Cross Country Cancellations - Emergency Timetable

Status
Not open for further replies.

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,701
Location
West Riding
It’s a real shame that the problem has been allowed to get this far with what seems like no intervention, the reliability of services has been dire for sometime but nothing seems to be done about it, and their answer is to cut more services during one of the busiest times of the year for rail travel, Management/DfT/someone should really have been looking at this to prevent it happening.
Totally agree, but it's been like this for years now. Do we think this Emergency Timetable is a bit of a plea for extra resources from the DFT? All these TOC's having problems, are the same ones that have been having issues for years, it's the underlying distribution (or lack altogether) of resources that needs addressing. It's a real shame as with how packed the trains are on XC, if they actually ran longer trains and a reliable service, there seems to be a good platform for some strong growth.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Alfie1014

Established Member
Joined
27 Jun 2012
Messages
1,205
Location
Essex
On weekdays from August 12th to the 16th, the Newcastle - Reading diagrams are...

08:35 Newcastle to Reading.
14:45 Reading to York.

15:33 Birmingham New Street to Reading.
17:45 Reading to Newcastle.
But the 17:15 off Reading is missing it only runs Bournemouth to Eastleigh, so that creates a 90 minute gap at Reading for departures towards Birmingham between 16:15 to 17:45!
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,796
Location
West of Andover
But the 17:15 off Reading is missing it only runs Bournemouth to Eastleigh, so that creates a 90 minute gap at Reading for departures towards Birmingham between 16:15 to 17:45!
And I wouldn't want to be at Oxford when that 17:45 from Reading rocks up. At least for Banbury there is a stopper which runs between the missing Manchester XC & the Newcastle but that doesn't help passengers for Leamington & beyond
 

XC victim

Member
Joined
16 Dec 2015
Messages
174
And I wouldn't want to be at Oxford when that 17:45 from Reading rocks up. At least for Banbury there is a stopper which runs between the missing Manchester XC & the Newcastle but that doesn't help passengers for Leamington & beyond
Doesn’t help passengers to Coventry either
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,796
Location
West of Andover
Doesn’t help passengers to Coventry either
Which was covered with the "& beyond".

No doubt that the 17:45 Reading to Newcastle will be a single 220 for extra comfort. Especially as the GWR service which would follow the 17;15 Manchester skips Reading so the 17:45 will also get extra passengers for Oxford.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,999
Location
UK
If ever a train operator screamed “in the name of god please put us out of our misery”, it’s Crosscountry. Utterly unfit for purpose for a generation now, and getting worse. For heaven’s sake someone just pull the plug!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
If ever a train operator screamed “in the name of god please put us out of our misery”, it’s Crosscountry. Utterly unfit for purpose for a generation now, and getting worse. For heaven’s sake someone just pull the plug!
And do what with it? There isn't an overnight solution.
 

BanburyBlue

Member
Joined
18 May 2015
Messages
878
I thought things were improving, with some of the Reading/Newcastle's back, and talk of a near back to normal next spring, but obviously not.

So what will happen on the 10 November? Was the 9th November a date pulled out of the hat, or do we think there is a grand plan to get back to normal then?
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,957
Location
York
And do what with it? There isn't an overnight solution.
Unfortunately not. But how has the all-interfering DfT over a decade allowed things to get to this state? Who does look out for the interests of the ultimate customers, the passengers?
 

nw1

Established Member
Joined
9 Aug 2013
Messages
9,430
Cross-Country really have fallen from grace since the good old days of the 1980s or even early Virgin.

It seems to have been one disaster after another over the past few years, and even before that, they were prone to horrendous overcrowding at certain times of the week.

Whether it's XC themselves or the (former Tory) government to blame, I'm not entirely sure.

I presume they will double-up the Bournemouth-Manchester services between Reading and Birmingham?

God help anyone trying to do this route if not. I suspect you'll get a lot of people going via London instead and using the WCML or Chiltern.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
Unfortunately not. But how has the all-interfering DfT over a decade allowed things to get to this state? Who does look out for the interests of the ultimate customers, the passengers?
Its not all a DfT issue.
 

nw1

Established Member
Joined
9 Aug 2013
Messages
9,430
But the 17:15 off Reading is missing it only runs Bournemouth to Eastleigh, so that creates a 90 minute gap at Reading for departures towards Birmingham between 16:15 to 17:45!

Why is that, engineering works?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
Cross-Country really have fallen from grace since the good old days of the 1980s or even early Virgin.

It seems to have been one disaster after another over the past few years, and even before that, they were prone to horrendous overcrowding at certain times of the week.
If ever a train operator screamed “in the name of god please put us out of our misery”, it’s Crosscountry. Utterly unfit for purpose for a generation now, and getting worse. For heaven’s sake someone just pull the plug!

Even ORR data shows how they have nosedived

Passenger train km 2019-20 was 32.8m
2023-24 had fallen to a mere 23.3m. Dropped 29%

On time (or within a minute) under 50% at lowly 47.2%
Cancellation 8.4% (1 in 12 trains fail to run)

Trains planned down 20% from 101,848 in 2019/20 to just 80,882 in 2023/24 (of which only about 73,000 actually ran allowing for cancellations (so about 27% less services)


Personally I am baffled how an organisation can lose 27% of its operations in 4 years, and then claim to have shortage of trained staff when its headcount has dropped only 5% from 1983 to 1880
 

louis97

Established Member
Joined
14 May 2008
Messages
2,153
Location
Derby
I thought things were improving, with some of the Reading/Newcastle's back, and talk of a near back to normal next spring, but obviously not.
If the letter to stakeholders is true this isn't removal of services because they couldn't run them (although honestly they were always the first to be cancelled when there wasn't enough crew). It is to allow training to be sped up to enable a more reliable service sooner than if the services remained in the timetable.

I suspect the timing of the reinstatement is to coincide with the Birmingham Christmas Markets getting into full swing, they start a week ish earlier.
 

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,754
Location
Up North
The 1745 ex-Reading (1927 from New Street) is usually rammed beyond belief on departure from Birmingham so I'm glad they've at least kept that.

It is however, without fail, usually a four-car 220, so this might make for similarly cramped conditions south of Birmingham.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,014
Location
Surrey
If ever a train operator screamed “in the name of god please put us out of our misery”, it’s Crosscountry. Utterly unfit for purpose for a generation now, and getting worse. For heaven’s sake someone just pull the plug!
Absolutely but every MP just whinges on about Avanti being the bad boys
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,796
Location
West of Andover
Absolutely but every MP just whinges on about Avanti being the bad boys
The key different is that Avanti serve London and XC don't ;)

Just look at the media reports from a few weeks ago with the kickball final, only got mentioned as South Eastern had cancelled some trains (which was a tiny percentage compared to Northern)
 

Martin_1981

Member
Joined
15 Jul 2011
Messages
274
Still no guarantee that the cancelled services will be reinstated in November. I guess it will be reviewed on a weekly, or at least monthly basis. They will save a lot of money in not having to pay out as much in compensation for cancelled trains.
 

nw1

Established Member
Joined
9 Aug 2013
Messages
9,430
Unlikely. I would assume they can't crew it North of Eastleigh.

Seems just about no point in running it from Bournemouth to Eastleigh at all in that case, to be quite honest.
 

Deafdoggie

Established Member
Joined
29 Sep 2016
Messages
3,414
Unfortunately not. But how has the all-interfering DfT over a decade allowed things to get to this state? Who does look out for the interests of the ultimate customers, the passengers?
The DfT argue they are looking after the tax-payer interests. It all boils down to who you think should pay for the railways? Those that use them or those that don't?

Obviously those that use the trains say everyone should pay & those that don't say only those that use them should pay.

Whatever the rights and wrongs of both sides, the railway has got to get a grip (like any business) on its costs.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,283
Seems just about no point in running it from Bournemouth to Eastleigh at all in that case, to be quite honest.
It’s going to need to run to Eastleigh even if it runs empty, as that’s the overnight depot.
 

vicbury

Member
Joined
17 Mar 2012
Messages
1,052
Location
Lydney
Even ORR data shows how they have nosedived

Passenger train km 2019-20 was 32.8m
2023-24 had fallen to a mere 23.3m. Dropped 29%

On time (or within a minute) under 50% at lowly 47.2%
Cancellation 8.4% (1 in 12 trains fail to run)

Trains planned down 20% from 101,848 in 2019/20 to just 80,882 in 2023/24 (of which only about 73,000 actually ran allowing for cancellations (so about 27% less services)


Personally I am baffled how an organisation can lose 27% of its operations in 4 years, and then claim to have shortage of trained staff when its headcount has dropped only 5% from 1983 to 1880
Does that cancellation rate account for services that terminate early? I'd suggest the rate of Nottingham - Cardiff services that fail to run between Birmingham / Gloucester and Cardiff is far higher than 8%.
 

Tazi Hupefi

On Moderation
Joined
1 Apr 2018
Messages
1,838
Location
Nottinghamshire
I remember being in a meeting several years ago (pre COVID) with all and sundry from the DfT, amongst other departments, where they had an idea about abolishing the XC franchise completely and improving some of the other franchised routes, given that there are almost always alternative services available. Turbostar routes would have been amalgamated into the East and West Midlands franchises.

I can't remember if this ever got as far as being mooted in public, but it all got forgotten about fairly quickly, but the resistance was around people wanting to avoid London, even if it meant a longer, slower journey.

In the new world of GBR, I don't think it makes any sense to have XC as a standalone business. Take an Aberdeen to Penzance service, ideally you'd work it with a ScotRail driver from Aberdeen to Edinburgh, LNER through to Leeds/Doncaster, GWR in Devon and Cornwall and so on. Getting rid of all of these depots which are duplicated along with the management structures would make a far more efficient and reliable railway in the long term, with no loss of front line jobs.
 

WAB

Established Member
Joined
27 Jun 2015
Messages
1,298
Location
Anglia
In the new world of GBR, I don't think it makes any sense to have XC as a standalone business. Take an Aberdeen to Penzance service, ideally you'd work it with a ScotRail driver from Aberdeen to Edinburgh, LNER through to Leeds/Doncaster, GWR in Devon and Cornwall and so on. Getting rid of all of these depots which are duplicated along with the management structures would make a far more efficient and reliable railway in the long term, with no loss of front line jobs.
But it still needs people to advocate for the service and promote it, rather than it being the last priority for four different TOUs going their own thing. I do think buying in traincrew and catering would be worthwhile though.
 

nw1

Established Member
Joined
9 Aug 2013
Messages
9,430
Totally agree. The only sensible option is to return to an integrated InterCity. It's what basically every other country does, and British exceptionalism is usually wrong.

Indeed, the ironic thing is that the UK is one of the few European countries to no longer use "InterCity", or translations of the same - even though the name originated in the UK!

The name was good enough for most of Europe to adopt it - but evidently not good enough for our privatised railway! ;)
 