I was just watching a YouTube video, that was referenced earlier in the thread. The driver who made it and downloaded it mentioned that the two viaducts between Neville Hill sidings and Leeds Station were being rebuilt.
My question is simply, will they be rebuilt "as is", that is to say as two track, or will they be widening them to four track?
It just seems to me that it would be wise to four track them while all the building work is happening to save all the disruption if they need to be widened later.
I was just watching a YouTube video, that was referenced earlier in the thread. The driver who made it and downloaded it mentioned that the two viaducts between Neville Hill sidings and Leeds Station were being rebuilt.
My question is simply, will they be rebuilt "as is", that is to say as two track, or will they be widening them to four track?
It just seems to me that it would be wise to four track them while all the building work is happening to save all the disruption if they need to be widened later.