They have removed the boarding behind the Paddington statue on platform 1 and replaced with wire fence so you can get a good view in now. It's also a lot colder on that side of the station.
https://twitter.com/inpaddington
They have removed the boarding behind the Paddington statue on platform 1 and replaced with wire fence so you can get a good view in now. It's also a lot colder on that side of the station.
They are uplightersWhat are those things hanging from the ceiling in the first picture? They look to me like old-fashioned CCD cameras, but there's clearly a modern dome camera handing above Paddington's head. Are they lighting up the ceiling? It looks like a forest of jagged metal, do they really need so many?
Great news! Thanks for postingWe have been informed that trial running will (should) commence on Monday 10th May. Monday to Thursday next week between 0540 and 2040 with four trains per hour.
The 62mph sounds like metric 100km/h.This was a run made in early December 2020 but without stops at any stations. IIRC maximum speed in the tunnels is 62mph and on the GWML and GEML 90mph. On the line to Abbey Wood it is 62mph.
Yes, all the speed limits are metric based (even if quoted as mph)The 62mph sounds like metric 100km/h.
Is the central section signalling based on metric speed controls like ETCS?
Why does the entrance roundel say Paddington and not Elizabeth Line? You don't see LU roundels outside stations with the station names.
Apparently keeps in line with National Rail station name signs being lowercase.and then the sign above the entrance is in lowercase...
Because as with the rest of Crossrail the whole brand book has been thrown out the window?
Eg I walked past Liverpool Street Crossrail (Broadgate) entrance and the totem just says ‘Elizabeth Line’, which is clearly different to ‘Station Name’,p as is apparently the case at Paddington, and then the sign above the entrance is in lowercase...
The whole thing is a mess.
Bushey fast lines aren't used, so to replace the signs would be a waste of money, I'm fairly sure the DC line platforms have the orange branding in full. Is Stratford managed by GA rather than TfL or is it split? Farringdon having Tube roundels might be because it was easier to have the same symbol on all signs, because TL doesn't really have a logo, or to indicate the interchange to TL passengers.Yeah, I can't figure out TfL's branding standards at the moment.
This roundel has the station name, others say "Elizabeth line"; the GEML fast lines have blue signs with capital letters; Bushey fast lines have white signs; Harrow & Wealdstone have no roundels at all - just white signs with blue writing; Stratford is similar to Harrow & W - but with operator branding; Norwood Junction has LO roundels on all platforms, and Farringdon has tube roundels on the Thameslink platforms. I thought they took signage very seriously...
Farringdon has always had roundels on all platforms because the whole station is LU managed, as did Barbican and Moorgate SSR. You’ll see the exact opposite occur at Wimbledon and Richmond which are entirely TOC managed.Yeah, I can't figure out TfL's branding standards at the moment.
[…]
and Farringdon has tube roundels on the Thameslink platforms. I thought they took signage very seriously...
Understood, but Romford is TfL Rail managed. Yet no roundels on the fast platforms - I just find it curious.Farringdon has always had roundels on all platforms because the whole station is LU managed, as did Barbican and Moorgate SSR. You’ll see the exact opposite occur at Wimbledon and Richmond which are entirely TOC managed.
Bushey fast lines aren't used, so to replace the signs would be a waste of money, I'm fairly sure the DC line platforms have the orange branding in full. Is Stratford managed by GA rather than TfL or is it split? Farringdon having Tube roundels might be because it was easier to have the same symbol on all signs, because TL doesn't really have a logo, or to indicate the interchange to TL passengers.
I think it should have remained "Crossrail" - much more descriptive than "Elizabeth Line".I guess at multi modal and operator stations it's difficult to figure out what the call the new station. The LU station is Paddington Underground Station, the mainline is London Paddington. Paddington Crossrail Station would have worked had Bozo not changed it to the Liz line. Paddington Elizabeth Line Station just doesn't work so maybe they've just gone for plain Paddington in a purple roundel.
It's still a bit of a mish mash overall.
Completely agreeI think it should have remained "Crossrail" - much more descriptive than "Elizabeth Line".
A bit like the Jubilee or Metropolitan lines?I think it should have remained "Crossrail" - much more descriptive than "Elizabeth Line".
The Jubilee line was going to be called the Fleet line until two years before it opened - another case of a more informative name being replaced by a royal one by a Conservative administration.A bit like the Jubilee or Metropolitan lines?
I thought they always said purple roundel signage would not be put in place until the core was fully open.Out west, the TfL managed stations still have white signage with blue text (no roundels), and then you have the GWR managed stations with their own set of signage again. Total branding mess!
3.11 Platform station names
Where platforms serve one network line exclusively the station name should be in the corporate style of that network.
At simple interchanges where platforms serve more than one network, the station name should be in the style of the station owner. At an Underground station with National rail services operating from the same platform, Underground roundels would be displayed as the station name.
Neutral rectangular station names should be used to avoid customer confusion at large interchanges where there are several parallel platforms each serving different rail and TFL networks.
The Jubilee line was going to be called the Fleet line until two years before it opened - another case of a more informative name being replaced by a royal one by a Conservative administration.
Was the Metropolitan Railway ever planned to be called anything different?
These royal names are a bit sticky though. Victoria is now the popular name for that area of London, not just the station and the LU line.Presumably, Victoria station will also be renamed, once the cultural revolution is complete.
Thank you for the details. I wonder, does anyone know if there is a plan to test 24tph or even 30tph at any point so that they can confirm the signalling system can handle the proposed maximum traffic when the line is fully open?As suggested above, trial running did indeed commence this morning with 4tph. This will hopefully then move up to 8tph from June 5th and then 12tph June 17th and onwards.
Off topic, but the DLR does.Oddly we have never had stations/lines named after male monarchs.
These royal names are a bit sticky though. Victoria is now the popular name for that area of London, not just the station and the LU line.
Then there's Southend and Manchester to consider (Nottingham Victoria turned into the Victoria shopping centre when it closed).
The railway long ago had an "Elizabethan" named train (King's Cross-Edinburgh, 1953-63).
Oddly we have never had stations/lines named after male monarchs.
Having had a look at the DLR map, I think they adopted the historic names of the adjacent docks, rather than named directly for the monarch/prince.Off topic, but the DLR does.
It's great news that trial running has started.As suggested above, trial running did indeed commence this morning with 4tph. This will hopefully then move up to 8tph from June 5th and then 12tph June 17th and onwards.