They will know what trains they want by the end of 2017 and will be out procuring, will bet money on it. They will test them on the existing network to get the fault free miles too.
They aim to have classic compatible train services running to all Scotland, Birmingham, Liverpool and Manchester by 2026 (on full High Speed track only up to Lichfield/Crewe).
They will need more trains by 2033 when the line through Sheffield opens, but even here some of these will be classic compatible for services to Newcastle. Possible even all services re Sheffield wanting a city centre station rather than an out of town one.
My bet is that track being built to European gauge is just spending our money on box ticking because European law compels them to build to European gauge. Considering forward what they will need to run and when, and the options to cascade stock down, the fact that there will be nowhere (in the country) to cascade the full European gauge trains to, my bet is that full gauge trains won't ever be used, and that the High Speed fleet will be entirely "classic compatible" (ie normal sized) regardless of the track it runs on.
My bet is that track being built to European gauge is just spending our money on box ticking because European law compels them to build to European gauge. Considering forward what they will need to run and when, and the options to cascade stock down, the fact that there will be nowhere (in the country) to cascade the full European gauge trains to, my bet is that full gauge trains won't ever be used, and that the High Speed fleet will be entirely "classic compatible" (ie normal sized) regardless of the track it runs on.
There is more than one option for the hub, autumn statement announcement I would expect. As for the current station being too far from the town centre, they have had the best part of 180 years to do something about it.
Crewe town centre is actually in the north west corner of the town which has expanded in a disorganised way. Cheshire East Council have drawn up plans for a new town centre on the site of the current station and neighbouring low value land. They would prefer for the HS2 station to be just south of the current station and not a couple of miles south (another option). I think its the best idea.
Any news on how Crewe Hub proposals are progressing?
I have been advised that HS2 Ltd (or possibly Network Rail) have applied for a 'Certificate of Immunity' regarding the existing Crewe Station site.
This would "preclude the local planning authority ... from serving a building preservation notice in relation to it" for 5 years - plenty of time to knock it all down.
I understand there is opposition to this application.
Whilst I am quick to criticise the state of the current station (leaking roofs, unfinished works etc.), I do appreciate that some of the buildings are very old and may have historical significance.
I'm sure the designers of the new hub station will not want to be constrained by listed buildings in the middle of the new track layout, but they should take into account Crewe's railway heritage.
So move the town centre next to the station, then move the station away.
Sounds like a lousy idea to me I'm afraid.
Under the councils proposals the HS2 station would be on the southern boundary of the new town centre. Its not a lousy idea, it would mean a much shorter walk from station to town centre and a town centre that was at the geographic centre of the town not in a corner. The area next to the current centre is very run down and therefore the best and easiest part of Crewe to redevelop.
Nothing to stop you doing that anyway as you will have some sort of connection as part of 2A. The tunnel portal doesnt really matter.
Isn't the plan to move the station to roughly where the current freight yard is? If so the connections to the north are still available, and the Stoke and Shrewsbury connections can be maintained with relatively short chords.Then there's the little matter of the current station actually being where the railway lines meet - which is kind of what the station exists for, or so I'm led to believe.
Isn't the plan to move the station to roughly where the current freight yard is? If so the connections to the north are still available, and the Stoke and Shrewsbury connections can be maintained with relatively short chords.
Then there's the little matter of the current station actually being where the railway lines meet - which is kind of what the station exists for, or so I'm led to believe.
Been wondering what's happening about Crewe as it's all been very qioet from HS2 and the Government. My preference would be new station at Basford and retain Nantwich road as a far smaller station for local stoppers. Is that in amy way feasible?
Is there a specific reason for the 'Manchester link' - seems a pretty sharp curve? Why not just leave on the existing line?I did a sketch a while back illustrating some potential new station sites and connecting lines around a new hub site..
Is there a specific reason for the 'Manchester link' - seems a pretty sharp curve? Why not just leave on the existing line?
Manchester - Shrewsbury axis trains would have to reverse at the new hub without the new Nantwich link shown. Reversal might add 5 minutes plus to the journey time even if done very slickly as at Bradford Interchange and Sheffield, but would the TOC on that route be interested? Would they be likely to miss out the call altogether on all or some trains to avoid the time penalty?
Because these trains can only use two platforms at Crewe today and conflict with every other through train using the station, I think you'll find their timetable padding in the Crewe area amounts to at least as much time as would be needed for a reversal, so I don't see the "Nantwich link" happening
I agree also with najaB that Manchester link isn't necessary either - by demolishing the existing station it should be possible to build a new junction which can be taken at close to the speeds the trains will be doing anyway when accelerating/decelerating for a stop at the Hub.
At Phase 2A and prior to Phase 2B it is not possible to send Double-Decker trains onwards.
It can be expected that operating costs (and therefore fares) on Double-Decker trains will be a fraction of costs on classic-compatible trains.