Can any website member clarify what this entity actually is, and if it has any seats on any official transport bodies?


CrossNorth Programme is an alternate take on the IRP’s integration of Northern Powerhouse Rail and High Speed Two, proposing a new city centre tunnel through Central Manchester for use by east-west rail services throughout the North.

CrossNorth Programme sets out to achieve a ‘poly-centric powerhouse’ across the North, by introducing four new underground city centre stations in Manchester located at Manchester Piccadilly, Manchester Central, Salford Interchange and Salford Quays.

To learn more about the CrossNorth Programme scheme, visit the CrossNorth Programme Twitter page @CrossNorthPr.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,173
Location
West Yorkshire / Birmingham
I'm not convinced on this being anything legitimate, all it seems to be is a verified Twitter account, verification seemingly being something anyone can get since Mr Musk took over!
 

BJames

Established Member
Joined
27 Jan 2018
Messages
1,463
I'm not convinced on this being anything legitimate, all it seems to be is a verified Twitter account, verification seemingly being something anyone can get since Mr Musk took over!
Indeed it is verified because it is subscribed to Twitter Blue (i.e. the paid premium subscription service that gives the same blue tick as some actual famous or relevant accounts), not because it is notable. (For anyone interested, you can check this now by clicking on the blue tick and it will tell you whether it is a subscription or because it is a notable account.) Their account can be found here: https://twitter.com/crossnorthpr

This is the first I've heard of this programme and would be very interested to hear if anyone does know anything about it.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
My impression is that it is fundamentally a one-man effort. On these forums the discussion has mainly been in this thread since late November.
 

HBP

Member
Joined
5 Jan 2020
Messages
103
Location
Harrogate
It doesn’t look look anything sinister. The founder is probably on here. @GJMarshy on Twitter .

62EDB834-D279-46A6-AFDA-6DAAC5E2E042.png
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Most information has to be pieced together from this thread: https://www.railforums.co.uk/threads/npr-will-it-ever-happen.239090/page-5

His full report is here: https://drive.google.com/file/d/1Hovx47WJCio1fkRN6HegwQN5a_8N7sin/view

It's almost identical to the 14-year-old from Northants who proposes rebuilding the Northampton-Brackley line, a very well-polished report but nothing of substance behind it. Politicians meet with him but nobody's mentioned any money yet.

EDIT: In the interests of fairness, @CrossNorthPr has a right to defend himself.
 
Last edited:

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Can any website member clarify what this entity actually is and if it has any seats on any official transport bodies.
From everything we have seen so far, I think it is fair to say that the proposals for a very expensive sounding CrossNorth project is written entirely with the aid of Crayolas. And that is putting it kindly.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
The project is related to our previous correspondent Mr Burr.

Nothing official about it.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,125
Location
Liverpool
From everything we have seen so far, I think it is fair to say that the proposals for a very expensive sounding CrossNorth project is written entirely with the aid of Crayolas. And that is putting it kindly.
Very nice crayolas though. It's a shame it won't actually amount to anything. The North deserves better than it's getting.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Very nice crayolas though. It's a shame it won't actually amount to anything. The North deserves better than it's getting.
Depends on politics at the time, there was much more support for NPR when the conservatives got a load of seats up north.

Crossrail also had a significant amount of it's cost paid by London itself (~40%)
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,390
Location
A typical commuter-belt part of north-west England
Depends on politics at the time, there was much more support for NPR when the conservatives got a load of seats up north.

Crossrail also had a significant amount of it's cost paid by London itself (~40%)
If the areas covered by the CrossNorth Programme had to cover its costs in the same percentage as London did, where would the finance come from?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
If the areas covered by the CrossNorth Programme had to cover its costs in the same percentage as London did, where would the finance come from?
I'll be brutally honest, I don't think the project is worth the time it would take to consider that answer.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
If the areas covered by the CrossNorth Programme had to cover its costs in the same percentage as London did, where would the finance come from?
(source)

Some of the London businesses agreed to contribute (effectively an extra tax) due to the economic benefits. CrossNorth are saying it'll be around £7bn which is much less than Crossrail but the population of the area is a lot less. Not impossible but you'd need strong support from central government and/or local governments willing to contribute.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,390
Location
A typical commuter-belt part of north-west England
(source)

Some of the London businesses agreed to contribute (effectively an extra tax) due to the economic benefits. CrossNorth are saying it'll be around £7bn which is much less than Crossrail but the population of the area is a lot less. Not impossible but you'd need strong support from central government and/or local governments willing to contribute.
It was where the Local Government area decide to raise the extra finance revenue that worries me.
 

CrossNorthPr

Member
Joined
14 Jun 2022
Messages
37
Location
Manchester
It’s noticeable there’s no constructive criticism so much as pure cynicism here, which is completely understandable. The north has suffered for a long time from a lack of transport investment. Why should anyone consider investing in solving the main bottleneck of the north out? Or at least starting NPR where most of the problem is, at the same time allowing for better utilisation of existing infrastructure for GM Rail etc.

There is a team of us, it’s not a one-man-shop. It’s a small team, but an effective one. Obviously we hope it will succeed, but as with all major infrastructure projects, there’s always a chance it won’t (often a large one)

It’s worth a shot though, with everything we’ve got!

There’s a reason we’re not a registered company, and that’s because voluntary projects never really get anywhere without becoming in-house at some point by some authority. The larger a company, and the more finances/salaries involved, the less keen any such authority will be to take it on.

Will it be taken on? We’ll see. It hinges on what happens with NPR, most likely under the next government.

On crayolas; we like them too thanks! They come after the studies as a means of explaining what can be to many quite a complicated scheme; what benefits will be felt, how it might affect them and what changes it makes to the status quo.

There’ll always be cynicism and most times it’s well placed. There’s no point letting the perfect be the enemy of the good though. Everything starts somewhere, successful or not.

______________________________

Since this thread is here I’m happy to discuss the details of the project and what we’ve done so far. Constructive feedback is more than welcome. I won’t engage if personal attacks on myself or others in the voluntary transport planning area are made though. Proper adult discussions only please, no more shouting “Crayolas!”

I know most in here are good people with a real passion for improving public transport, and I look forward to discussing our plans with you all.

All the best,

George.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
It’s noticeable there’s no constructive criticism so much as pure cynicism here, which is completely understandable. The north has suffered for a long time from a lack of transport investment. Why should anyone consider investing in solving the main bottleneck of the north out? Or at least starting NPR where most of the problem is, at the same time allowing for better utilisation of existing infrastructure for GM Rail etc.
I'd like it to become real, I'm just doubtful of funding. Crossrail can justify its high price tag on the large population.
 

cr767055

Member
Joined
27 Mar 2020
Messages
177
Location
Midlands
It’s noticeable there’s no constructive criticism so much as pure cynicism here, which is completely understandable. The north has suffered for a long time from a lack of transport investment. Why should anyone consider investing in solving the main bottleneck of the north out? Or at least starting NPR where most of the problem is, at the same time allowing for better utilisation of existing infrastructure for GM Rail etc.

There is a team of us, it’s not a one-man-shop. It’s a small team, but an effective one. Obviously we hope it will succeed, but as with all major infrastructure projects, there’s always a chance it won’t (often a large one)

It’s worth a shot though, with everything we’ve got!

There’s a reason we’re not a registered company, and that’s because voluntary projects never really get anywhere without becoming in-house at some point by some authority. The larger a company, and the more finances/salaries involved, the less keen any such authority will be to take it on.

Will it be taken on? We’ll see. It hinges on what happens with NPR, most likely under the next government.

On crayolas; we like them too thanks! They come after the studies as a means of explaining what can be to many quite a complicated scheme; what benefits will be felt, how it might affect them and what changes it makes to the status quo.

There’ll always be cynicism and most times it’s well placed. There’s no point letting the perfect be the enemy of the good though. Everything starts somewhere, successful or not.

______________________________

Since this thread is here I’m happy to discuss the details of the project and what we’ve done so far. Constructive feedback is more than welcome. I won’t engage if personal attacks on myself or others in the voluntary transport planning area are made though. Proper adult discussions only please, no more shouting “Crayolas!”

I know most in here are good people with a real passion for improving public transport, and I look forward to discussing our plans with you all.

All the best,

George.

FYI for the full unedited press release :)

 
Last edited:

CrossNorthPr

Member
Joined
14 Jun 2022
Messages
37
Location
Manchester
I'd like it to become real, I'm just doubtful of funding. Crossrail can justify its high price tag on the large population.

It would definitely be an expensive investment there’s no doubt about that you’re completely on-point there.

Expense is relative though for the population it benefits, this benefits all of GM and provides frequent, reliable and high-capacity connections to northern city regions with a combined population of nearly 8 million.

Also some recent correspondence has suggested tunnelling through Manchester sandstone is actually cheaper than London Clay. The 7b price tag is based on the *actual* cost per mile & station of Crossrail where tunnelling is more expensive.

Since the original CNP report we’ve removed the “Salford Quays” station which by moving Salford Interchange further west (to which is a more constructible site) it can interface with the planned Metrolink line from Salford Crescent to Media City providing a quick and frequent 5min connection.

“Lincoln Square” is now dropped from phase one, with passive provision (platforms and connecting passage only) as it would have to be deep level requiring ATO for stopping accuracy with PSDs that would likely be required in the interests of safety and fire regulations. Assuming new lines are built either side (HS3/NPR whatever it’s called by then) ATO will become a more realistic prospect.

Both Manchester Piccadilly & Salford Interchange are now planned to be of “open box” design which is cheaper, easier to construct and most importantly can handle varying rolling stock (electric only of course) which it would need to in Phase 1 so we can get TPE services etc. into it ASAP whilst (hopefully) the rest of “HS3” is under construction.
 

Attachments

  • 8382E4AD-ECEA-488F-ABF8-18EFB7240387.jpeg
    8382E4AD-ECEA-488F-ABF8-18EFB7240387.jpeg
    152 KB · Views: 82
  • 24346CED-31EF-455E-8BD9-CEEE4674C919.png
    24346CED-31EF-455E-8BD9-CEEE4674C919.png
    198.2 KB · Views: 81

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Expense is relative though for the population it benefits, this benefits all of GM and provides frequent, reliable and high-capacity connections to northern city regions with a combined population of nearly 8 million.
How have you managed to get the 8 million number? Manchester and Liverpool are around 500k and Leeds 800k, of course that missing a lot.
Also some recent correspondence has suggested tunnelling through Manchester sandstone is actually cheaper than London Clay.
London clay isn't nice to tunnel through, Crossrail was also limited by other tube and rail lines under London.
The 7b price tag is based on the *actual* cost per mile & station of Crossrail where tunnelling is more expensive.
Crossrail will also have fixed startup costs, the TBMs are not cheap to buy one off.
Both Manchester Piccadilly & Salford Interchange are now planned to be of “open box” design which is cheaper, easier to construct and most importantly can handle varying rolling stock (electric only of course) which it would need to in Phase 1 so we can get TPE services etc. into it ASAP whilst (hopefully) the rest of “HS3” is under construction.
Nice ideas. Salford Interchange, Picadilly and a tunnel is more reasonable.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
Please take this as constructive criticism:


The 7b price tag is based on the *actual* cost per mile & station of Crossrail where tunnelling is more expensive.

What price basis are you using? Remember that the actual cost of Crossrail stations was incurred over the best part of a decade, starting in 2009. Your actual costs will, I estimate, be getting on for double on a comparative unit rate basis.


Both Manchester Piccadilly & Salford Interchange are now planned to be of “open box” design which is cheaper, easier to construct

Open box is easier (and therefore cheaper) where there is little or nothing in the way of the box. Otherwise it gets rather expensive. Hence why Stratford and Old Oak are open box - brownfield sites on railway land, but Crossrail stations are deep mined, as there’s expensive property on top. Also, for open box stations they still need to be deep enough to give sufficient ground cover for the bored tunnels to reach them. Where abouts are you proposing the open boxes, and what’s in the way? You also have to work out how to get the muck out and the materials in - for Old Oak Common HS2 have built both a conveyor system and a tunnel for spoil removal.

which it would need to in Phase 1 so we can get TPE services etc. into it ASAP whilst (hopefully) the rest of “HS3” is under construction.

This is very optimistic. NPR (I presume that’s what you mean by HS3) has had several years of detailed development behind it. There is simply no way that your proposal would be finished before it. If funded tomorrow, your proposal is about 3 years away from being where Crossrail was in 2005.


Final question, as I’m afraid I haven’t understood the detail, but what are the benefits of this proposal? In terms of extra capacity etc.; and what else must be true to enable these benefits to be realised?

== Doublepost prevention - post automatically merged: ==


London clay isn't nice to tunnel through,

Actually, it is near ideal tunnelling material. Relatively soft, easy to shift, but is relatively impermeable and will not collapse from the cutting face. What you don’t want is anything that involves gravels or running sand.
 
Last edited:

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Actually, it is near ideal tunnelling material. Relatively soft, easy to shift, but is relatively impermeable and will not collapse from the cutting face. What you don’t want is anything that involves gravels or running sand.
Fair enough, I always thought it caused problems with collapsing due it being soft.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,369
Location
East coast of Yorkshire
The proposal for a Manchester tunnel would deal with a lot of issues, as it would take pressure of Castlefield. Will it happen, no, not because the scheme lacks merit, but because there is no money. With the NHS acting as a black hole for money and on the brink of collapse in some areas, HS2 sucking up all available rail funding, and the general economic bleak outlook caused by event outside this country no government will be in a position to consider these sort of schemes, probably for at least a decade.

As to whether HS2 was the right use of funds v a range of smaller scale schemes, thats another thread.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
As for Crayolas I'm pretty sure the route of HS2 was drawn with one!

I'm also pretty sure NPR was born when someone drew a line from HS2 in the East to HS2 in the West using a crayola or its digital equivalent.
 

Arkeeos

Member
Joined
18 May 2022
Messages
293
Location
Nottinghamshire
How have you managed to get the 8 million number? Manchester and Liverpool are around 500k and Leeds 800k, of course that missing a lot.
City populations are a bit weird but I would imagine that the population of the area that this encompasses comes out to about 8million, Greater Manchester is 2.5mil, Liverpool city region is 1.5 million, west yorkshire in total is 2.3mil and then add the various towns.

It honestly seems like a decent idea, I did think when I first saw it on here, why tunnel through all of manchester for the approach when there's room for quadtracking along the chat moss line. but it *appears* thats been changed to that now.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
As for Crayolas I'm pretty sure the route of HS2 was drawn with one!

A tad disingenuous that.

HS2 had several possible routes which would have been drawn out based against meeting certain requirements that the project would have had at the outset.

So, to put it simplistically - it would have been required to link London, Birmingham including Birmingham Airport and then onto the North West.

The difference between the lines drawn on a map by HS2 and the lines drawn on a map by a few 'casual' campaigners is that one has a project defined, usually by central government, with a scope set out and bunch of requirements to meet. They would then offer up several options as to how to meet these requirements. Whereas our friends with their "Cross North" plan (and I use the word "plan" in its loosest possible sense) have come up with a solution to what they perceive to be the problems. They then look to justify their solution by saying which problems it will solve. as somebody who's been managing projects for well over 10 years I can tell you that's completely arse about face as an approach and it means the project never delivers what it should.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
As for Crayolas I'm pretty sure the route of HS2 was drawn with one!
The route of HS2 was, as mentioned, draw to meet the requirements for High-Speed running linking London, Birmingham, Manchester and the rest of the network.
I'm also pretty sure NPR was born when someone drew a line from HS2 in the East to HS2 in the West using a crayola or its digital equivalent.
NPR was born when George Osborne observed that connectivity between one of the 3 densest belts of urban areas in the country had much poorer connectivity between themselves and that if this could be improved then a large number of people would have far better socio-economic prospects. HS2 from East to West connectivity is given by the HS2s then-proposed Y network.
 

CrossNorthPr

Member
Joined
14 Jun 2022
Messages
37
Location
Manchester
City populations are a bit weird but I would imagine that the population of the area that this encompasses comes out to about 8million, Greater Manchester is 2.5mil, Liverpool city region is 1.5 million, west yorkshire in total is 2.3mil and then add the various towns.

It honestly seems like a decent idea, I did think when I first saw it on here, why tunnel through all of manchester for the approach when there's room for quadtracking along the chat moss line. but it *appears* thats been changed to that now.

You’ve hit on an interesting point there about population who benefits. One of the difficult things with any transport project is determining exactly how many people stand to benefit. The reality is of course you can’t accurately measure it, but you can model for example the number of people who stand to use both a) the new infrastructure itself and b) the positive externalities it creates.

With something like CNP, the figure if 8 million is picked from the city regions and towns the network would serve, which is essentially the conurbations you mentioned and the nearby towns.

In LCR, GM and WY, most people are within 30 minutes of accessing the “intercity” style trains the programme is designed to serve. In the case of Phase One through Manchester, that enables a much more frequent metro-style service on existing lines. Whilst the population remains the same, the service levels within GM and its hinterlands will increase. Long-term we can expect further increases in population density along those corridors as they become more attractive to property developers and of course the desire to live there by potential residents who as of now, would prefer say Wilmslow or Stockport over Gatley or Mauldeth Road which see very low frequencies into the city centre due to the line being used to send almost empty intercity trains from Piccadilly to the Airport to terminate.

One thing we did in the initial analysis was where the biggest problems were, and what interventions would be required to solve them. Starting from the “do nothing” scenario all the way to things like new routing options to give Victoria better access to South Manchester (following on from and using the Recovery Taskforce options as a baseline) grade separated junctions, Metrolink conversions and even as far as monorails or as little as cycling lanes. We looked at:

-What is the problem?
-What are the conditional outputs?
-What solutions meet those targets?

Then model various options to see what performs the best all options considered. It is from there that the original concept was born, and from where it evolved to what we have now.

An example of one of the options looked at is this one, which was based on better connecting Victoria to the south and using that for intercity E-W services removing flat junctions and congestion on castlefield. Find it attached along with what we have now “Option B+”

You can see the positives of this option, but also the notable downsides that failed to meet the main conditional outputs which fall under: operational, economic and political.

Of course the next step is to commission an “in-house” study by a governmental department or local transport authority I.e TfGM. At the moment as has been stated the focus is very much on other priorities at the moment, and so commissioning such a study using public sector money seems unlikely any time soon, but is most definitely not off the table should there be an alternative required for NPR following it’s poor progression, or as an alternative to the castlefield upgrade programme (which is still a thing) that is beginning to look impossible in its original form now following intense development along the corridor with large buildings and even skyscraper either just built or being built right up against the corridor with no room for the proposed 4-tracking. (That being another option studied)

Hopefully that helps in seeing how we’ve come to the conclusion we have, and the concept as presented today.

George.
 

Attachments

  • 902BF533-2789-43ED-81F5-90357B1A952E.png
    902BF533-2789-43ED-81F5-90357B1A952E.png
    227.8 KB · Views: 81
  • 261A04AD-EA4A-4C79-9D30-9F2558E4F0CC.jpeg
    261A04AD-EA4A-4C79-9D30-9F2558E4F0CC.jpeg
    35.3 KB · Views: 80
Status
Not open for further replies.

Top