andy33gmail
Member
As I understand it, the rail franchises effectively divvy out sets of routes/lines to different operators
So let's suppose there was an overwhelming demand for a service between Blackfriars (Thameslink) and Ely (Great Northern / Greater Anglia). This presumably can only be fulfilled by either a tremendous amount of beaurocity, changing the terms of the franchises on the next renewal, or via an open access operator. Probably not the most useful example, but an easy one to describe.
This of course becomes less relevant with Great British Rail ... since eventually all services will be by the same operator
So ... based on the available lines, stock and other real-world constraints. What services could be added ... all sorts of permutations are possible - e.g. main-line services stopping at overground-only stations. Or in some cases overground trains going on sub-surface underground lines
So let's suppose there was an overwhelming demand for a service between Blackfriars (Thameslink) and Ely (Great Northern / Greater Anglia). This presumably can only be fulfilled by either a tremendous amount of beaurocity, changing the terms of the franchises on the next renewal, or via an open access operator. Probably not the most useful example, but an easy one to describe.
This of course becomes less relevant with Great British Rail ... since eventually all services will be by the same operator
So ... based on the available lines, stock and other real-world constraints. What services could be added ... all sorts of permutations are possible - e.g. main-line services stopping at overground-only stations. Or in some cases overground trains going on sub-surface underground lines