swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,241
As all the remaining SWT Stock after opening would be dual voltage capable (i.e. 455/456s retired or 456 on the Ascot Shuttle etc for a bit longer) some branches might be converted to OHLE on CR2 opening while others might remain 3rd rail for a long time i.e. Twickenham?
IIRC there are proposals that CR2 would run as far as Twickenham and terminate, which ought to be possible with a dedicated platform, and presumably splitting the current Kingston loop service. They'd also have to decide whether or not to maintain a service to Shepperton via Twickenham. But nothing insurmountable really.