Today engineering work taking place between Ely and Peterborough, according to their website no change on Ely - Stansted Airport section however no services running at all. Yet again thus route seems to be treated as an inconvenience by Cross Country. Disruption increased between Ely and Cambridge as a planning error means no electric trains can operate - Greater Anglia is running bi-mode shuttles instead.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HughT

Member
Joined
21 Feb 2018
Messages
147
Location
Cambridge
I definitely saw rail replacement buses at Cambridge yesterday morning with "Ely" as their destination. Whether that's proof of anything, I don't know...
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,818
Location
East Anglia
I definitely saw rail replacement buses at Cambridge yesterday morning with "Ely" as their destination. Whether that's proof of anything, I don't know...
Yesterday Cambridge to Ely was blocked whereas today it’s routes north of Ely.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,698
Location
UK
Yesterday Cambridge to Ely was blocked whereas today it’s routes north of Ely.
Cambridge to Ely is still blocked to electric traction with 720s terminating at Cambridge instead.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,818
Location
East Anglia
Cambridge to Ely is still blocked to electric traction with 720s terminating at Cambridge instead.
Yes that seems to be a late thing with the changes appearing on journey check. Was it a planning error?
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,698
Location
UK
Yes that seems to be a late thing with the changes appearing on journey check. Was it a planning error?
Unsure, not really my territory. OP did say it was a planning error though so I would assume so.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,950
Location
London
Yes that seems to be a late thing with the changes appearing on journey check. Was it a planning error?

If the changes are appearing on journey check that would suggest that it’s not part of the STP as the timetable for the day has been loaded and is having to be amended accordingly. This suggests either a) a planning error, or b) additional/emergency engineering works.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,698
Location
UK
Praise the Lord for the fabulous class 755 fleet :wub:
I don't think I've heard a single bad thing about them from any train crew. Certainly much better than anything they replaced.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,773
Location
Newport
according to their website no change on Ely - Stansted Airport section however no services running at all. Yet again thus route seems to be treated as an inconvenience by Cross Country.
Users of services to their other inconvenient outpost, Cardiff, will empathise.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,818
Location
East Anglia
Today engineering work taking place between Ely and Peterborough, according to their website no change on Ely - Stansted Airport section however no services running at all. Yet again thus route seems to be treated as an inconvenience by Cross Country. Disruption increased between Ely and Cambridge as a planning error means no electric trains can operate - Greater Anglia is running bi-mode shuttles instead.
Not even GA were operating Cambridge to Stansted so apart from a Cambridge-Ely shuttle there wasn’t much XC could do. There may have been a reason for that as they have operated such in the past.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,945
Location
Ely
It was a fairly unusual set of works, in that Ely-Cambridge was closed Saturday but not (or at least wasn't supposed to be!) on Sunday, which is unique in my recollection.

This did make my travelling Nottingham-Ely on Saturday rather tedious - what would normally have been a 1.5 hour journey was instead over 4 hours, not least because the EMR services didn't connect into the XC/GA buses running from Peterborough at all, arriving a few minutes after they left in each case. And then the XC buses were all going via March rather than some running directly to Ely (which they normally do, and indeed were doing on Sunday), which added more time to the bus journey. It seems that EMR really ought to have been running buses to Ely too, in order to have reasonably-timed connections with their trains. Also irritating was that the alternative of going via Leicester and then XC to Peterborough - where the buses did connect fairly well - wasn't an option due to the MML also being closed.

(As an aside, I do wonder how wise it was to have Gloucester, Stockport, Huddersfield, the MML north of Leicester, and most directions out of Ely, all closed on the same weekend).
 
Joined
26 May 2023
Messages
17
Location
Leeds
Add to that the lack of trains from Leeds and Wakefield over the weekend. There was engineering work between Leeds and York but nothing heading south (at least to Birmingham). I believe it's due to lack of traincrew as was the case the last couple of occasions, but it'd be nice for CrossCountry to be honest about it.
 