londontransit
Member
I've compiled a series of pictures showing the Old Oak railway site - the former GWR depot, the temporary Crossrail tunnel segment factory, the construction of the new Elizabeth Line depot, the final Old Oak open day in 2017, the demolition of the GWR depot, and the beginnings of the new HS2 station site. There's also scenes of track construction and building work and a bit about the canal too. There's been a lot of changes and the post illustrates how things have progressed over a decade or so.
Crossrail - The Old Oak scene.
Crossrail - The Old Oak scene.