Moderator note - split from


4 all the way to from Charing Cross to London Bridge, but it functionally goes down to 2 tracks between Ewer Street Junction and London Bridge, where Southeastern use 2 of the lines and Thameslink use the other 2 lines.
I have previously noticed this track layout as well, so I was thinking, since it drops down to 2 tracks between Ewer Street Junction and London Bridge (which I presume is the bottleneck), there is no need for 4 platforms at Waterloo East?

They could do a more intensive 2 platform service. So if someone was starting at Waterloo East and going to Charing Cross or London Bridge, they could just turn up at the platform without checking which platform the next train departs.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

4-SUB 4732

Established Member
Joined
7 Jan 2018
Messages
2,150
I have previously noticed this track layout as well, so I was thinking, since it drops down to 2 tracks between Ewer Street Junction and London Bridge (which I presume is the bottleneck), there is no need for 4 platforms at Waterloo East?

They could do a more intensive 2 platform service. So if someone was starting at Waterloo East and going to Charing Cross or London Bridge, they could just turn up at the platform without checking which platform the next train departs.
Not entirely. For the same reason you need two up and two down London Bridge platforms, you need the same at Waterloo East.

Chiefly because in the high intensity service which used to run (I had it down as up to 26 trains an hour?), to attempt to gain even a 30 second stop, followed by at least 120 seconds platform reoccupation, you are not able to slot it all in. Add a person needing an ambulance and it’s all gone to pot.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
I have previously noticed this track layout as well, so I was thinking, since it drops down to 2 tracks between Ewer Street Junction and London Bridge (which I presume is the bottleneck), there is no need for 4 platforms at Waterloo East?

They could do a more intensive 2 platform service. So if someone was starting at Waterloo East and going to Charing Cross or London Bridge, they could just turn up at the platform without checking which platform the next train departs.
You need four platforms due to the intensity of the service. The next train can arrive while the previous one is departing, same as how it works at London Bridge
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,972
Location
Airedale
With slam door stock you could probably get 20tph at one platform - Clapham Jn on the SWD Down Local must have been not far short in the 70s, when everything stopped there, but I can't quickly check - but that's well short of what is needed.
 

Andrew S

Member
Joined
4 Aug 2018
Messages
187
I'd imagine that six platforms at Charing Cross going into two tracks would create lots of conflicting moves and potential for blocking back if trains are running out of sequence.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,692
Location
Hope Valley
I see to recall a time during the darkest days under Network SouthEast that on Sundays the limited service was confined to the central island, with a lot of switching of tracks, of course. This was to economise on despatch staff in the days of slam doors.
 

miklcct

Established Member
Joined
2 May 2021
Messages
5,017
Location
Cricklewood
Not entirely. For the same reason you need two up and two down London Bridge platforms, you need the same at Waterloo East.

Chiefly because in the high intensity service which used to run (I had it down as up to 26 trains an hour?), to attempt to gain even a 30 second stop, followed by at least 120 seconds platform reoccupation, you are not able to slot it all in. Add a person needing an ambulance and it’s all gone to pot.
The Victoria line has much more intensity, and the Thameslink has similar capacity with only two tracks. Just upgrade the signalling system and install ATO can vastly improve capacity, which I believe all main lines should be equipped.

Train stop can be reduced to 20 seconds and a moving block system can be installed, allowing trains to run in close succession.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,692
Location
Hope Valley
Neither the Victoria Line nor Thameslink are approaching a rather constrained terminus (Charing Cross).
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,303
What seems to have been missed is that the four platforms are not actually operated “like London Bridge”, they are “paired by use” at Waterloo East, but the four are “paired by direction” at London Bridge. The paired by use mode starts at Ewer St, and allows Charing Cross to be effectively used as two adjacent 3 platform stations. This is more efficient than sorting out all the up/down crossing conflicts at the Charing Cross throat.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,972
Location
Airedale
The Victoria line has much more intensity, and the Thameslink has similar capacity with only two tracks. Just upgrade the signalling system and install ATO can vastly improve capacity, which I believe all main lines should be equipped.

Train stop can be reduced to 20 seconds and a moving block system can be installed, allowing trains to run in close succession.
Thameslink has a theoretical capacity of 24tph (which AFAIK has not been tested beyond 20), using one type of rolling stock on a plain double track section and stations (re)built to cope. That is less than the proven capacity, 28tph, of the route through WAE and of CHX station, where none of the above apply.
In this particular case your suggestion isn't worth pursuing.
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
Thameslink has a theoretical capacity of 24tph (which AFAIK has not been tested beyond 20), using one type of rolling stock on a plain double track section and stations (re)built to cope. That is less than the proven capacity, 28tph, of the route through WAE and of CHX station, where none of the above apply.
In this particular case your suggestion isn't worth pursuing.
Thameslink has a theoretical capacity of 30tph. You would never operate a line at it’s full theoretical capacity as it would remove any pathing allowance etc.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,897
Thameslink has a theoretical capacity of 30tph.

It doesn’t. It has a theoretical capacity of 120second intervals between trains for short periods during disruption, requiring ATO on all services* and 45 second dwells. Very definitely not for an hour.

* and we are a long way from ATO on all services.
 

4-SUB 4732

Established Member
Joined
7 Jan 2018
Messages
2,150
The Victoria line has much more intensity, and the Thameslink has similar capacity with only two tracks. Just upgrade the signalling system and install ATO can vastly improve capacity, which I believe all main lines should be equipped.

Train stop can be reduced to 20 seconds and a moving block system can be installed, allowing trains to run in close succession.
You have single traction types with identical braking and acceleration curves, and various automations.

375/376/465/707 mixed traction, all different, no chance of automation investment and the fact it is not a suitable candidate for the requisite works to make your ideas work…
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
It doesn’t. It has a theoretical capacity of 120second intervals between trains for short periods during disruption, requiring ATO on all services* and 45 second dwells. Very definitely not for an hour.

* and we are a long way from ATO on all services.

But 3600 / 120 is 30tph?

Obviously it would never be used at that capacity except in disruption - but surely isn’t that the point of theoretical capacity?
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Moderator note - split from



I have previously noticed this track layout as well, so I was thinking, since it drops down to 2 tracks between Ewer Street Junction and London Bridge (which I presume is the bottleneck), there is no need for 4 platforms at Waterloo East?

They could do a more intensive 2 platform service. So if someone was starting at Waterloo East and going to Charing Cross or London Bridge, they could just turn up at the platform without checking which platform the next train departs.
Reducing platforms from 4 to 2 just adds to the bottleneck that kind of should be avoided.

There are many stations in the UK that wouldn't be able to operate well without All their platforms.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,897
But 3600 / 120 is 30tph?

Obviously it would never be used at that capacity except in disruption - but surely isn’t that the point of theoretical capacity?

it‘s only 30trains per hour if 120sec headways were to be used for the whole hour. Which they are never proposed or planned to be, not even in disruption. The specification for the Thameslink core was very definitley not 30tph in disruption, but for 120second intervals for a short duration. This is a crucial difference.
 

Kingston Dan

Member
Joined
19 Apr 2020
Messages
353
Location
N Yorks
What seems to have been missed is that the four platforms are not actually operated “like London Bridge”, they are “paired by use” at Waterloo East, but the four are “paired by direction” at London Bridge. The paired by use mode starts at Ewer St, and allows Charing Cross to be effectively used as two adjacent 3 platform stations. This is more efficient than sorting out all the up/down crossing conflicts at the Charing Cross throat.
I always thought for passenger convenience when they four tracked Borough Market they missed the opportunity to create two islands at Waterloo East for up and down services (mainly due to my then frequent dashes between platforms A/C or B/D for the first train). But this makes a lot of sense.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,897
I always thought for passenger convenience when they four tracked Borough Market they missed the opportunity to create two islands at Waterloo East for up and down services (mainly due to my then frequent dashes between platforms A/C or B/D for the first train). But this makes a lot of sense.

it would be horribly inconvenient for passengers, as there would be fewer trains. Draw the track layout, and then work out how to do platforming at Charing Cross.
 

Kingston Dan

Member
Joined
19 Apr 2020
Messages
353
Location
N Yorks
it would be horribly inconvenient for passengers, as there would be fewer trains. Draw the track layout, and then work out how to do platforming at Charing Cross.
No I can see that - I guess it's why four tracks separated by direction only happens some distance from the terminal (Finsbury Park, Earlsfield etc).
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,303
@
No I can see that - I guess it's why four tracks separated by direction only happens some distance from the terminal (Finsbury Park, Earlsfield etc).
Yes, it seems to be a fairly well established principle that separation into logical groups is the best way of operating a terminus, and that’s exactly why the flyover between Wimbledon and Earlsfield exists, but where there are many grade separated branches on both sides, such as on the SWML towards Basingstoke, then pairing by direction is the optimum layout.
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
977
Location
UK
Thameslink has a theoretical capacity of 24tph (which AFAIK has not been tested beyond 20), using one type of rolling stock on a plain double track section and stations (re)built to cope. That is less than the proven capacity, 28tph, of the route through WAE and of CHX station, where none of the above apply.
In this particular case your suggestion isn't worth pursuing.

Has the route from Charing Cross ever been 4-tracked all the way into London Bridge?
I'm looking at a pre-Thameslink-remodelling London Bridge and it also narrows to 2 tracks on approach to London Bridge.

I'm guessing it's 4-tracked at Waterloo East because of historical reasons. Because it wouldn't make financial sense if there was always a 2-track bottleneck somewhere.

As you mentioned, the current layout can handle 28tph. Let's say a 2 track layout at Waterloo East can handle 20tph (this is a guess). The infrastructure is then duplicated to 4-track, but it can only handle 8tph more. If you were to spend a lot of money duplicating infrastructure, I would imagine you want it to handle 40tph.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,897
The infrastructure is then duplicated to 4-track, but it can only handle 8tph more.

With a doubled layout might handle 2x20 tph between London Bridge and Waterloo East, Charing Cross couldn’t, and neither could the network east of London Bridge.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,621
Location
Northampton
As you mentioned, the current layout can handle 28tph. Let's say a 2 track layout at Waterloo East can handle 20tph (this is a guess). The infrastructure is then duplicated to 4-track, but it can only handle 8tph more. If you were to spend a lot of money duplicating infrastructure, I would imagine you want it to handle 40tph.
A lot of people seem to be forgetting that flat junctions are also a determinent of capacity.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,972
Location
Airedale
Has the route from Charing Cross ever been 4-tracked all the way into London Bridge?
I'm looking at a pre-Thameslink-remodelling London Bridge and it also narrows to 2 tracks on approach to London Bridge.
No.
I'm guessing it's 4-tracked at Waterloo East because of historical reasons. Because it wouldn't make financial sense if there was always a 2-track bottleneck somewhere.
Yes and no.
Before WW1 some trains ran to Charing X via Cannon St, so there was a second route.
As stated already, 2 tracks with platforms at WAE would have lower capacity than 2 tracks without at Borough Market or anywhere else.
 