systems elsewhere in the world, including the JFK airtrain.
Hopefully they are not moving at 125 mph when reversing the trainI don't see how there's much risk at all. Points have detection built in to ensure they are in the correct position before the train is allowed to move over them. And what's the driver going to do anyway at 125mph and spots an issue with points??
The turnback area at Westbourne Park is fairly difficult to get to for a trespasser, although clearly not impossible, the whole rail corridor is in a bit of an enclosed area anyway, but the Crossrail bit is also fully fenced off from the rest of the mainline tracks except for the obvious openings where the running tracks to the GW pass through.That's true I had forgotten about the DLR. Of course all these systems are primarily elevated or in tunnels which makes the presence of trespassers unlikely.
I will still stay with the sub surface line for transfer between Farringdon and Liverpool Street, and possibly between Farringdon and Paddington as well.Ditto. I can't think of a reason why I wouldn't use Crossrail for this transfer in future. It's a superb piece of infrastructure, very pleasant to use and far quicker than the alternatives, even if the walk at Liverpool Street is a couple of minutes longer.
They could empty out some trains at Tottenham Court Road (or Bond Street) and run ECS into Paddington. They did this for an hour during the fire alarm on opening day quite effectively.No, I'm afraid it hasn't been explained to me. If the service suddenly cannot run through the last place that's going to be the critical point would be the three reversing sidings. It's going to be on the westbound Crossrail platform at Paddington, unexpectedly having to tip out whole trainloads every 2.5 minutes - that's not going to happen, and it's a fiction to pretend that it would.
So I guess if all of this is old hat, why are there issues getting the auto reverse to work?
As an athlete I'm sure you can do it quicker than that. Just to confirm the start to stop times from Farringdon to Paddington(Elizabeth Line/Hammersmith & City) are:The minimum connection time of Farringdon is fixed to 8 minutes between Thameslink and Elizabeth line.
I tried to do the connection today following navigation app instructions. However I missed the suggested eastbound train in the app off the southbound train after taking the lift down seeing it depart, with the app suggesting a 2-minute connection between trains.As an athlete I'm sure you can do it quicker than that. Just to confirm the start to stop times from Farringdon to Paddington(Elizabeth Line/Hammersmith & City) are:
Elizabeth Line 7 1/2 minutes
Sub Surface 13 minutes.
Does the extra actual interchange time eat up that 6 minute saving?
No surprises there; I think that's a much more realistic value.The minimum connection time of Farringdon is fixed to 8 minutes between Thameslink and Elizabeth line.
The TfL Board Elizabeth Line committee papers for next weeks meeting are now published
(haven’t yet looked through them as very long), 19 items on the agenda (including the restricted part 2)