Crewe has had a lot of work done recently albeit in a piecemeal way with parts of the station being upgraded independently of each other rather than as some overall plan. My question is twofold. Does this mean the plan to move the station is now scrapped and is there a plan to renovate the rest of the station? It is quite a shock to see the contrast between those bits that have been refurbed and those still to be done.
Many thanks
Many thanks