Given LNERs capacity constraints, especially on the flagship London-Edinburgh route, which is now a self contained shuttle, would it be possible for the 897 order to be varied back to BEMUs, with no diesel power and batteries with a range of 30-50 miles for OHLE failures and some diversions. They would also be extended to 12 coaches and used on the London-York-Newcastle-Edinburgh services alongside a couple of 801s, set up so the busiest services are run by 897s. This would allow LNER to have an approximately 20% capacity upgrade on its flagship service at a relatively limited cost.
