Crewe station P1 roof

Status
Not open for further replies.

Signal Head

Member
Joined
26 May 2013
Messages
460
While passing through Crewe today I spotted that the roof trusses towards the north end of Platform 1 have been propped, and this section of platform blocked off. This is presumably the problem referred to in the recent 'hot weather' thread.

2 of the spans look like they are cast iron beams, so presumably original LNWR, and susceptible to cracks, but the southernmost one is rivetted plates (wrought iron?)
 

Attachments

  • DSC_0448.JPG
    DSC_0448.JPG
    3.8 MB · Views: 340
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Last Tue after lunchtime, the hot weather caused the platform on 6 to actually buckle (Dwayne the Rock Johnson jumped out apparently, see the film). Shortly later, a loud cracking noise was heard by a driver waiting near the coffee hut on P5 who mentioned the pillar next to P1 moved - not inconceivable given the shifting platforms in the heat.
 

david l

Member
Joined
27 Dec 2016
Messages
456
Location
Wigan
Some were running out of Plat 6 last week. However Plat 1 appears to be in use today (but the reversing siding at the n end of 1 shows as blocked)
 

Ediswan

Established Member
Joined
15 Nov 2012
Messages
3,419
Location
Stevenage
Noting that the props are at the ends of the beams, I wonder if it is the connections to the pillars which are suspect, rather than the beams themselves.
 

Signal Head

Member
Joined
26 May 2013
Messages
460
Noting that the props are at the ends of the beams, I wonder if it is the connections to the pillars which are suspect, rather than the beams themselves.
I wondered that myself. There is also propping on the trusses between Up Fast and Up Slow (Platform 5) that's been there a while. All of that is under cast beams. The top end of the columns look very rusty, and possibly cracked. All this was painted during the 1985 remodelling, it doesn't look like it's been maintained much since then.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,613
Location
Crewe
Noting that the props are at the ends of the beams, I wonder if it is the connections to the pillars which are suspect, rather than the beams themselves.
It's the pillars themselves, so if they do fail the props are supporting the ends of the beams.

It's the thicker pillar that is of most concern, it's warped/buckled quite considerably despite its 'chunkiness'
 

Trainfan2019

Member
Joined
9 Aug 2019
Messages
528
I took the photos below of the heat damage when I was back in Crewe last week.

From what I can see in the cordoned off area on platform 1, it looks like at least 1 of the upright columns is now starting to slope. There is definitely some rust at the bottom of the wider upright in the photo but when I zoom in, it looks a lot worse at the top of the red painted section where it meets the girder going across. These uprights were all repainted a few months ago but I think it was only the blue and white parts.

Yes, can confirm as others have said, Northern are using the far end of platform 1. The only access for Northern passengers at the far end of platform 1 is now via platform 3 as the cordoned off area extends along platform 1 to the slope leading to the subway.

IMG_20220721_073653.jpgIMG_20220721_073509.jpg
 

Signal Head

Member
Joined
26 May 2013
Messages
460
This the propped section between the Up lines. I noticed that some of the trusses further south are also of riveted plate, I wondered if these were replacements for the originals after failure. A few of the columns appear to be of a different design, possibly this is strengthening that has been added over the original at some point owing to failure, or some apparent weakeness. I've no idea how old all this stuff is, I don't know much about the development/expansion of Crewe from its original days.
 

Attachments

  • DSC_0449.JPG
    DSC_0449.JPG
    3.8 MB · Views: 113
Last edited:

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,503
Location
London
Would be somewhat symbolic if Crewe is chosen as GBR headquarters and then the roof immediately collapses.
 

M60lad

Established Member
Joined
31 May 2011
Messages
1,565
Considering what's happened at Crewe is there any plans now to fix any of the damage caused as surely they can't leave a platform semi out of use for a lengthy period of time?
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,684
Location
West Riding
I think the maintenance of the roof at Crewe needs a serious rethink. There’s a load of trees growing out of it too! It’s not much of an advert for the railway or town.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
It's a very attractive roof which ought to be properly maintained. Probably be replaced with some modern monstrosity.
 

Trainfan2019

Member
Joined
9 Aug 2019
Messages
528
Agree about the roof maintenance at Crewe. Awful condition in parts where it rains in around platform 1 and 3. Then there's the section of platform 3 where there's the roof with no roof on.
 

Statto

Established Member
Joined
8 Feb 2011
Messages
4,068
Location
At home or at the pub
Is the EMU siding back in use, otherwise they need to repair the damage quickly so the Manchester stopper can access the EMU siding when out of service, as given how long the Manchester stopper lays over at Crewe that can cause issues with other trains.

Another thing, anyone know what's going on with Crewe P10, it's has nogo, on signal diagrams for the last couple of weeks (before the recent heatwave), seen the Chester shuttle arriving 40 minutes late, because waiting for the AWC Voyager on P9 to depart, the Chester shuttle would have gone onto P10 normally?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,662
Is the EMU siding back in use, otherwise they need to repair the damage quickly so the Manchester stopper can access the EMU siding when out of service, as given how long the Manchester stopper lays over at Crewe that can cause issues with other trains.

Another thing, anyone know what's going on with Crewe P10, it's has nogo, on signal diagrams for the last couple of weeks (before the recent heatwave), seen the Chester shuttle arriving 40 minutes late, because waiting for the AWC Voyager on P9 to depart, the Chester shuttle would have gone onto P10 normally?
Knackered set of points I think, waiting for replacement.
 
Joined
7 Jan 2019
Messages
524
Location
North West
The whole station needs a good refurbishment. As well as the obvious repairs mentioned to the roof, platforms, and points at P10.

It really is a bit of a tip now.
 

Signal Head

Member
Joined
26 May 2013
Messages
460
Depends how standard the S&C is.
I believe this was the result of a 'run through' (train running through wrongly-set points in the trailing direction, for those that aren't familiar with the term), which can do all sorts of damage, depending on the type of switch and point operating equipment involved.

The turnout concerned looks like it might be part of a 'tandem lead' (where two turnouts are interleaved), so there are likely to be some non-standard bits in there.
 

Sheridan

Member
Joined
11 Jan 2012
Messages
617
Indeed, (and I realise we’re getting slightly off-topic here), the points are the ones highlighted in the photo attached, with platform ten being the line going off to the left (with the 15mph board and arrow).
 

Attachments

  • DBD0C47E-44B9-4147-8A30-49BF8CAB4EB6.jpeg
    DBD0C47E-44B9-4147-8A30-49BF8CAB4EB6.jpeg
    91.7 KB · Views: 118

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,601
Location
UK
Indeed, (and I realise we’re getting slightly off-topic here), the points are the ones highlighted in the photo attached, with platform ten being the line going off to the left (with the 15mph board and arrow).
Do we know the circumstances surrounding the run-through?
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,613
Location
Crewe
This the propped section between the Up lines. I noticed that some of the trusses further south are also of riveted plate, I wondered if these were replacements for the originals after failure. A few of the columns appear to be of a different design, possibly this is strengthening that has been added over the original at some point owing to failure, or some apparent weakeness. I've no idea how old all this stuff is, I don't know much about the development/expansion of Crewe from its original days.
Those pillars have been supported for a little while now, think last Spring time. It's all very old and asset management have decided to not look into replacing at this point in time. Presumably they are looking at HS2 funding to help

== Doublepost prevention - post automatically merged: ==

I took the photos below of the heat damage when I was back in Crewe last week.

From what I can see in the cordoned off area on platform 1, it looks like at least 1 of the upright columns is now starting to slope. There is definitely some rust at the bottom of the wider upright in the photo but when I zoom in, it looks a lot worse at the top of the red painted section where it meets the girder going across. These uprights were all repainted a few months ago but I think it was only the blue and white parts.

Yes, can confirm as others have said, Northern are using the far end of platform 1. The only access for Northern passengers at the far end of platform 1 is now via platform 3 as the cordoned off area extends along platform 1 to the slope leading to the subway.

View attachment 118256View attachment 118257
Just to clarify, the post of Platform 1 that is of concern is the one at the right of your first photo with the signs on. Can't see from that angle but it's warped if you look from the right side of it
 

FuzzyDuck

Member
Joined
28 Mar 2020
Messages
163
Location
North Hampshire
Another thing, anyone know what's going on with Crewe P10, it's has nogo, on signal diagrams for the last couple of weeks (before the recent heatwave), seen the Chester shuttle arriving 40 minutes late, because waiting for the AWC Voyager on P9 to depart, the Chester shuttle would have gone onto P10 normally?
Recently I've seen a Voyager on P9 become blocked by a pair of 153's that would normally go to P10.
 

Sheridan

Member
Joined
11 Jan 2012
Messages
617
Recently I've seen a Voyager on P9 become blocked by a pair of 153's that would normally go to P10.

Yep, the TfW usually goes into 6 instead but if that’s not available they’ll put it on top of the Avanti. Long walk for the passengers to the main concourse!
 

Trainfan2019

Member
Joined
9 Aug 2019
Messages
528
Back at Crewe and platform 1 is more accessible now the barriers cover a smaller area. Close up photo of the damaged upright.

IMG_20220729_144320.jpg

It might be my eyesight but I'm sure the upright to the left of the one above is leaning a bit.

The damage to platform 6 is now fixed.
 