One of the poor design issues of Crossrail is the lack of proper reversing facilities right across the core to handle any disruption to the service. Emergency crossovers seem to be seen as optional extras nowadays, and in any event the old ability to reverse any service efficiently seems to be a lost skill, despite innumerable emergency planning meetings taking up one's diary for months ahead.
Was reminded of this only yesterday when a police incident (actually on the Marylebone line) at Willesden Green apparently led to the suspension of the Jubilee Line for the entire length through to Stratford, it being "too difficult" to arrange a short working point. It really is inappropriate for all the Jubilee's central London usefulness, and the cross-river connections in East London, to be entirely lost because of something that has happened over in Willesden, and surely the same is going to apply to Crossrail.
It's one of the ironies of the Jubilee Line extension that resilience is either not built in to the system or, more accurately, it is too complicated/time-consuming/ much sweat to operate. If the problem had been at Westminster, then a service from Stanmore could operate through Green Park to the two neglected, but useable, platforms at Charing Cross : the problem then would be the Stratford-based drivers and their shifts, I do realise.
The proposition that because an underground line is well-used, then at the slightest hint of problems you throw your hands up and cry 'shut down! shut down!' and let some other line, or, more likely in many cases, some overcrowded series of bus routes, attempt to solve your problem is lamentable
Actually, the problem can be quantified precisely. You have Charing Cross, you have North Greenwich, so turning ser
vices from the west is fine. It's when you need to turn services from the east you have problems (Waterloo, in theory, I believe, but only one train in a blue moon), yet the majority of the trains are crewed from Stratford (?)
Speaking of Moscow, back in the day when I worked for the organisation LT were still being asked to go to Paris and Moscow to give advice to them on their metro systems, which have both been in an almost continuous state of development since the 1950s at least. Maybe TfL should swallow their pride and go ask them for advice now.