4 tph peak but the ORR rejected 2 of the paths off peak.
So that will be available on ORR's webiste then? Have you a link?
4 tph peak but the ORR rejected 2 of the paths off peak.
http://www.rail-reg.gov.uk/server/show/ConWebDoc.9250So that will be available on ORR's webiste then? Have you a link?
However a couple of years after Thameslink KO2 is running, won't Thameslink to Crossrail interchanges at Farringdon make many current train/tube journeys redundant - they are planning for Farringdon to be heaving with interchanges all day? For a whole load of passengers off the GN, and all those additional service from SN and SE origins, Farringdon could easily become their preferred 'London Terminus' for transfer onto Crossrail for both its own stations and onward transfer from Liverpool St or Paddington.
I'd also expect the new Blackfriars south bank entrance to popularise the station for tourists, and the improved Blackfriars underground station will possibly change travel patterns slightly when it reopens this December.
I expect a lot from north of London will transfer onto Crossrail and a small element of tourist traffic - but there are no big tourist generators on the route like Oxford Street.
From the south for Canary Wharf you would get off at London Bridge and use the Jubilee and for the City you would do the same and walk or use the Northern.
The one genuine busy use of the Farringdon interchange from the South is for Heathrow which will create traffic but not enough to create Central Line type overcrowding.
Another point is that why woudlbusiness people arriving at Heathrow want to pay a lot of money to travel on HEX t o paddington then pay again to get a crossrail service to the city when they could just get a crossrail service, which probably wouldnt take any longer if you consider the time taken to get from the HEX to crossrail and possibly get another tickets etc
Or perhaps TfL can place a compulsary purchase order on the tunnels?
Or just threaten to remove all available paths from Heathrow Express if they refuse to cooperate at a reasonable rate?
And why reduce the Abbey Wood branch to 6 tph from 12 tph as planned?
There's been quite a bit of talk about a western access to Heathrow so passengers don't need to go into Paddington then come back out on the Heathrow Express. In my opinion the best way to use this would be to extend the Heathrow Express/Connect Crossrail trains to Reading after Heathrow, therefore passengers from the west can change at Reading for Heathrow, avoiding the need to run extra trains from the west to Heathrow or add more stops to existing services from the west.
Once crossrail is up and running i would get ride of the Heathrow express completely and use the 4 paths freed up to run some additional services between London Paddington & Reading particulary during the peaks which should help somewhat with overcrowding.
i would run at least a half hourly semi stopping services from Reading using the relief lines if a western link to Heathrow airport is built with trains serving Maidenhead, Slough etc.
I don't think through services would be appropriate via Heathrow, it would take just too long. Using some of the paths from services dropping into Heathrow from Paddington to run 3 or 4tph Reading - Heathrow would be much more appropriate.
Proberbly be sensible to extend some of these to Oxford, Newbury or even Swindon / Bristol as an all stations service.
I agree about not diverting the high speed services into Heathrow as it will add a lot of time to the journeys.
Could we say extend the Newbury stopper service and 1 stopper from Oxford the have a half hourly service calling at Maidenhead, Slough etc.
By the way do any crosscountry workings still terminate at Reading? if they are fitted with pantograph car's could some of them be extended to Heathrow?
The 1tph from Newbury could be the local stopper that currently terminates at Reading.
XC Into heathrow makes very good sense. If XC gained some IEPs or the 220 and 221 and 222 fleet where electrodieseled and the Bi Mode IEP idea was scrapped, then XC Readings going on to Heathrow would make very nice sense.
Also, would a bi-mode unit be allowed into underground sections like Heathrow? I'd think that even with the diesels idling there would be sufficient exhaust fumes to be an issue.
Don't shoot me - but might XC to Heathrow be a decent compromise for not introducing a Heathrow spur/diversion to HS2?
If 2tph could be pathed towards Birmingham via Reading and Oxford, a lot of people would be able to connect from the South and Southwest into Heathrow. Panto cars would be a must - they could run electric all the way from Oxford to Heathrow by then!
A bi-mode would be on AC only within the Heathrow tunnels, and with the GWML electrified by then a new branch would almost certainly be 25kV as well.
So why would the diesel engines be involved at all?
I'd say that Oxford - Coventry should be first on the XC Network, but the MML needs doing first, and if the MML is done, then Birmingham - Tamworth - Derby makes more sense too.
While I agree that the MML should be done first, however, if there is the usual hiatus after a big electrification scheme, then the sensible action is to do smaller 'fill-in' schemes to keep the electrification team together. To this end, would also suggest Kirkham - Blackpool South.
If there is a sensible plan, MML and Cardiff Valleys are next, but it'll take 5 years after then end of one scheme before another starts...