Bletchleyite
Veteran Member
And to be fair so doesn’t Chiltern (but apparently has enough to run the EWR)
They have received new units from WMT to run East West Rail, it is not being resourced from their existing fleet.
And to be fair so doesn’t Chiltern (but apparently has enough to run the EWR)
Worcestershire Parkway is doing pretty well, and overwhelmingly with passengers to Birmingham. In that case it's a combination of it not really being an interchange for anywhere very large (it's as easy to change at Birmingham or Cheltenham for Worcester), the fact that it's a new stop and the last thing an 8 hour journey needs is more stops, and the short-distance nature of the passengers.Skipping Wakefield Westgate makes sense, there should be enough capacity between there and Leeds with the LNER and Northern services, plus the additional Northern services from Kirkgate, plus the buses. XC calling there just acts as a "fig leaf" for Northern to continue running 2-car Sprinters on the Sheffield service.
Worcestershire Parkway I don't know enough about, but are there really enough people travelling from there that it overwhelms the XC services?
Not serving Taunton would be a poor move though, unless there's an increase in the GWR services to Bristol. It doesn't really compare with Wakefield where the XC services are doing a job that should be done by the local operator- Taunton is a railhead for large swathes of Somerset & North Devon. If XC stopped calling at Wakefield people will change at Leeds instead. If they stop calling at Taunton people will get on the M5.
Bristol to Taunton isn't really comparable with Leeds to Wakefield though- it's near enough 50 miles between the two places. It would make sense for there to be a more usable GWR stopper on the route, but until there is you can't really begrudge passengers for preferring the faster service.Taunton isn't somewhere you want to stop calling. The aim is to stop having to deal with Bristol-Taunton passengers, which can probably be better achieved with a combination of GWR-only tickets and raising the price of the open tickets.
I don't begrudge anybody preferring the faster service - I'd always catch it myself if it was available and the same price. The problem is that 50 miles is still a pretty short low-value journey when it's taking seats away from passengers who are going 400 miles or more. You do need to improve the GWR service, if nothing else because I'm not sure all the Taunton passengers would fit on it.Bristol to Taunton isn't really comparable with Leeds to Wakefield though- it's near enough 50 miles between the two places. It would make sense for there to be a more usable GWR stopper on the route, but until there is you can't really begrudge passengers for preferring the faster service.
Bristol to Taunton isn't really comparable with Leeds to Wakefield though- it's near enough 50 miles between the two places. It would make sense for there to be a more usable GWR stopper on the route, but until there is you can't really begrudge passengers for preferring the faster service.
XC do Taunton-Bristol in 30-32 minutes; the GWR stopper is about 59-70 minutes depending on calling pattern and dwell time. That is an enormous difference in journey time and for all XC's problems, getting them to skip Taunton all of a sudden will cause outrage. If you want Taunton to be skipped, XC need to be 2tph down to Exeter, where 1tph can skip Taunton and maybe also Tiverton Pkwy, and GWR need an additional tph between Bristol and Exeter that is at least semi-fast - such as Bristol, Weston-super-Mare, Bridgwater, Taunton, Tiverton (or Wellington and Cullompton instead of here), Exeter.Taunton isn't somewhere you want to stop calling. The aim is to stop having to deal with Bristol-Taunton passengers, which can probably be better achieved with a combination of GWR-only tickets and raising the price of the open tickets.
That cuts to the heart of the issue of using XC to provide core services, rather than act as a long distance overlay. However, I'm not sure that dropping Taunton because it's used by people travelling from Bristol (and Exeter) is the right answer when it's also a railhead for a large area.I don't begrudge anybody preferring the faster service - I'd always catch it myself if it was available and the same price. The problem is that 50 miles is still a pretty short low-value journey when it's taking seats away from passengers who are going 400 miles or more. You do need to improve the GWR service, if nothing else because I'm not sure all the Taunton passengers would fit on it.
What percentage of passengers are travelling over 400 miles? Less than 0.5%?That cuts to the heart of the issue of using XC to provide core services, rather than act as a long distance overlay. However, I'm not sure that dropping Taunton because it's used by people travelling from Bristol (and Exeter) is the right answer when it's also a railhead for a large area.
The floor of this argument is that if we were a more sensible efficiency-focused country like The Netherlands, Switzerland, Germany etc all of the core CrossCountry routes would have been electrified long ago and we wouldn't have to argue about how to replace/supplement highly specialised, thirsty and hard to come by diesel high speed trains. Almost all cross-country style routes in Germany, the best point of comparison operate with 16 carriage ICE 3s or 12/13 carriage ICE 4s. The only unnelectrified railways in the Netherlands and Germany are comparatively rural branch lines. The only Voyager route where the case for electrification is fairly weak is running beyond Plymouth to Penzance.
For all the floors of the CrossCountry's offerings, its great strength is its long distance service offering, providing 2tph from Birmingham to most principle destinations and 1tph to places further a field whilst catering well to cross-Birmingham passengers. It is almost singlehandedly responsible for the growth of passenger numbers that has proven the Voyagers to be inadequate and strengthened the case to electrify all their core routes and order a fleet of conventional 125mph EMUs. For me messing around with the one great virtue of CrossCountry is a dangerous game and we must not lose track of how valuable it is.
For all the strengths of the Dutch railways and its operating model it is not without flaws, especially in regards to long distance services. The only routes that pass through the Netherlands that are as long as the four Voyager routes are international services and they are plagued with the same problems of overcrowding, high ticket prices and unreliability that the Voyager routes see.
Good value for the taxpayer is important, but that doesn't mean making the railway cheap, it means making it more effective as well as financially affordable. The criteria for that are for some debate, perhaps another thread would be good on that.
Breaking services where the wires end on mainline services (this isn't Merseyrail) isn't driving things by core markets, it's driving things by operational convenience. Operational convenience should never be the primary driver.
Over 400 miles - quite possibly. But my suggestion is that the purpose of a Taunton stop is rather more than just serving as a commuter stop for Bristol, which is where the "don't stop XC at Taunton" approach seemed to come from.What percentage of passengers are travelling over 400 miles? Less than 0.5%?
It could, but that rather neglects the way that the services north and south of Northampton dovetail with each other. Which kind of matters when you're not actually taking anything out of New St, and there's no credible suggestion that this is a particularly contributor to service unreliability.There is a choice between Northampton and Birmingham for terminating services. Birmingham is the far more capacity / performance destroying one.
All Eindhoven - Utrecht trains go to Amsterdam. Passengers for Den Haag and Amersfoort change trains at Utrecht. They don't try running 1tph to everywhere. That model could work well for Birmingham.
As has been said upthread it is complex, but getting the best outcome for the country out of what we have to work with is the core job of the public sector, and I am thankful that the straightjacket of franchise "contracts" should soon be behind us. It's a pity about the rolling stock ones.Good value for the taxpayer (and the fare payer) means using existing resources effectively and making cost decisions
There is a choice between Northampton and Birmingham for terminating services. Birmingham is the far more capacity / performance destroying one.
All Eindhoven - Utrecht trains go to Amsterdam. Passengers for Den Haag and Amersfoort change trains at Utrecht. They don't try running 1tph to everywhere. That model could work well for Birmingham.
There are too many sacred cows that various people want to protect, and this just leads to a total decision paralysis. You can't make omelettes if all eggs are sacred.
Over 400 miles - quite possibly. But my suggestion is that the purpose of a Taunton stop is rather more than just serving as a commuter stop for Bristol, which is where the "don't stop XC at Taunton" approach seemed to come from.
== Doublepost prevention - post automatically merged: ==
It could, but that rather neglects the way that the services north and south of Northampton dovetail with each other. Which kind of matters when you're not actually taking anything out of New St, and there's no credible suggestion that this is a particularly contributor to service unreliability.
As has been said upthread it is complex, but getting the best outcome for the country out of what we have to work with is the core job of the public sector, and I am thankful that the straightjacket of franchise "contracts" should soon be behind us. It's a pity about the rolling stock ones.
On top of the NE-SW capacity problem what has hardly has any mention here is the need to get diesels out of conurbations and smaller towns too because of the health consequences of continuing emissions. This is why I feel that re-using servicable EMUs to displace Voyagers from Manchester and Brum in the short term is a no-brainer, although admittedly losing through trains from Manc to the S and SW is unfortunate. In the longer term running new bi-mode or BEMUs will re-connect this route. In the meantime cross-platform interchange off an 8-car EMU at Bham international or Coventry (whether on its way to Northampton or not) into a 9-car Voyager would be the least-worst option that I can see.
The "cost" (i.e. practicability) of traction training of XC or route-training of LNR drivers should be analysed and the result used to decide which way to go in the short term.
At the moment the long dwell at Northampton (c.10 mins) functions as an effective service break anyway. However it has the advantage of forming a West Mids - MK stopping service by maintaining the through advertisment.The Northampton dovetail can be preserved through maintaining interchange times by planning Northampton as a takt node, which for the frequency of trains would not be difficult.
At the moment the long dwell at Northampton (c.10 mins) functions as an effective service break anyway. However it has the advantage of forming a West Mids - MK stopping service by maintaining the through advertisment.
The two halves of this service need to be half-hourly minimum. The provision of an MK area stopper to the West Mids is also important, although there is an argument that it could be split for 1 half of the hour I would suggest that breaking it outright is not productive. In addition this service forms the only direct services from the intermediate stations between Birmingham International and Coventry, and Long Buckby, to Euston. Reducing or removing these direct links to force change at Coventry or Northampton would lead to a material drop in ridership, especially when the Avanti services are already so heavily used.
Northampton cannot function as a takt node in the Dutch model for the wider rail network because it is bypassed by the fast lines. You would need that role to be taken on by MK (which has limited platform capacity for terminating too many trains at once), or Rugby (which has a restrictive layout for terminating services from Coventry).
Good value for the taxpayer (and the fare payer) means using existing resources effectively and making cost decisions based on what actually drives revenue.
There are so many ways of providing cheaper fares on London - Birmingham. Only non-takt countries like France and Poland think segmentation with 'poor trains' is a good idea. Through Northampton services don't drive revenue.
There are too many sacred cows that various people want to protect, and this just leads to a total decision paralysis. You can't make omelettes if all eggs are sacred.
It is complex, and any remapping of this kind will have to be supported by a systematic timetable recast to a takt-kind quality applying Dutch principles (not impossible, but it won't be trivial), and some trade-offs will need to be made. The state of the industry and the absence of any political courage probably means such an exercise won't be completed or even attempted this side of 2035, and we are left with plodding along with current mediocrity.
That cuts to the heart of the issue of using XC to provide core services, rather than act as a long distance overlay.
This same issue is appearing in multiple threads, so here is what I posted earlier in the 350/2 thread. That is the challenge with letting EMUs run the Manchester.Could you build a reversing siding near Soho?
If so then the voyagers from Bristol/Bournemouth have somewhere to reverse without clogging the platforms. Because of the reversals at Birmingham they already cross the formation anyway
That leaves you with the Manchester 350s to turn around. Whilst I can see the sense in Northampton, I would see if Rugby could work. It looks like Platforms 1 and 2 can be used, with 1 being the best. There is also platform 6. Coventry could also make sense.
Also looking at a standard hour arrivals:
xx:18 from Reading
xx:24 from Bristol*
xx:27 from Leeds
xx:51 from Bournemouth*
Departures
xx: 03 to Bournemouth*
xx: 28 to Leeds
xx: 33 to Reading
xx: 42 to Bristol Temple Meads*
* denotes a Manchester train.
So match as follows
xx:18 forms xx:33 (15 minutes reversal)
xx:24 form xx:28 to Leeds
xx:27 from Leeds now goes as xx:42 to Bristol
xx:51 from Bournemouth forms xx:03 to Bournemouth (12 minutes reversal)
Or:
xx:18 from Reading forms the xx:28 to Leeds (As now)
xx:24 from Bristol forms xx:42 to Bristol (18 minutes reversal)
xx:27 from Leeds for xx:33 to Reading (As now)
xx:51 from Bournemouth forms xx:03 to Bournemouth (12 minutes reversal)
It reall is just that Bournemouth pair that cause the issues.
Manchester's are:
33 and 56 arrivals
01 and 30 departures
So to run a 350-based Manchester service needs a dedicated platform at New Street, or requires the trains to go further East.
3. Yes, that probably means an end to the many £9/11/12 tickets for London - Birmingham (based on fares for Wednesday morning - https://www.thetrainline.com/book/results?origin=urn:trainline:generic:loc:182gb&destination=urn:trainline:generic:loc:13gb&outwardDate=2026-01-07T00:00:00&outwardDateType=departAfter&journeySearchType=single&passengers[]=1991-01-05&directSearch=false&splitSave=true&transportModes[]=mixed&temporalDirection=next&transitDefinitionDirection=outward&paginationPriceDisplayed=false&searchId=7012cba0-49cf-48f3-91ce-f7c57edd4519 - but whilst we have lots of passengers struggling with the "fun sized" diesel services between Manchester and Birmingham - on which few 'cheap' tickets exist - it seems ridiculous to waste so many resources on three competing London - Birmingham services.
Even just Top and Tail 67's or 68's would be good. There are a considerable amount of 67s in storage which I presume could be easily reactivated , and as they're built for 125 MPH passenger work minimal or no modification to them should be required.Top and tail class 99s with 'dumb' trailers would be good with a good fit out.
The Class 67 was not particularly successful, which is why they are a lot of them stored.Even just Top and Tail 67's or 68's would be good. There are a considerable amount of 67s in storage which I presume could be easily reactivated , and as they're built for 125 MPH passenger work minimal or no modification to them should be required.
All that's needed is somebody to come along and build a new lot of modern coaches.
I don't begrudge anybody preferring the faster service - I'd always catch it myself if it was available and the same price. The problem is that 50 miles is still a pretty short low-value journey when it's taking seats away from passengers who are going 400 miles or more. You do need to improve the GWR service, if nothing else because I'm not sure all the Taunton passengers would fit on it.
This is simply untrue. In Germany, a Takt country, it's provided by way of regional services being very cheap, particularly with the Deutschlandticket but even before that with stuff like the Schoenes-Wochenende-Ticket. For years it's been common for less well-off people to make long journeys on regional services because it's cheap, while the ICE is excellent but pricey. It is directly analogous to Avanti vs. WMT on the WCML - the situation with the "cheap and fast vs. expensive and slow" thing is a near textbook copy. Plus Germany has Flixtrain, which is a low frequency budget Open Access operator sort of analogous to Lumo.
What is your evidence for this? It is a repeated assertion with no grounding, and, even if it is true, applies elsewhere too.They do a lot to keep people out of old, polluting cars, far more than Avanti which is much more likely to be chosen by someone driving a modern ULEZ compliant ICE car or an EV.