Far too much artificial jeopardy.

That's what grates the most for me. They even get the Crossrail staff to use their naff scripted soundbites.

Not as bad as some, though, such as Railroad Alaska or whatever it's called. A new low in terms of crap narration.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,538
The focus was entirely on heavy engineering - no mention of the electrical and electronic installation work, which ran into severe problems in Paddington, I believe. But that is either too contentious - no washing of dirty linen in public- or doesn't make good TV.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
The focus was entirely on heavy engineering - no mention of the electrical and electronic installation work, which ran into severe problems in Paddington, I believe. But that is either too contentious - no washing of dirty linen in public- or doesn't make good TV.

From what I read, there were a variety of reasons for the down-tools at Paddington, including industrial relations and alterations to the design, neither of which would make particularly entertaining TV, I'd say.

http://www.constructionenquirer.com...spends-electrical-work-at-paddington-station/

http://www.constructionenquirer.com/2017/01/19/crossrail-in-chaos-as-me-work-ripped-out/
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Not sure what the steepest gradient is in the Crossrail core, but I doubt that it will be steeper than Thameslink's 1:28.
Modern EMUs can climb almost any gradient on UK mainline tracks with ease, especially if it is subterranean and not subject to poor railhead conditions.

1:32 from Paddington to below the Central line tunnels.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,065
Location
St Albans
1:32 from Paddington to below the Central line tunnels.

Which is peanuts for modern EMUs geared for up to 1m/s² acceleration. In a tunnel, it's even easier where adverse railhead conditions are very unlikely.
 
Last edited:

sarahj

Established Member
Joined
12 Dec 2012
Messages
1,897
Location
Brighton
I take it the May 2017 start came and went?

It was just running the train from Shenfield to Liverpool St, no tunnels. Not yet.*

What got me was the new train, that was a heck of step down from the doors to the platform. Hope the other platforms are not so low. And with that inside, guess not many will be coming all the way in from Maidenhead, or even Reading with them.

*noted on other page, testing still ongoing, so yes, it came and it went.
 
Last edited:

coupwotcoup

Member
Joined
29 Jul 2007
Messages
287
We had always been told at Harold Wood that the new trains would be up
and running to Liverpool Street only come May 2017.

Don't get me wrong, I think it has been a magnificent project, but I'm a big boy
and don't need a safe space on being told they cannot deliver on time.

Just sayin'....
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,767
Location
Nottingham
What got me was the new train, that was a heck of step down from the doors to the platform. Hope the other platforms are not so low.

The platforms on the central section will be set at the unit floor height (about 1.1m) like HEx and the East London Line, but that can't be done where freight trains pass the platform. Not sure if the lengthened platforms at Liverpool Street will be the same height as well.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,977
Location
UK
Having watched both back to back, I have to say the sound effects department did well to make everything sound so realistic... right down to Hollywood style beeping sounds for any flashing lights!

And I swear the guy outside Farringdon awaiting the delivery for the roof was Keith Lemon!
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Is all the infrastructure work complete now? The latest Google Earth/Streetview imagery for some parts of London is a couple of years old now.

I'm hoping it comes out on DVD, I've got the first series on DVD
 

DynamicSpirit

Established Member
Joined
12 Apr 2012
Messages
9,218
Location
SE London
It was just running the train from Shenfield to Liverpool St, no tunnels. Not yet.*

What got me was the new train, that was a heck of step down from the doors to the platform. Hope the other platforms are not so low. And with that inside, guess not many will be coming all the way in from Maidenhead, or even Reading with them.

Yes, the inside got me too. I was thinking, supposedly lovely modern new trains, but - as far as you can tell from those continuous lines of longitudinal seats - apparently zero thought for passenger comfort when it comes to seating design.

I live in Abbey Wood, and if that's what the CrossRail trains are going to be like, I can well see myself mostly continuing to use SouthEastern to get to central London, even if it takes longer and requires an extra change to the underground to get to the Oxford Street area - just so I can sit on a decent (forward or backwards facing) seat.
 
Joined
22 Jun 2013
Messages
610
The 345s will have a mix of transverse and longitudinal seating, there are few central and end carriages which will be all longitudinal due to crowding. This will to all intents and purposes be a tube line in the central section so the interior must be configured for this.
 

coupwotcoup

Member
Joined
29 Jul 2007
Messages
287
Cannot get pic to load but new service began - in part -
from Liverpool Street to Shenfield this morning...

#whynobellsorwhistles
 

coupwotcoup

Member
Joined
29 Jul 2007
Messages
287
Not sure but no.1 daughter is an early bird so around 6am I'm guessing.

It [the train] was on it's way to Shenfield.
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491

camflyer

Member
Joined
13 Feb 2018
Messages
1,171
Series 3 starts Wednesday 13 February 21.00
https://www.bbc.co.uk/programmes/b08ry6fy

"Episode 1 of 2" - two episodes to stretching the definition of a "series" to the limit.

Still looking forward to watching this and see how much of the recent troubles are shown. It seems that the engineering phase was pretty successful with the problems coming from the testing and getting an operational service up an running.
 

alangla

Member
Joined
11 Apr 2018
Messages
1,178
Location
Glasgow
This could turn into one of the BBC's longest running series
It’s going to have to go some to beat “The Silence of the Trams” - that started as a one off show at the Edinburgh festival one year & was still going years later when the tram project went nowhere. I think it actually finished before the first tram ran
 